If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254242906000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.158813,"lon":-113.32354,"icon":""}]} |
Location: 00/06-29-025-24W4/0 | |
Location Alias: 00/06-29-25-24 W4M | |
Location Alias 2: 00/06-29-025-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 24 | |
Section: 29 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 6-29-25-24 | |
Operator Name: Ember Resources Inc. | |
License Number: 0345142 | |
License Date: 2005-12-12 | |
License Status: Issued | |
Spud Date: 2006-01-02 | |
Final Drill Date: 2006-01-07 | |
Well Total Depth: 888.00 m | |
Surface Hole Latitude: 51.158813 | |
Surface Hole Longitude: -113.323540 |
Date | Event |
---|---|
2005-12-12 | Obtained License |
2006-01-02 | Surface Casing Operation Performed |
2006-01-07 | Finished Drilling |
2006-01-07 | Production Casing Operation Performed |
2006-01-07 | Well Mode changed to Drilled and Cased |
2006-01-08 | Rig Released |
2006-01-13 | Well Log Performed |
2006-01-28 | Perforation Treatment Performed - Jet Perforation |
2006-02-23 | Perforation Treatment Performed - Jet Perforation |
2006-02-28 | Perforation Treatment Performed - Fractured |
2006-03-30 | Well Began Production |
2006-03-30 | Well Fluid changed to Coalbed Methane-Coals and Other |
2006-03-30 | Well Mode changed to Flowing |
2010-12-20 | Perforation Treatment Performed - Jet Perforation |
2011-01-05 | Perforation Treatment Performed - Fractured |
2011-02-05 | Perforation Treatment Performed - Fractured |
2011-02-17 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-02-17 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-01-28 | Perforation | 806.00 | 810.00 | 13 |
2006-02-23 | Perforation | 438.00 | 438.50 | 13 |
2006-02-23 | Perforation | 383.90 | 384.40 | 13 |
2006-02-23 | Perforation | 379.00 | 380.00 | 13 |
2006-02-23 | Perforation | 366.10 | 367.10 | 13 |
2006-02-23 | Perforation | 362.80 | 363.30 | 13 |
2006-02-23 | Perforation | 357.20 | 357.70 | 13 |
2006-02-23 | Perforation | 356.10 | 356.60 | 13 |
2006-02-23 | Perforation | 345.50 | 346.00 | 13 |
2006-02-23 | Perforation | 342.60 | 343.10 | 13 |
2006-02-23 | Perforation | 339.60 | 340.10 | 13 |
2006-02-23 | Perforation | 506.90 | 507.40 | 13 |
2006-02-23 | Perforation | 336.30 | 337.30 | 13 |
2006-02-23 | Perforation | 331.30 | 331.80 | 13 |
2006-02-23 | Perforation | 328.50 | 329.50 | 13 |
2006-02-23 | Perforation | 321.90 | 322.40 | 13 |
2006-02-23 | Perforation | 216.90 | 217.40 | 13 |
2006-02-23 | Perforation | 207.70 | 208.20 | 13 |
2006-02-23 | Perforation | 206.30 | 206.80 | 13 |
2006-02-28 | Fracture | 206.30 | 507.40 | 0 |
2010-12-20 | Perforation | 759.00 | 762.00 | 13 |
2010-12-20 | Perforation | 682.00 | 684.00 | 13 |
2006-02-23 | Perforation | 505.40 | 505.90 | 13 |
2010-12-20 | Perforation | 631.00 | 633.00 | 13 |
2010-12-20 | Perforation | 554.00 | 557.00 | 13 |
2010-12-20 | Perforation | 456.00 | 459.00 | 13 |
2010-12-20 | Perforation | 420.00 | 422.00 | 13 |
2010-12-20 | Perforation | 389.00 | 392.00 | 13 |
2010-12-20 | Perforation | 295.00 | 296.00 | 13 |
2010-12-20 | Perforation | 285.00 | 286.00 | 13 |
2011-01-05 | Fracture | 759.00 | 762.00 | 0 |
2011-01-05 | Fracture | 682.00 | 684.00 | 0 |
2011-01-05 | Fracture | 631.00 | 633.00 | 0 |
2006-02-23 | Perforation | 504.40 | 504.90 | 13 |
2011-01-05 | Fracture | 554.00 | 557.00 | 0 |
2011-02-05 | Fracture | 504.40 | 507.40 | 0 |
2011-02-05 | Fracture | 464.00 | 470.90 | 0 |
2011-02-05 | Fracture | 438.00 | 452.30 | 0 |
2011-02-05 | Fracture | 321.90 | 384.40 | 0 |
2011-02-05 | Fracture | 206.30 | 217.40 | 0 |
2011-02-05 | Fracture | 456.00 | 459.00 | 0 |
2011-02-05 | Fracture | 389.00 | 422.00 | 0 |
2011-02-05 | Fracture | 285.00 | 296.00 | 0 |
2006-02-23 | Perforation | 470.40 | 470.90 | 13 |
2006-02-23 | Perforation | 469.30 | 469.80 | 13 |
2006-02-23 | Perforation | 464.60 | 465.60 | 13 |
2006-02-23 | Perforation | 451.80 | 452.30 | 13 |
2006-02-23 | Perforation | 443.80 | 444.30 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 5590 | 0.0 | 0.0 | 0.0 |
2007 | 7866 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 8382 | 0.0 | 0.0 | 0.0 |
2012 | 8764 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8736 | 0.0 | 0.0 | 0.0 |
2015 | 8730 | 0.0 | 0.0 | 0.0 |
2016 | 8710 | 0.0 | 0.0 | 0.0 |
2017 | 8541 | 0.0 | 0.0 | 0.0 |
2018 | 8707 | 0.0 | 0.0 | 0.0 |
2019 | 8745 | 0.0 | 0.0 | 0.0 |
2020 | 2169 | 0.0 | 0.0 | 0.0 |
For data sources see[5]