If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254251606003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.129491,"lon":-113.437854,"icon":""}]} |
Location: 00/06-16-025-25W4/3 | |
Location Alias: 00/06-16-25-25 W4M | |
Location Alias 2: 00/06-16-025-25 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 25 | |
Section: 16 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 6-16-25-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0262087 | |
License Date: 2001-11-20 | |
License Status: Issued | |
Spud Date: 2001-12-02 | |
Final Drill Date: 2001-12-06 | |
Well Total Depth: 1760.00 m | |
Surface Hole Latitude: 51.129491 | |
Surface Hole Longitude: -113.437854 |
Date | Event |
---|---|
2001-11-20 | Obtained License |
2001-12-03 | Surface Casing Operation Performed |
2001-12-06 | Finished Drilling |
2001-12-06 | Well Log Performed |
2001-12-06 | Well Mode changed to Drilled and Cased |
2001-12-07 | Plug Back Performed |
2001-12-07 | Well Log Performed |
2001-12-08 | Production Casing Operation Performed |
2001-12-08 | Rig Released |
2002-01-19 | Well Log Performed |
2002-02-04 | Perforation Treatment Performed - Jet Perforation |
2002-02-28 | Perforation Treatment Performed - Fractured |
2002-06-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-06-14 | Plug Back Performed |
2002-06-15 | Perforation Treatment Performed - Jet Perforation |
2002-11-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-11-03 | Plug Back Performed |
2002-11-04 | Perforation Treatment Performed - Jet Perforation |
2002-12-06 | Perforation Treatment Performed - Fractured |
2002-12-08 | Well Fluid changed to Gas |
2002-12-08 | Well Mode changed to Testing |
2003-01-11 | Perforation Treatment Performed - Jet Perforation |
2003-02-15 | Perforation Treatment Performed - Fractured |
2003-09-09 | Well Began Production |
2003-09-09 | Well Fluid changed to Gas |
2003-09-09 | Well Mode changed to Flowing |
2009-02-02 | Perforation Treatment Performed - Jet Perforation |
2009-02-03 | Perforation Treatment Performed - Jet Perforation |
2009-02-05 | Perforation Treatment Performed - Fractured |
2009-02-19 | Well Fluid changed to Coalbed Methane-Coals and Other |
2009-02-19 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2002-02-04 | Perforation | 862.00 | 866.00 | 7 |
2003-01-11 | Perforation | 635.50 | 637.50 | 7 |
2003-02-15 | Fracture | 635.50 | 644.00 | 0 |
2009-02-02 | Perforation | 525.50 | 526.00 | 14 |
2009-02-02 | Perforation | 523.90 | 524.90 | 14 |
2009-02-02 | Perforation | 568.50 | 569.00 | 14 |
2009-02-02 | Perforation | 565.50 | 566.00 | 14 |
2009-02-03 | Perforation | 397.30 | 397.80 | 14 |
2009-02-03 | Perforation | 390.90 | 391.90 | 14 |
2009-02-03 | Perforation | 403.50 | 404.00 | 14 |
2009-02-03 | Perforation | 400.40 | 400.90 | 14 |
2002-02-28 | Fracture | 862.00 | 866.00 | 0 |
2009-02-03 | Perforation | 387.40 | 387.90 | 14 |
2009-02-03 | Perforation | 410.00 | 414.00 | 14 |
2009-02-03 | Perforation | 369.00 | 371.00 | 14 |
2009-02-03 | Perforation | 382.00 | 383.00 | 14 |
2009-02-03 | Perforation | 475.00 | 477.00 | 14 |
2009-02-03 | Perforation | 499.60 | 500.10 | 14 |
2009-02-03 | Perforation | 496.00 | 496.50 | 14 |
2009-02-03 | Perforation | 517.70 | 518.70 | 14 |
2009-02-03 | Perforation | 510.90 | 511.40 | 14 |
2009-02-03 | Perforation | 494.50 | 495.50 | 14 |
2002-06-14 | Packing Device Capped w/Cement | 850.00 | 858.00 | 0 |
2009-02-03 | Perforation | 429.90 | 431.90 | 14 |
2009-02-03 | Perforation | 426.60 | 427.60 | 14 |
2009-02-03 | Perforation | 442.90 | 443.90 | 14 |
2009-02-03 | Perforation | 445.30 | 447.30 | 14 |
2009-02-05 | Fracture | 369.00 | 477.00 | 0 |
2009-02-05 | Fracture | 382.00 | 569.00 | 0 |
2002-06-15 | Perforation | 833.50 | 834.50 | 7 |
2002-11-03 | Packing Device Capped w/Cement | 822.00 | 830.00 | 0 |
2002-11-04 | Perforation | 696.50 | 697.50 | 7 |
2002-11-04 | Perforation | 701.50 | 703.50 | 7 |
2002-12-06 | Fracture | 696.50 | 703.50 | 0 |
2003-01-11 | Perforation | 641.00 | 644.00 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2003 | 2805 | 0.0 | 0.0 | 0.0 |
2004 | 8678 | 0.0 | 0.0 | 0.0 |
2005 | 7984 | 0.0 | 0.0 | 0.0 |
2006 | 8748 | 0.0 | 0.0 | 0.0 |
2007 | 8732 | 0.0 | 0.0 | 0.0 |
2008 | 8087 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 8702 | 0.0 | 0.0 | 0.0 |
2012 | 8739 | 0.0 | 0.0 | 0.0 |
2013 | 8634 | 0.0 | 0.0 | 0.0 |
2014 | 8645 | 0.0 | 0.0 | 0.0 |
2015 | 8721 | 0.0 | 0.0 | 0.0 |
2016 | 8726 | 0.0 | 0.0 | 0.0 |
2017 | 8709 | 0.0 | 0.0 | 0.0 |
2018 | 8717 | 0.0 | 0.0 | 0.0 |
2019 | 8563 | 0.0 | 0.0 | 0.0 |
2020 | 2165 | 0.0 | 0.0 | 0.0 |
For data sources see[5]