If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254250707000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.11461,"lon":-113.47918,"icon":""}]} |
Location: 00/07-07-025-25W4/0 | |
Location Alias: 00/07-07-25-25 W4M | |
Location Alias 2: 00/07-07-025-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 25 | |
Section: 07 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 7-7-25-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0380962 | |
License Date: 2007-08-24 | |
License Status: Issued | |
Spud Date: 2007-11-22 | |
Final Drill Date: 2007-11-25 | |
Well Total Depth: 935.00 m | |
Surface Hole Latitude: 51.114610 | |
Surface Hole Longitude: -113.479180 |
Date | Event |
---|---|
2007-08-24 | Obtained License |
2007-11-22 | Surface Casing Operation Performed |
2007-11-25 | Finished Drilling |
2007-11-25 | Production Casing Operation Performed |
2007-11-25 | Rig Released |
2007-11-25 | Well Mode changed to Drilled and Cased |
2007-12-01 | Well Log Performed |
2007-12-20 | Perforation Treatment Performed - Jet Perforation |
2008-01-10 | Well Fluid changed to Gas |
2008-01-10 | Well Mode changed to Testing |
2008-01-17 | Well Began Production |
2008-01-17 | Well Fluid changed to Gas |
2008-01-17 | Well Mode changed to Flowing |
2010-01-26 | Perforation Treatment Performed - Jet Perforation |
2010-02-09 | Perforation Treatment Performed - Fractured |
2010-03-10 | Well Fluid changed to Gas |
2010-03-10 | Well Mode changed to Flowing |
2010-06-26 | Perforation Treatment Performed - Jet Perforation |
2010-07-07 | Perforation Treatment Performed - Fractured |
2010-07-20 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-07-20 | Well Mode changed to Flowing |
2010-08-22 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2007-12-20 | Perforation | 775.50 | 777.50 | 13 |
2010-06-26 | Perforation | 293.00 | 294.00 | 13 |
2010-06-26 | Perforation | 270.70 | 271.20 | 13 |
2010-06-26 | Perforation | 420.50 | 421.00 | 13 |
2010-06-26 | Perforation | 418.50 | 419.00 | 13 |
2010-06-26 | Perforation | 407.80 | 408.30 | 13 |
2010-06-26 | Perforation | 353.00 | 355.00 | 13 |
2010-06-26 | Perforation | 301.00 | 303.00 | 13 |
2010-06-26 | Perforation | 242.00 | 243.00 | 13 |
2010-06-26 | Perforation | 215.60 | 216.10 | 13 |
2010-06-26 | Perforation | 376.00 | 378.00 | 13 |
2007-12-20 | Perforation | 759.00 | 761.00 | 13 |
2010-06-26 | Perforation | 357.00 | 359.00 | 13 |
2010-06-26 | Perforation | 543.90 | 544.40 | 13 |
2010-06-26 | Perforation | 542.10 | 543.10 | 13 |
2010-06-26 | Perforation | 538.00 | 539.00 | 13 |
2010-06-26 | Perforation | 582.10 | 582.60 | 13 |
2010-06-26 | Perforation | 580.10 | 580.60 | 13 |
2010-06-26 | Perforation | 576.20 | 576.70 | 13 |
2010-06-26 | Perforation | 461.80 | 462.30 | 13 |
2010-06-26 | Perforation | 447.10 | 448.10 | 13 |
2010-06-26 | Perforation | 422.20 | 423.20 | 13 |
2007-12-20 | Perforation | 744.00 | 746.00 | 13 |
2010-06-26 | Perforation | 463.80 | 465.80 | 13 |
2010-06-26 | Perforation | 516.40 | 516.90 | 13 |
2010-06-26 | Perforation | 513.50 | 514.50 | 13 |
2010-07-07 | Fracture | 242.00 | 378.00 | 0 |
2010-07-07 | Fracture | 215.60 | 582.60 | 0 |
2010-01-26 | Perforation | 660.00 | 662.00 | 13 |
2010-01-26 | Perforation | 629.00 | 631.00 | 13 |
2010-01-26 | Perforation | 623.00 | 625.00 | 13 |
2010-02-09 | Fracture | 660.00 | 662.00 | 0 |
2010-02-09 | Fracture | 623.00 | 631.00 | 0 |
2010-06-26 | Perforation | 396.60 | 397.60 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2008 | 8441 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8544 | 0.0 | 0.0 | 0.0 |
2011 | 8721 | 0.0 | 0.0 | 0.0 |
2012 | 8723 | 0.0 | 0.0 | 0.0 |
2013 | 8634 | 0.0 | 0.0 | 0.0 |
2014 | 8645 | 0.0 | 0.0 | 0.0 |
2015 | 8721 | 0.0 | 0.0 | 0.0 |
2016 | 8726 | 0.0 | 0.0 | 0.0 |
2017 | 8709 | 0.0 | 0.0 | 0.0 |
2018 | 8717 | 0.0 | 0.0 | 0.0 |
2019 | 8563 | 0.0 | 0.0 | 0.0 |
2020 | 2165 | 0.0 | 0.0 | 0.0 |
For data sources see[5]