X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254250514000

Well Details

Well ID: 0254250514000
Loading map...
Location: 00/14-05-025-25W4/0
Location Alias: 00/14-05-25-25 W4M
Location Alias 2: 00/14-05-025-25 W4/00
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 25
Section: 05
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 14-5-25-25
Operator Name: Ember Resources Inc.
License Number: 0248518
License Date: 2001-01-08
License Status: Issued
Spud Date: 2001-01-15
Final Drill Date: 2001-01-20
Well Total Depth: 1780.00 m
Surface Hole Latitude: 51.110154
Surface Hole Longitude: -113.460600

For data sources see[1][2]

Well History

Date Event
2001-01-08 Obtained License
2001-01-16 Surface Casing Operation Performed
2001-01-20 Finished Drilling
2001-01-20 Well Log Performed
2001-01-21 Production Casing Operation Performed
2001-01-22 Rig Released
2001-01-22 Well Mode changed to Drilled and Cased
2001-01-26 Well Log Performed
2001-02-24 Well Log Performed
2001-02-26 Perforation Treatment Performed - Jet Perforation
2001-02-26 Well Log Performed
2001-05-21 Perforation Treatment Performed - Fractured
2001-09-27 Well Began Production
2001-09-27 Well Fluid changed to Gas
2001-09-27 Well Mode changed to Flowing
2002-02-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-02-02 Plug Back Performed
2002-02-02 Well Fluid changed to Gas
2002-02-02 Well Mode changed to Abandoned Zone
2002-02-03 Well Log Performed
2002-03-13 Well Log Performed
2002-06-18 Perforation Treatment Performed - Jet Perforation
2002-09-17 Perforation Treatment Performed - Fractured
2002-11-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-11-02 Plug Back Performed
2002-11-04 Perforation Treatment Performed - Jet Perforation
2002-12-08 Perforation Treatment Performed - Jet Perforation
2003-01-07 Perforation Treatment Performed - Fractured
2003-01-20 Perforation Treatment Performed - Jet Perforation
2005-04-24 Perforation Treatment Performed - Fractured
2005-07-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-07-12 Plug Back Performed
2005-09-03 Perforation Treatment Performed - Jet Perforation
2005-10-26 Perforation Treatment Performed - Jet Perforation
2005-11-12 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-02-26 Perforation 1536.50 1541.00 20
2003-01-20 Perforation 649.50 652.50 13
2005-04-24 Fracture 649.50 652.00 0
2005-07-12 Packing Device Capped w/Cement 787.50 795.50 0
2005-07-12 Packing Device Capped w/Cement 771.50 779.50 0
2005-07-12 Packing Device Capped w/Cement 636.50 644.50 0
2005-09-03 Perforation 452.00 455.00 13
2005-10-26 Perforation 585.70 586.20 13
2005-10-26 Perforation 573.00 573.50 13
2005-10-26 Perforation 571.90 572.40 13
2005-10-26 Perforation 569.40 569.90 13
2001-05-21 Fracture 1536.50 1541.00 0
2005-10-26 Perforation 535.10 535.60 13
2005-10-26 Perforation 531.10 531.60 13
2005-10-26 Perforation 528.60 529.10 13
2005-10-26 Perforation 523.30 523.80 13
2005-10-26 Perforation 509.10 509.60 13
2005-10-26 Perforation 507.30 507.80 13
2005-10-26 Perforation 505.60 506.10 13
2005-10-26 Perforation 495.00 495.50 13
2005-10-26 Perforation 479.40 479.90 13
2005-10-26 Perforation 443.70 444.20 13
2002-02-02 Packing Device Capped w/Cement 1520.00 1530.00 0
2005-10-26 Perforation 441.50 442.00 13
2005-10-26 Perforation 434.40 434.90 13
2005-10-26 Perforation 433.10 433.60 13
2005-10-26 Perforation 425.80 426.30 13
2005-10-26 Perforation 421.10 421.60 13
2005-10-26 Perforation 414.80 415.30 13
2005-10-26 Perforation 410.90 411.40 13
2005-10-26 Perforation 409.20 409.70 13
2005-10-26 Perforation 406.80 407.30 13
2005-10-26 Perforation 405.70 406.20 13
2002-06-18 Perforation 872.00 874.00 7
2005-10-26 Perforation 398.70 399.20 13
2005-10-26 Perforation 389.00 389.50 13
2005-10-26 Perforation 386.70 387.20 13
2005-10-26 Perforation 381.20 381.70 13
2005-10-26 Perforation 367.00 367.50 13
2005-10-26 Perforation 340.70 341.20 13
2005-10-26 Perforation 333.10 333.60 13
2005-10-26 Perforation 312.10 312.60 13
2005-11-12 Fracture 312.10 586.20 0
2002-09-17 Fracture 872.00 874.00 0
2002-11-02 Packing Device Capped w/Cement 859.00 867.00 0
2002-11-04 Perforation 800.50 801.50 7
2002-12-08 Perforation 785.50 787.50 13
2003-01-07 Fracture 785.50 787.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 3 0.0 0.0 0.0
2002 16 0.0 0.0 0.0

For data sources see[5]

References