If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254250608000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.100383,"lon":-113.471649,"icon":""}]} |
Location: 00/08-06-025-25W4/0 | |
Location Alias: 00/08-06-25-25 W4M | |
Location Alias 2: 00/08-06-025-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 25 | |
Section: 06 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 8-6-25-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0318259 | |
License Date: 2004-11-03 | |
License Status: Issued | |
Spud Date: 2005-01-18 | |
Final Drill Date: 2005-01-21 | |
Well Total Depth: 717.00 m | |
Surface Hole Latitude: 51.100383 | |
Surface Hole Longitude: -113.471649 |
Date | Event |
---|---|
2004-11-03 | Obtained License |
2005-01-19 | Surface Casing Operation Performed |
2005-01-21 | Finished Drilling |
2005-01-21 | Well Mode changed to Drilled and Cased |
2005-01-22 | Production Casing Operation Performed |
2005-01-22 | Rig Released |
2005-01-25 | Well Log Performed |
2005-02-08 | Perforation Treatment Performed - Jet Perforation |
2005-05-11 | Well Fluid changed to Gas |
2005-05-11 | Well Mode changed to Testing |
2005-06-26 | Perforation Treatment Performed - Fractured |
2005-07-09 | Perforation Treatment Performed - Jet Perforation |
2005-08-20 | Perforation Treatment Performed - Jet Perforation |
2005-09-02 | Perforation Treatment Performed - Fractured |
2005-11-05 | Well Began Production |
2005-11-05 | Well Fluid changed to Coalbed Methane-Coals and Other |
2005-11-05 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-02-08 | Perforation | 654.00 | 656.00 | 13 |
2005-08-20 | Perforation | 531.30 | 531.80 | 13 |
2005-08-20 | Perforation | 526.70 | 527.20 | 13 |
2005-08-20 | Perforation | 513.30 | 513.80 | 13 |
2005-08-20 | Perforation | 511.20 | 511.70 | 13 |
2005-08-20 | Perforation | 509.30 | 509.80 | 13 |
2005-08-20 | Perforation | 498.80 | 499.30 | 13 |
2005-08-20 | Perforation | 454.50 | 455.00 | 13 |
2005-08-20 | Perforation | 451.90 | 452.40 | 13 |
2005-08-20 | Perforation | 441.00 | 441.50 | 13 |
2005-08-20 | Perforation | 437.40 | 437.90 | 13 |
2005-06-26 | Fracture | 654.00 | 656.00 | 0 |
2005-08-20 | Perforation | 417.20 | 417.70 | 13 |
2005-08-20 | Perforation | 415.70 | 416.20 | 13 |
2005-08-20 | Perforation | 414.40 | 414.90 | 13 |
2005-08-20 | Perforation | 405.70 | 406.20 | 13 |
2005-08-20 | Perforation | 395.30 | 395.80 | 13 |
2005-08-20 | Perforation | 374.80 | 375.30 | 13 |
2005-08-20 | Perforation | 339.90 | 340.40 | 13 |
2005-08-20 | Perforation | 335.30 | 335.80 | 13 |
2005-08-20 | Perforation | 298.20 | 298.70 | 13 |
2005-08-20 | Perforation | 291.70 | 292.20 | 13 |
2005-07-09 | Perforation | 488.00 | 490.00 | 13 |
2005-08-20 | Perforation | 283.10 | 283.60 | 13 |
2005-08-20 | Perforation | 278.70 | 279.20 | 13 |
2005-08-20 | Perforation | 273.10 | 273.60 | 13 |
2005-08-20 | Perforation | 270.20 | 270.70 | 13 |
2005-08-20 | Perforation | 264.00 | 264.50 | 13 |
2005-08-20 | Perforation | 216.00 | 216.50 | 13 |
2005-09-02 | Fracture | 216.00 | 578.30 | 0 |
2005-08-20 | Perforation | 577.80 | 578.30 | 13 |
2005-08-20 | Perforation | 576.80 | 577.30 | 13 |
2005-08-20 | Perforation | 573.90 | 574.40 | 13 |
2005-08-20 | Perforation | 540.70 | 541.20 | 13 |
2005-08-20 | Perforation | 536.60 | 537.10 | 13 |
2005-08-20 | Perforation | 533.30 | 533.80 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 1501 | 0.0 | 0.0 | 0.0 |
2006 | 8624 | 0.0 | 0.0 | 0.0 |
2007 | 8262 | 0.0 | 0.0 | 0.0 |
2008 | 7853 | 0.0 | 0.0 | 0.0 |
2009 | 6605 | 0.0 | 0.0 | 0.0 |
2010 | 8653 | 0.0 | 0.0 | 0.0 |
2011 | 8276 | 0.0 | 0.0 | 0.0 |
2012 | 7989 | 0.0 | 0.0 | 0.0 |
2013 | 8713 | 0.0 | 0.0 | 0.0 |
2014 | 8030 | 0.0 | 0.0 | 0.0 |
2015 | 8017 | 0.0 | 0.0 | 0.0 |
2016 | 8085 | 0.0 | 0.0 | 0.0 |
2017 | 8461 | 0.0 | 0.0 | 0.0 |
2018 | 8517 | 0.0 | 0.0 | 0.0 |
2019 | 6015 | 0.0 | 0.0 | 0.0 |
2020 | 1054 | 0.0 | 0.0 | 0.0 |
For data sources see[5]