X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254243202000

Well Details

Well ID: 0254243202000
Loading map...
Location: 00/02-32-025-24W4/0
Location Alias: 00/02-32-25-24 W4M
Location Alias 2: 00/02-32-025-24 W4/00
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 24
Section: 32
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 2-32-25-24
Operator Name: Ember Resources Inc.
License Number: 0345409
License Date: 2005-12-13
License Status: Issued
Spud Date: 2006-01-02
Final Drill Date: 2006-01-09
Well Total Depth: 876.00 m
Surface Hole Latitude: 51.169338
Surface Hole Longitude: -113.313456

For data sources see[1][2]

Well History

Date Event
2005-12-13 Obtained License
2006-01-02 Surface Casing Operation Performed
2006-01-09 Finished Drilling
2006-01-09 Production Casing Operation Performed
2006-01-09 Rig Released
2006-01-09 Well Mode changed to Drilled and Cased
2006-01-13 Well Log Performed
2006-01-28 Perforation Treatment Performed - Jet Perforation
2006-02-07 Perforation Treatment Performed - Jet Perforation
2006-03-15 Perforation Treatment Performed - Jet Perforation
2006-03-21 Perforation Treatment Performed - Fractured
2006-05-04 Well Began Production
2006-05-04 Well Fluid changed to Coalbed Methane-Coals and Other
2006-05-04 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-01-28 Perforation 795.00 799.00 13
2006-03-15 Perforation 375.50 376.00 13
2006-03-15 Perforation 372.60 373.10 13
2006-03-15 Perforation 371.60 372.10 13
2006-03-15 Perforation 369.60 370.10 13
2006-03-15 Perforation 358.80 359.30 13
2006-03-15 Perforation 357.70 358.20 13
2006-03-15 Perforation 349.00 350.30 13
2006-03-15 Perforation 339.40 339.90 13
2006-03-15 Perforation 337.40 338.40 13
2006-03-15 Perforation 333.70 334.20 13
2006-02-07 Perforation 670.00 671.00 13
2006-03-15 Perforation 332.40 332.90 13
2006-03-15 Perforation 326.80 327.30 13
2006-03-15 Perforation 323.80 324.30 13
2006-03-15 Perforation 319.50 320.00 13
2006-03-15 Perforation 265.80 266.30 13
2006-03-15 Perforation 258.10 258.60 13
2006-03-15 Perforation 225.10 225.60 13
2006-03-15 Perforation 207.70 208.20 13
2006-03-21 Fracture 207.70 496.50 0
2006-03-15 Perforation 496.00 496.50 13
2006-03-15 Perforation 461.40 461.90 13
2006-03-15 Perforation 460.10 460.60 13
2006-03-15 Perforation 456.00 457.00 13
2006-03-15 Perforation 444.80 445.30 13
2006-03-15 Perforation 437.80 438.30 13
2006-03-15 Perforation 431.80 432.80 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 5555 0.0 0.0 0.0
2007 7866 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8718 0.0 0.0 0.0
2012 8740 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8736 0.0 0.0 0.0
2015 8730 0.0 0.0 0.0
2016 8710 0.0 0.0 0.0
2017 8541 0.0 0.0 0.0
2018 8707 0.0 0.0 0.0
2019 8745 0.0 0.0 0.0
2020 2169 0.0 0.0 0.0

For data sources see[5]

References