If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254251303002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.12683,"lon":-113.367475,"icon":""}]} |
Location: 00/03-13-025-25W4/2 | |
Location Alias: 00/03-13-25-25 W4M | |
Location Alias 2: 00/03-13-025-25 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 25 | |
Section: 13 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 3-13-25-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0349896 | |
License Date: 2006-01-23 | |
License Status: Issued | |
Spud Date: 2006-02-20 | |
Final Drill Date: 2006-02-23 | |
Well Total Depth: 918.00 m | |
Surface Hole Latitude: 51.126830 | |
Surface Hole Longitude: -113.367475 |
Date | Event |
---|---|
2006-01-23 | Obtained License |
2006-02-20 | Surface Casing Operation Performed |
2006-02-23 | Finished Drilling |
2006-02-23 | Production Casing Operation Performed |
2006-02-23 | Well Mode changed to Drilled and Cased |
2006-02-24 | Rig Released |
2006-02-28 | Well Log Performed |
2006-03-14 | Perforation Treatment Performed - Jet Perforation |
2006-05-11 | Perforation Treatment Performed - Jet Perforation |
2006-06-13 | Well Fluid changed to Gas |
2006-06-13 | Well Mode changed to Testing |
2006-08-18 | Perforation Treatment Performed - Jet Perforation |
2006-08-21 | Perforation Treatment Performed - Fractured |
2006-10-23 | Well Structure changed to Commingled |
2011-02-21 | Perforation Treatment Performed - Jet Perforation |
2011-03-22 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-03-14 | Perforation | 841.00 | 845.00 | 13 |
2006-08-18 | Perforation | 477.00 | 477.50 | 13 |
2006-08-18 | Perforation | 470.00 | 471.00 | 13 |
2006-08-18 | Perforation | 461.80 | 462.30 | 13 |
2006-08-18 | Perforation | 419.70 | 420.20 | 13 |
2006-08-18 | Perforation | 418.10 | 418.60 | 13 |
2006-08-18 | Perforation | 416.80 | 417.30 | 13 |
2006-08-18 | Perforation | 404.40 | 404.90 | 13 |
2006-08-18 | Perforation | 400.40 | 400.90 | 13 |
2006-08-18 | Perforation | 396.30 | 397.30 | 13 |
2006-08-18 | Perforation | 385.10 | 385.60 | 13 |
2006-05-11 | Perforation | 740.00 | 742.00 | 13 |
2006-08-18 | Perforation | 377.00 | 377.50 | 13 |
2006-08-18 | Perforation | 371.70 | 372.20 | 13 |
2006-08-18 | Perforation | 370.60 | 371.10 | 13 |
2006-08-18 | Perforation | 367.70 | 368.20 | 13 |
2006-08-18 | Perforation | 365.10 | 365.60 | 13 |
2006-08-18 | Perforation | 357.60 | 358.10 | 13 |
2006-08-18 | Perforation | 306.00 | 306.50 | 13 |
2006-08-18 | Perforation | 267.90 | 268.40 | 13 |
2006-08-18 | Perforation | 266.00 | 266.50 | 13 |
2006-08-18 | Perforation | 248.40 | 248.90 | 13 |
2006-08-18 | Perforation | 541.80 | 542.30 | 13 |
2006-08-18 | Perforation | 245.80 | 246.30 | 13 |
2006-08-18 | Perforation | 241.60 | 242.10 | 13 |
2006-08-21 | Fracture | 241.60 | 542.30 | 0 |
2011-02-21 | Perforation | 806.00 | 807.00 | 13 |
2011-02-21 | Perforation | 791.00 | 794.00 | 13 |
2011-02-21 | Perforation | 601.00 | 603.00 | 13 |
2011-03-22 | Fracture | 806.00 | 807.00 | 0 |
2011-03-22 | Fracture | 791.00 | 794.00 | 0 |
2011-03-22 | Fracture | 601.00 | 603.00 | 0 |
2006-08-18 | Perforation | 538.60 | 539.10 | 13 |
2006-08-18 | Perforation | 537.00 | 537.50 | 13 |
2006-08-18 | Perforation | 501.70 | 502.20 | 13 |
2006-08-18 | Perforation | 499.20 | 499.70 | 13 |
2006-08-18 | Perforation | 493.10 | 494.10 | 13 |
2006-08-18 | Perforation | 486.90 | 487.40 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 48 | 0.0 | 0.0 | 0.0 |
For data sources see[5]