X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0254251004000"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0254251004000
 
| Well ID: 0254251004000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 51.111946, -113.418679 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 51.111946, -113.418679 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/04-10-025-25W4/0
 
| Location: 00/04-10-025-25W4/0
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/04-10-025-25 W4/00
 
| Location Alias 2: 00/04-10-025-25 W4/00
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 025
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 25
 +
|-
 +
| Section: 10
 
|-
 
|-
 
| County/Municipality: [[Wheatland County,_Alberta|Wheatland County]]
 
| County/Municipality: [[Wheatland County,_Alberta|Wheatland County]]
Line 29: Line 39:
 
| Final Drill Date: 2009-01-09
 
| Final Drill Date: 2009-01-09
 
|-
 
|-
| Well Total Depth: 692 m
+
| Well Total Depth: 692.00 m
 
|-
 
|-
 
| Surface Hole Latitude: 51.111946
 
| Surface Hole Latitude: 51.111946
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2008-12-30
 +
| Obtained License
 +
|-
 +
| 2009-01-07
 +
| Surface Casing Operation Performed
 +
|-
 +
| 2009-01-09
 +
| Finished Drilling
 +
|-
 +
| 2009-01-09
 +
| Production Casing Operation Performed
 +
|-
 +
| 2009-01-09
 +
| Rig Released
 +
|-
 +
| 2009-01-09
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 2009-01-14
 +
| Well Log Performed
 +
|-
 +
| 2009-01-25
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2009-02-01
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2009-02-18
 +
| Well Began Production
 +
|-
 +
| 2009-02-18
 +
| Well Fluid changed to Coalbed Methane-Coals and Other
 +
|-
 +
| 2009-02-18
 +
| Well Mode changed to Flowing
 +
|-
 +
| 2009-06-26
 +
| Well Log Performed
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 135:
 
| 2009-01-25
 
| 2009-01-25
 
| Perforation
 
| Perforation
| style="text-align: right;" | 389.9
+
| style="text-align: right;" | 389.90
| style="text-align: right;" | 390.4
+
| style="text-align: right;" | 390.40
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 
|-
 
|-
 
| 2009-01-25
 
| 2009-01-25
 
| Perforation
 
| Perforation
| style="text-align: right;" | 385.3
+
| style="text-align: right;" | 385.30
| style="text-align: right;" | 385.8
+
| style="text-align: right;" | 385.80
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 
|-
 
|-
 
| 2009-01-25
 
| 2009-01-25
 
| Perforation
 
| Perforation
| style="text-align: right;" | 403.3
+
| style="text-align: right;" | 403.30
| style="text-align: right;" | 403.8
+
| style="text-align: right;" | 403.80
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 
|-
 
|-
 
| 2009-01-25
 
| 2009-01-25
 
| Perforation
 
| Perforation
| style="text-align: right;" | 423.7
+
| style="text-align: right;" | 423.70
| style="text-align: right;" | 424.2
+
| style="text-align: right;" | 424.20
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 
|-
 
|-
 
| 2009-01-25
 
| 2009-01-25
 
| Perforation
 
| Perforation
| style="text-align: right;" | 409.3
+
| style="text-align: right;" | 409.30
| style="text-align: right;" | 409.8
+
| style="text-align: right;" | 409.80
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 
|-
 
|-
 
| 2009-01-25
 
| 2009-01-25
 
| Perforation
 
| Perforation
| style="text-align: right;" | 376.3
+
| style="text-align: right;" | 376.30
| style="text-align: right;" | 376.8
+
| style="text-align: right;" | 376.80
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 
|-
 
|-
 
| 2009-01-25
 
| 2009-01-25
 
| Perforation
 
| Perforation
| style="text-align: right;" | 310
+
| style="text-align: right;" | 310.00
| style="text-align: right;" | 312
+
| style="text-align: right;" | 312.00
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 
|-
 
|-
 
| 2009-01-25
 
| 2009-01-25
 
| Perforation
 
| Perforation
| style="text-align: right;" | 265
+
| style="text-align: right;" | 265.00
| style="text-align: right;" | 267
+
| style="text-align: right;" | 267.00
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 
|-
 
|-
 
| 2009-01-25
 
| 2009-01-25
 
| Perforation
 
| Perforation
| style="text-align: right;" | 480
+
| style="text-align: right;" | 480.00
| style="text-align: right;" | 483
+
| style="text-align: right;" | 483.00
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 
|-
 
|-
 
| 2009-01-25
 
| 2009-01-25
 
| Perforation
 
| Perforation
| style="text-align: right;" | 362.1
+
| style="text-align: right;" | 362.10
| style="text-align: right;" | 362.6
+
| style="text-align: right;" | 362.60
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 
|-
 
|-
 
| 2009-01-25
 
| 2009-01-25
 
| Perforation
 
| Perforation
| style="text-align: right;" | 270.4
+
| style="text-align: right;" | 270.40
| style="text-align: right;" | 270.9
+
| style="text-align: right;" | 270.90
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 
|-
 
|-
 
| 2009-01-25
 
| 2009-01-25
 
| Perforation
 
| Perforation
| style="text-align: right;" | 430.3
+
| style="text-align: right;" | 430.30
| style="text-align: right;" | 430.8
+
| style="text-align: right;" | 430.80
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 
|-
 
|-
 
| 2009-01-25
 
| 2009-01-25
 
| Perforation
 
| Perforation
| style="text-align: right;" | 528.2
+
| style="text-align: right;" | 528.20
| style="text-align: right;" | 529.2
+
| style="text-align: right;" | 529.20
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 
|-
 
|-
 
| 2009-01-25
 
| 2009-01-25
 
| Perforation
 
| Perforation
| style="text-align: right;" | 523.4
+
| style="text-align: right;" | 523.40
| style="text-align: right;" | 524.4
+
| style="text-align: right;" | 524.40
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 
|-
 
|-
 
| 2009-01-25
 
| 2009-01-25
 
| Perforation
 
| Perforation
| style="text-align: right;" | 529.9
+
| style="text-align: right;" | 529.90
| style="text-align: right;" | 530.4
+
| style="text-align: right;" | 530.40
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 
|-
 
|-
 
| 2009-01-25
 
| 2009-01-25
 
| Perforation
 
| Perforation
| style="text-align: right;" | 568.8
+
| style="text-align: right;" | 568.80
| style="text-align: right;" | 569.3
+
| style="text-align: right;" | 569.30
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 
|-
 
|-
 
| 2009-01-25
 
| 2009-01-25
 
| Perforation
 
| Perforation
| style="text-align: right;" | 566.3
+
| style="text-align: right;" | 566.30
| style="text-align: right;" | 566.8
+
| style="text-align: right;" | 566.80
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 
|-
 
|-
 
| 2009-01-25
 
| 2009-01-25
 
| Perforation
 
| Perforation
| style="text-align: right;" | 516.8
+
| style="text-align: right;" | 516.80
| style="text-align: right;" | 517.3
+
| style="text-align: right;" | 517.30
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 
|-
 
|-
 
| 2009-01-25
 
| 2009-01-25
 
| Perforation
 
| Perforation
| style="text-align: right;" | 473.2
+
| style="text-align: right;" | 473.20
| style="text-align: right;" | 473.7
+
| style="text-align: right;" | 473.70
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 
|-
 
|-
 
| 2009-01-25
 
| 2009-01-25
 
| Perforation
 
| Perforation
| style="text-align: right;" | 446
+
| style="text-align: right;" | 446.00
| style="text-align: right;" | 449
+
| style="text-align: right;" | 449.00
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 
|-
 
|-
 
| 2009-01-25
 
| 2009-01-25
 
| Perforation
 
| Perforation
| style="text-align: right;" | 432.8
+
| style="text-align: right;" | 432.80
| style="text-align: right;" | 434.8
+
| style="text-align: right;" | 434.80
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 
|-
 
|-
 
| 2009-01-25
 
| 2009-01-25
 
| Perforation
 
| Perforation
| style="text-align: right;" | 506
+
| style="text-align: right;" | 506.00
| style="text-align: right;" | 506.5
+
| style="text-align: right;" | 506.50
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 
|-
 
|-
 
| 2009-01-25
 
| 2009-01-25
 
| Perforation
 
| Perforation
| style="text-align: right;" | 500.5
+
| style="text-align: right;" | 500.50
| style="text-align: right;" | 501.5
+
| style="text-align: right;" | 501.50
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 
|-
 
|-
 
| 2009-02-01
 
| 2009-02-01
| Fracture  
+
| Fracture
| style="text-align: right;" | 265
+
| style="text-align: right;" | 265.00
| style="text-align: right;" | 483
+
| style="text-align: right;" | 483.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009-02-01
 
| 2009-02-01
| Fracture  
+
| Fracture
| style="text-align: right;" | 270.4
+
| style="text-align: right;" | 270.40
| style="text-align: right;" | 569.3
+
| style="text-align: right;" | 569.30
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 226: Line 287:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Trade Name
!scope="col" | Chemical Name
+
!scope="col" | Supplier
!scope="col" style="text-align: right;" | CAS Number
 
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 259: Line 334:
 
| 2009
 
| 2009
 
| style="text-align: right;" | 7607
 
| style="text-align: right;" | 7607
| style="text-align: right;" | 376.7
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 2.8
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2010
 
| 2010
 
| style="text-align: right;" | 8663
 
| style="text-align: right;" | 8663
| style="text-align: right;" | 280.1
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 3.7
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2011
 
| 2011
 
| style="text-align: right;" | 8756
 
| style="text-align: right;" | 8756
| style="text-align: right;" | 249.0
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 2.4
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2012
 
| 2012
 
| style="text-align: right;" | 8189
 
| style="text-align: right;" | 8189
| style="text-align: right;" | 257.5
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 0.7
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2013
 
| 2013
 
| style="text-align: right;" | 8639
 
| style="text-align: right;" | 8639
| style="text-align: right;" | 224.2
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 0.7
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2014
 
| 2014
 
| style="text-align: right;" | 8655
 
| style="text-align: right;" | 8655
| style="text-align: right;" | 193.5
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 295: Line 370:
 
| 2015
 
| 2015
 
| style="text-align: right;" | 8661
 
| style="text-align: right;" | 8661
| style="text-align: right;" | 174.4
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 301: Line 376:
 
| 2016
 
| 2016
 
| style="text-align: right;" | 8700
 
| style="text-align: right;" | 8700
| style="text-align: right;" | 183.9
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 1.1
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2017
 
| 2017
 
| style="text-align: right;" | 8708
 
| style="text-align: right;" | 8708
| style="text-align: right;" | 199.5
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 0.4
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2018
 
| 2018
 
| style="text-align: right;" | 8750
 
| style="text-align: right;" | 8750
| style="text-align: right;" | 174.7
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 0.3
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2019
 
| 2019
| style="text-align: right;" | 2153
+
| style="text-align: right;" | 8682
| style="text-align: right;" | 34.9
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2020
 +
| style="text-align: right;" | 2162
 +
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 327: Line 408:
 
  | title = Well Production Data - All Alberta
 
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-04-24
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Occurences ==
 
<!--== Occurences ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"

Revision as of 14:20, 8 July 2020

Well Details

Well ID: 0254251004000
Loading map...
Location: 00/04-10-025-25W4/0
Location Alias: 00/04-10-25-25 W4M
Location Alias 2: 00/04-10-025-25 W4/00
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 25
Section: 10
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 4-10-25-25
Operator Name: Ember Resources Inc.
License Number: 0407199
License Date: 2008-12-30
License Status: Issued
Spud Date: 2009-01-07
Final Drill Date: 2009-01-09
Well Total Depth: 692.00 m
Surface Hole Latitude: 51.111946
Surface Hole Longitude: -113.418679

For data sources see[1][2]

Well History

Date Event
2008-12-30 Obtained License
2009-01-07 Surface Casing Operation Performed
2009-01-09 Finished Drilling
2009-01-09 Production Casing Operation Performed
2009-01-09 Rig Released
2009-01-09 Well Mode changed to Drilled and Cased
2009-01-14 Well Log Performed
2009-01-25 Perforation Treatment Performed - Jet Perforation
2009-02-01 Perforation Treatment Performed - Fractured
2009-02-18 Well Began Production
2009-02-18 Well Fluid changed to Coalbed Methane-Coals and Other
2009-02-18 Well Mode changed to Flowing
2009-06-26 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-01-25 Perforation 389.90 390.40 14
2009-01-25 Perforation 385.30 385.80 14
2009-01-25 Perforation 403.30 403.80 14
2009-01-25 Perforation 423.70 424.20 14
2009-01-25 Perforation 409.30 409.80 14
2009-01-25 Perforation 376.30 376.80 14
2009-01-25 Perforation 310.00 312.00 14
2009-01-25 Perforation 265.00 267.00 14
2009-01-25 Perforation 480.00 483.00 14
2009-01-25 Perforation 362.10 362.60 14
2009-01-25 Perforation 270.40 270.90 14
2009-01-25 Perforation 430.30 430.80 14
2009-01-25 Perforation 528.20 529.20 14
2009-01-25 Perforation 523.40 524.40 14
2009-01-25 Perforation 529.90 530.40 14
2009-01-25 Perforation 568.80 569.30 14
2009-01-25 Perforation 566.30 566.80 14
2009-01-25 Perforation 516.80 517.30 14
2009-01-25 Perforation 473.20 473.70 14
2009-01-25 Perforation 446.00 449.00 14
2009-01-25 Perforation 432.80 434.80 14
2009-01-25 Perforation 506.00 506.50 14
2009-01-25 Perforation 500.50 501.50 14
2009-02-01 Fracture 265.00 483.00 0
2009-02-01 Fracture 270.40 569.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 7607 0.0 0.0 0.0
2010 8663 0.0 0.0 0.0
2011 8756 0.0 0.0 0.0
2012 8189 0.0 0.0 0.0
2013 8639 0.0 0.0 0.0
2014 8655 0.0 0.0 0.0
2015 8661 0.0 0.0 0.0
2016 8700 0.0 0.0 0.0
2017 8708 0.0 0.0 0.0
2018 8750 0.0 0.0 0.0
2019 8682 0.0 0.0 0.0
2020 2162 0.0 0.0 0.0

For data sources see[5]

References