If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254253614002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.180373,"lon":-113.369728,"icon":""}]} |
Location: 00/14-36-025-25W4/2 | |
Location Alias: 00/14-36-25-25 W4M | |
Location Alias 2: 00/14-36-025-25 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 25 | |
Section: 36 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 14-36-25-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0270536 | |
License Date: 2002-06-03 | |
License Status: Issued | |
Spud Date: 2002-06-06 | |
Final Drill Date: 2002-06-18 | |
Well Total Depth: 965.00 m | |
Surface Hole Latitude: 51.180373 | |
Surface Hole Longitude: -113.369728 |
Date | Event |
---|---|
2002-06-03 | Obtained License |
2002-06-06 | Surface Casing Operation Performed |
2002-06-18 | Finished Drilling |
2002-06-18 | Well Mode changed to Drilled and Cased |
2002-06-19 | Production Casing Operation Performed |
2002-06-19 | Rig Released |
2002-07-29 | Well Log Performed |
2002-09-04 | Perforation Treatment Performed - Jet Perforation |
2002-10-18 | Perforation Treatment Performed - Jet Perforation |
2002-10-19 | Well Fluid changed to Gas |
2002-10-19 | Well Mode changed to Testing |
2002-12-11 | Perforation Treatment Performed - Fractured |
2003-06-15 | Perforation Treatment Performed - Jet Perforation |
2003-06-15 | Perforation Treatment Performed - Remedial Casing |
2003-08-28 | Well Structure changed to Commingled |
2007-01-19 | Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem |
2007-01-25 | Perforation Treatment Performed - Jet Perforation |
2007-01-25 | Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem |
2007-02-03 | Perforation Treatment Performed - Fractured |
2007-02-16 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2002-09-04 | Perforation | 874.00 | 877.00 | 13 |
2002-12-11 | Fracture | 801.50 | 803.50 | 0 |
2002-12-11 | Fracture | 781.50 | 783.50 | 0 |
2002-12-11 | Fracture | 637.00 | 640.00 | 0 |
2002-12-11 | Fracture | 468.00 | 471.00 | 0 |
2003-06-15 | Perforation | 210.00 | 211.00 | 13 |
2003-06-15 | Remedial Casing Cementing | 210.00 | 211.00 | 0 |
2007-01-19 | Packing Dev Cpd w/Res-Gyp Cem | 867.00 | 870.00 | 0 |
2007-01-25 | Packing Dev Cpd w/Res-Gyp Cem | 657.00 | 660.00 | 0 |
2007-01-25 | Perforation | 588.60 | 589.10 | 13 |
2007-01-25 | Perforation | 575.80 | 576.80 | 13 |
2002-10-18 | Perforation | 825.00 | 828.00 | 13 |
2007-01-25 | Perforation | 574.70 | 575.20 | 13 |
2007-01-25 | Perforation | 541.10 | 541.60 | 13 |
2007-01-25 | Perforation | 539.40 | 540.40 | 13 |
2007-01-25 | Perforation | 534.50 | 535.50 | 13 |
2007-01-25 | Perforation | 529.20 | 530.20 | 13 |
2007-01-25 | Perforation | 518.80 | 519.30 | 13 |
2007-01-25 | Perforation | 512.20 | 513.20 | 13 |
2007-01-25 | Perforation | 504.60 | 505.10 | 13 |
2007-01-25 | Perforation | 466.70 | 467.70 | 13 |
2007-01-25 | Perforation | 464.60 | 465.10 | 13 |
2002-10-18 | Perforation | 801.50 | 803.50 | 13 |
2007-01-25 | Perforation | 445.60 | 446.10 | 13 |
2007-01-25 | Perforation | 436.10 | 436.60 | 13 |
2007-01-25 | Perforation | 432.90 | 433.40 | 13 |
2007-01-25 | Perforation | 422.40 | 422.90 | 13 |
2007-01-25 | Perforation | 420.10 | 420.60 | 13 |
2007-01-25 | Perforation | 416.60 | 417.10 | 13 |
2007-01-25 | Perforation | 413.70 | 414.20 | 13 |
2007-01-25 | Perforation | 399.90 | 400.40 | 13 |
2007-01-25 | Perforation | 397.30 | 397.80 | 13 |
2007-01-25 | Perforation | 393.40 | 393.90 | 13 |
2002-10-18 | Perforation | 781.50 | 783.50 | 13 |
2007-01-25 | Perforation | 392.30 | 392.80 | 13 |
2007-01-25 | Perforation | 342.80 | 343.30 | 13 |
2007-01-25 | Perforation | 338.40 | 338.90 | 13 |
2007-01-25 | Perforation | 303.80 | 304.30 | 13 |
2007-01-25 | Perforation | 288.70 | 289.20 | 13 |
2007-01-25 | Perforation | 273.80 | 274.30 | 13 |
2007-01-25 | Perforation | 265.60 | 266.10 | 13 |
2007-02-03 | Fracture | 265.60 | 589.10 | 0 |
2002-10-18 | Perforation | 718.50 | 720.50 | 13 |
2002-10-18 | Perforation | 662.00 | 665.00 | 13 |
2002-10-18 | Perforation | 637.00 | 640.00 | 13 |
2002-10-18 | Perforation | 468.00 | 471.00 | 13 |
2002-10-18 | Perforation | 387.00 | 390.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2002 | 48 | 0.0 | 0.0 | 0.0 |
For data sources see[5]