If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254251609000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.13351,"lon":-113.424528,"icon":""}]} |
Location: 00/09-16-025-25W4/0 | |
Location Alias: 00/09-16-25-25 W4M | |
Location Alias 2: 00/09-16-025-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 25 | |
Section: 16 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 9-16-25-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0379030 | |
License Date: 2007-07-09 | |
License Status: Issued | |
Spud Date: 2007-08-17 | |
Final Drill Date: 2007-08-19 | |
Well Total Depth: 697.00 m | |
Surface Hole Latitude: 51.133510 | |
Surface Hole Longitude: -113.424528 |
Date | Event |
---|---|
2007-07-09 | Obtained License |
2007-08-17 | Surface Casing Operation Performed |
2007-08-19 | Finished Drilling |
2007-08-19 | Production Casing Operation Performed |
2007-08-19 | Rig Released |
2007-08-19 | Well Mode changed to Drilled and Cased |
2007-08-22 | Well Log Performed |
2007-09-06 | Well Log Performed |
2007-09-22 | Perforation Treatment Performed - Jet Perforation |
2007-10-05 | Perforation Treatment Performed - Jet Perforation |
2007-10-22 | Perforation Treatment Performed - Jet Perforation |
2007-10-29 | Perforation Treatment Performed - Fractured |
2007-11-08 | Well Began Production |
2007-11-08 | Well Fluid changed to Coalbed Methane-Coals and Other |
2007-11-08 | Well Mode changed to Flowing |
2010-10-23 | Perforation Treatment Performed - Jet Perforation |
2010-11-06 | Perforation Treatment Performed - Fractured |
2011-02-18 | Perforation Treatment Performed - Fractured |
2011-03-02 | Perforation Treatment Performed - Fractured |
2011-03-11 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-03-11 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2007-09-22 | Perforation | 647.00 | 650.00 | 13 |
2007-10-22 | Perforation | 500.40 | 500.90 | 13 |
2007-10-22 | Perforation | 448.20 | 448.70 | 13 |
2007-10-22 | Perforation | 444.60 | 446.60 | 13 |
2007-10-22 | Perforation | 432.20 | 433.20 | 13 |
2007-10-22 | Perforation | 425.80 | 426.30 | 13 |
2007-10-22 | Perforation | 405.90 | 406.90 | 13 |
2007-10-22 | Perforation | 401.90 | 402.40 | 13 |
2007-10-22 | Perforation | 394.30 | 394.80 | 13 |
2007-10-22 | Perforation | 390.80 | 391.30 | 13 |
2007-10-22 | Perforation | 387.70 | 388.70 | 13 |
2007-10-05 | Perforation | 450.00 | 452.00 | 13 |
2007-10-22 | Perforation | 382.80 | 383.30 | 13 |
2007-10-22 | Perforation | 291.80 | 292.30 | 13 |
2007-10-22 | Perforation | 289.10 | 289.60 | 13 |
2007-10-22 | Perforation | 271.90 | 272.40 | 13 |
2007-10-22 | Perforation | 271.00 | 271.50 | 13 |
2007-10-22 | Perforation | 262.10 | 262.60 | 13 |
2007-10-22 | Perforation | 206.10 | 206.60 | 13 |
2007-10-29 | Fracture | 206.10 | 566.70 | 0 |
2010-10-23 | Perforation | 624.50 | 627.50 | 13 |
2010-10-23 | Perforation | 568.00 | 569.50 | 13 |
2007-10-22 | Perforation | 374.50 | 375.50 | 13 |
2010-10-23 | Perforation | 557.00 | 559.50 | 13 |
2010-10-23 | Perforation | 482.00 | 483.50 | 13 |
2010-10-23 | Perforation | 471.00 | 473.00 | 13 |
2010-10-23 | Perforation | 418.00 | 420.50 | 13 |
2010-10-23 | Perforation | 359.50 | 362.00 | 13 |
2010-10-23 | Perforation | 317.00 | 319.00 | 13 |
2010-10-23 | Perforation | 302.50 | 305.00 | 13 |
2010-11-06 | Fracture | 647.00 | 650.00 | 0 |
2011-02-18 | Fracture | 418.00 | 420.50 | 0 |
2011-02-18 | Fracture | 359.00 | 362.00 | 0 |
2007-10-22 | Perforation | 566.20 | 566.70 | 13 |
2011-02-18 | Fracture | 317.00 | 319.00 | 0 |
2011-02-18 | Fracture | 302.50 | 305.00 | 0 |
2011-03-02 | Fracture | 566.20 | 566.70 | 0 |
2011-03-02 | Fracture | 500.40 | 531.60 | 0 |
2011-03-02 | Fracture | 425.80 | 448.70 | 0 |
2011-03-02 | Fracture | 382.80 | 406.90 | 0 |
2011-03-02 | Fracture | 262.10 | 292.30 | 0 |
2011-03-02 | Fracture | 557.00 | 559.50 | 0 |
2011-03-02 | Fracture | 450.00 | 483.50 | 0 |
2007-10-22 | Perforation | 531.10 | 531.60 | 13 |
2007-10-22 | Perforation | 530.10 | 530.60 | 13 |
2007-10-22 | Perforation | 522.50 | 523.50 | 13 |
2007-10-22 | Perforation | 515.50 | 516.50 | 13 |
2007-10-22 | Perforation | 502.30 | 502.80 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2007 | 1150 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 7247 | 0.0 | 0.0 | 0.0 |
2011 | 7101 | 0.0 | 0.0 | 0.0 |
2012 | 8189 | 0.0 | 0.0 | 0.0 |
2013 | 8639 | 0.0 | 0.0 | 0.0 |
2014 | 8655 | 0.0 | 0.0 | 0.0 |
2015 | 8661 | 0.0 | 0.0 | 0.0 |
2016 | 8700 | 0.0 | 0.0 | 0.0 |
2017 | 8708 | 0.0 | 0.0 | 0.0 |
2018 | 8750 | 0.0 | 0.0 | 0.0 |
2019 | 8718 | 0.0 | 0.0 | 0.0 |
2020 | 2162 | 0.0 | 0.0 | 0.0 |
For data sources see[5]