If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254251802002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.127968,"lon":-113.478228,"icon":""}]} |
Location: 00/02-18-025-25W4/2 | |
Location Alias: 00/02-18-25-25 W4M | |
Location Alias 2: 00/02-18-025-25 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 25 | |
Section: 18 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 2-18-25-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0318308 | |
License Date: 2004-11-04 | |
License Status: Issued | |
Spud Date: 2005-01-17 | |
Final Drill Date: 2005-01-22 | |
Well Total Depth: 714.00 m | |
Surface Hole Latitude: 51.127968 | |
Surface Hole Longitude: -113.478228 |
Date | Event |
---|---|
2004-11-04 | Obtained License |
2005-01-17 | Surface Casing Operation Performed |
2005-01-22 | Finished Drilling |
2005-01-22 | Well Mode changed to Drilled and Cased |
2005-01-23 | Production Casing Operation Performed |
2005-01-23 | Rig Released |
2005-01-25 | Well Log Performed |
2005-02-07 | Perforation Treatment Performed - Jet Perforation |
2005-02-20 | Perforation Treatment Performed - Fractured |
2005-04-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-04-23 | Plug Back Performed |
2005-05-04 | Perforation Treatment Performed - Jet Perforation |
2005-05-11 | Perforation Treatment Performed - Fractured |
2005-06-15 | Well Began Production |
2005-06-15 | Well Fluid changed to Coalbed Methane-Coals Only |
2005-06-15 | Well Mode changed to Flowing |
2010-07-12 | Perforation Treatment Performed - Jet Perforation |
2010-08-20 | Perforation Treatment Performed - Fractured |
2010-08-25 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-08-25 | Well Mode changed to Flowing |
2010-12-14 | Perforation Treatment Performed - Jet Perforation |
2010-12-20 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-02-07 | Perforation | 657.00 | 661.00 | 13 |
2005-05-04 | Perforation | 510.70 | 511.20 | 13 |
2005-05-04 | Perforation | 509.20 | 509.70 | 13 |
2005-05-04 | Perforation | 458.90 | 459.40 | 13 |
2005-05-04 | Perforation | 440.30 | 440.80 | 13 |
2005-05-04 | Perforation | 435.60 | 436.10 | 13 |
2005-05-04 | Perforation | 429.70 | 430.20 | 13 |
2005-05-04 | Perforation | 413.70 | 414.20 | 13 |
2005-05-04 | Perforation | 408.90 | 409.40 | 13 |
2005-05-04 | Perforation | 385.70 | 386.20 | 13 |
2005-05-04 | Perforation | 342.80 | 343.30 | 13 |
2005-02-20 | Fracture | 657.00 | 661.00 | 0 |
2005-05-04 | Perforation | 286.70 | 287.20 | 13 |
2005-05-04 | Perforation | 265.30 | 265.80 | 13 |
2005-05-04 | Perforation | 256.50 | 257.00 | 13 |
2005-05-04 | Perforation | 240.30 | 240.80 | 13 |
2005-05-04 | Perforation | 210.30 | 210.80 | 13 |
2005-05-11 | Fracture | 210.30 | 574.70 | 0 |
2010-07-12 | Perforation | 488.00 | 490.50 | 13 |
2010-07-12 | Perforation | 421.50 | 424.50 | 13 |
2010-07-12 | Perforation | 316.00 | 320.00 | 13 |
2010-07-12 | Perforation | 183.00 | 185.00 | 13 |
2005-04-23 | Packing Device Capped w/Cement | 641.50 | 649.50 | 0 |
2010-08-20 | Fracture | 488.00 | 490.50 | 0 |
2010-08-20 | Fracture | 421.50 | 424.50 | 0 |
2010-08-20 | Fracture | 316.00 | 320.00 | 0 |
2010-12-14 | Perforation | 233.00 | 235.00 | 13 |
2010-12-14 | Perforation | 346.00 | 348.00 | 13 |
2010-12-20 | Fracture | 233.00 | 348.00 | 0 |
2010-12-20 | Fracture | 210.30 | 574.70 | 0 |
2005-05-04 | Perforation | 574.20 | 574.70 | 13 |
2005-05-04 | Perforation | 538.40 | 538.90 | 13 |
2005-05-04 | Perforation | 536.10 | 536.60 | 13 |
2005-05-04 | Perforation | 532.20 | 532.70 | 13 |
2005-05-04 | Perforation | 526.00 | 526.50 | 13 |
2005-05-04 | Perforation | 512.70 | 513.20 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 4123 | 0.0 | 0.0 | 0.0 |
2006 | 8748 | 0.0 | 0.0 | 0.0 |
2007 | 8732 | 0.0 | 0.0 | 0.0 |
2008 | 8087 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 7295 | 0.0 | 0.0 | 0.0 |
2011 | 8341 | 0.0 | 0.0 | 0.0 |
2012 | 8723 | 0.0 | 0.0 | 0.0 |
2013 | 8634 | 0.0 | 0.0 | 0.0 |
2014 | 8645 | 0.0 | 0.0 | 0.0 |
2015 | 8577 | 0.0 | 0.0 | 0.0 |
2016 | 8726 | 0.0 | 0.0 | 0.0 |
2017 | 8709 | 0.0 | 0.0 | 0.0 |
2018 | 8717 | 0.0 | 0.0 | 0.0 |
2019 | 8563 | 0.0 | 0.0 | 0.0 |
2020 | 2165 | 0.0 | 0.0 | 0.0 |
For data sources see[5]