If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254252002000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.142743,"lon":-113.453903,"icon":""}]} |
Location: 00/02-20-025-25W4/0 | |
Location Alias: 00/02-20-25-25 W4M | |
Location Alias 2: 00/02-20-025-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 25 | |
Section: 20 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 2-20-25-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0315664 | |
License Date: 2004-09-30 | |
License Status: Issued | |
Spud Date: 2005-01-16 | |
Final Drill Date: 2005-01-19 | |
Well Total Depth: 923.00 m | |
Surface Hole Latitude: 51.142743 | |
Surface Hole Longitude: -113.453903 |
Date | Event |
---|---|
2004-09-30 | Obtained License |
2005-01-16 | Surface Casing Operation Performed |
2005-01-19 | Finished Drilling |
2005-01-19 | Production Casing Operation Performed |
2005-01-19 | Rig Released |
2005-01-19 | Well Mode changed to Drilled and Cased |
2005-01-25 | Well Log Performed |
2005-02-07 | Perforation Treatment Performed - Jet Perforation |
2005-04-23 | Perforation Treatment Performed - Fractured |
2005-04-27 | Well Fluid changed to Gas |
2005-04-27 | Well Mode changed to Testing |
2005-05-10 | Perforation Treatment Performed - Jet Perforation |
2005-07-18 | Perforation Treatment Performed - Fractured |
2005-08-31 | Perforation Treatment Performed - Jet Perforation |
2005-09-29 | Perforation Treatment Performed - Fractured |
2005-10-18 | Well Began Production |
2005-10-18 | Well Fluid changed to Gas |
2005-10-18 | Well Mode changed to Flowing |
2009-02-25 | Perforation Treatment Performed - Jet Perforation |
2009-03-11 | Perforation Treatment Performed - Fractured |
2009-03-19 | Well Fluid changed to Coalbed Methane-Coals and Other |
2009-03-19 | Well Mode changed to Flowing |
2010-07-12 | Perforation Treatment Performed - Jet Perforation |
2010-08-20 | Perforation Treatment Performed - Fractured |
2010-08-24 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-02-07 | Perforation | 811.00 | 813.00 | 13 |
2009-02-25 | Perforation | 577.80 | 578.30 | 13 |
2009-02-25 | Perforation | 575.70 | 576.20 | 13 |
2009-02-25 | Perforation | 533.60 | 534.10 | 13 |
2009-02-25 | Perforation | 532.10 | 533.10 | 13 |
2009-02-25 | Perforation | 524.80 | 525.80 | 13 |
2009-02-25 | Perforation | 518.70 | 519.20 | 13 |
2009-02-25 | Perforation | 505.70 | 508.70 | 13 |
2009-02-25 | Perforation | 502.00 | 503.00 | 13 |
2009-02-25 | Perforation | 458.00 | 459.00 | 13 |
2009-02-25 | Perforation | 454.00 | 455.00 | 13 |
2005-02-07 | Perforation | 777.00 | 780.00 | 13 |
2009-02-25 | Perforation | 452.00 | 453.00 | 13 |
2009-02-25 | Perforation | 437.30 | 439.30 | 13 |
2009-02-25 | Perforation | 434.40 | 434.90 | 13 |
2009-02-25 | Perforation | 415.30 | 415.80 | 13 |
2009-02-25 | Perforation | 411.20 | 411.70 | 13 |
2009-02-25 | Perforation | 403.60 | 404.10 | 13 |
2009-02-25 | Perforation | 397.90 | 398.40 | 13 |
2009-02-25 | Perforation | 391.10 | 392.10 | 13 |
2009-02-25 | Perforation | 333.70 | 334.20 | 13 |
2009-02-25 | Perforation | 285.40 | 285.90 | 13 |
2005-02-07 | Perforation | 706.00 | 708.00 | 13 |
2009-02-25 | Perforation | 273.40 | 273.90 | 13 |
2009-02-25 | Perforation | 237.10 | 237.60 | 13 |
2009-03-11 | Fracture | 237.10 | 578.30 | 0 |
2010-07-12 | Perforation | 869.00 | 872.00 | 13 |
2010-07-12 | Perforation | 854.00 | 857.00 | 13 |
2010-07-12 | Perforation | 636.50 | 638.50 | 13 |
2010-07-12 | Perforation | 318.50 | 321.00 | 13 |
2010-07-12 | Perforation | 305.50 | 308.00 | 13 |
2010-07-12 | Perforation | 209.00 | 211.00 | 13 |
2010-08-20 | Fracture | 869.00 | 872.00 | 0 |
2005-04-23 | Fracture | 777.00 | 780.00 | 0 |
2010-08-20 | Fracture | 636.50 | 638.50 | 0 |
2010-08-20 | Fracture | 318.50 | 321.00 | 0 |
2010-08-20 | Fracture | 305.50 | 308.00 | 0 |
2010-08-20 | Fracture | 209.00 | 211.00 | 0 |
2005-04-23 | Fracture | 706.00 | 708.00 | 0 |
2005-05-10 | Perforation | 648.00 | 651.00 | 13 |
2005-07-18 | Fracture | 648.00 | 651.00 | 0 |
2005-08-31 | Perforation | 376.00 | 379.00 | 13 |
2005-09-29 | Fracture | 376.00 | 379.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 1772 | 0.0 | 0.0 | 0.0 |
2006 | 8748 | 0.0 | 0.0 | 0.0 |
2007 | 8732 | 0.0 | 0.0 | 0.0 |
2008 | 7344 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 4415 | 0.0 | 0.0 | 0.0 |
For data sources see[5]