X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0254242816003"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0254242816003
 
| Well ID: 0254242816003
| style="height=100%; align=center" rowspan="14" | {{#display_map: 51.16708700000003773, -113.28944699999999557 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="14" | {{#display_map: 51.167087, -113.289447 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/16-28-025-24W4/3
 
| Location: 00/16-28-025-24W4/3
 
|-
 
|-
| Well Name: PCP PCR 16C GAYFORD 16-28-25-24
+
| Location Alias: 00/16-28-25-24 W4M
 +
|-
 +
| Location Alias 2: 00/16-28-025-24 W4/03
 +
|-
 +
| Province: Alberta
 +
|-
 +
| County/Municipality: [[Wheatland County,_Alberta|Wheatland County]]
 +
|-
 +
| Well Name: EMBER ENTICE 16-28-25-24
 +
|-
 +
| Operator Name: [[Ember Resources Inc.]]
 +
|-
 +
| License Number: 0225836
 
|-
 
|-
 
| License Date: 1999-08-27
 
| License Date: 1999-08-27
 
|-
 
|-
| Final Drilling Date: 1999-09-19
+
| License Status: Issued
 +
|-
 +
| Spud Date: 1999-09-13
 +
|-
 +
| Final Drill Date: 1999-09-19
 +
|-
 +
| Well Total Depth: 1694 m
 +
|-
 +
| Surface Hole Latitude: 51.167087
 +
|-
 +
| Surface Hole Longitude: -113.289447
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 
 +
== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
| 1999-09-15
 +
| style="text-align: right;" | 1031
 +
 
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Direction Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref>
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 2000-01-05
 +
| Perforation
 +
| style="text-align: right;" | 1437
 +
| style="text-align: right;" | 1440
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2000-01-13
 +
| Fracture
 +
| style="text-align: right;" | 1437
 +
| style="text-align: right;" | 1440
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2000-04-02
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1427
 +
| style="text-align: right;" | 1430
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2000-04-03
 +
| Perforation
 +
| style="text-align: right;" | 1376
 +
| style="text-align: right;" | 1380.5
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2000-04-24
 +
| Fracture
 +
| style="text-align: right;" | 1376
 +
| style="text-align: right;" | 1380.5
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2000-04-26
 +
| Chemical Squeeze
 +
| style="text-align: right;" | 1376
 +
| style="text-align: right;" | 1380.5
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2000-06-07
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1360
 +
| style="text-align: right;" | 1368
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2004-06-24
 +
| Perforation
 +
| style="text-align: right;" | 756
 +
| style="text-align: right;" | 760
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2004-07-23
 +
| Perforation
 +
| style="text-align: right;" | 407
 +
| style="text-align: right;" | 410
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2008-08-12
 +
| Perforation
 +
| style="text-align: right;" | 508
 +
| style="text-align: right;" | 508.5
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2008-08-12
 +
| Perforation
 +
| style="text-align: right;" | 495
 +
| style="text-align: right;" | 495.5
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2008-08-12
 +
| Perforation
 +
| style="text-align: right;" | 493.4
 +
| style="text-align: right;" | 493.9
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2008-08-12
 +
| Perforation
 +
| style="text-align: right;" | 490
 +
| style="text-align: right;" | 491
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2008-08-12
 +
| Perforation
 +
| style="text-align: right;" | 455.4
 +
| style="text-align: right;" | 457.4
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2008-08-12
 +
| Perforation
 +
| style="text-align: right;" | 451.1
 +
| style="text-align: right;" | 452.1
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2008-08-12
 +
| Perforation
 +
| style="text-align: right;" | 437.8
 +
| style="text-align: right;" | 438.8
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2008-08-12
 +
| Perforation
 +
| style="text-align: right;" | 431.1
 +
| style="text-align: right;" | 431.6
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2008-08-12
 +
| Perforation
 +
| style="text-align: right;" | 424.8
 +
| style="text-align: right;" | 425.8
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2008-08-12
 +
| Perforation
 +
| style="text-align: right;" | 369.6
 +
| style="text-align: right;" | 372.6
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2008-08-12
 +
| Perforation
 +
| style="text-align: right;" | 353.7
 +
| style="text-align: right;" | 354.7
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2008-08-12
 +
| Perforation
 +
| style="text-align: right;" | 352.5
 +
| style="text-align: right;" | 353
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2008-08-12
 +
| Perforation
 +
| style="text-align: right;" | 344.3
 +
| style="text-align: right;" | 344.8
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2008-08-12
 +
| Perforation
 +
| style="text-align: right;" | 333.6
 +
| style="text-align: right;" | 334.6
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2008-08-12
 +
| Perforation
 +
| style="text-align: right;" | 331
 +
| style="text-align: right;" | 332
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2008-08-12
 +
| Perforation
 +
| style="text-align: right;" | 328
 +
| style="text-align: right;" | 328.5
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2008-08-12
 +
| Perforation
 +
| style="text-align: right;" | 326
 +
| style="text-align: right;" | 328
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2008-08-12
 +
| Perforation
 +
| style="text-align: right;" | 318.6
 +
| style="text-align: right;" | 319.1
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2008-08-12
 +
| Perforation
 +
| style="text-align: right;" | 315.2
 +
| style="text-align: right;" | 316.2
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2008-08-12
 +
| Perforation
 +
| style="text-align: right;" | 312.7
 +
| style="text-align: right;" | 313.2
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2008-08-12
 +
| Perforation
 +
| style="text-align: right;" | 258.5
 +
| style="text-align: right;" | 259
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Total Depth: 1694.0m
+
| 2008-08-12
 +
| Perforation
 +
| style="text-align: right;" | 240.3
 +
| style="text-align: right;" | 240.8
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Fluid Type: Coalbed Methane-Coals and Oth
+
| 2008-08-12
 +
| Perforation
 +
| style="text-align: right;" | 238.7
 +
| style="text-align: right;" | 239.2
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Status: Flowing
+
| 2008-08-12
 +
| Perforation
 +
| style="text-align: right;" | 226.4
 +
| style="text-align: right;" | 226.9
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Well Type: Not Applicable
+
| 2008-08-12
 +
| Perforation
 +
| style="text-align: right;" | 225.6
 +
| style="text-align: right;" | 226.1
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Configuration: Vertical
+
| 2008-08-12
 +
| Perforation
 +
| style="text-align: right;" | 220.2
 +
| style="text-align: right;" | 220.7
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Latitude: 51.16708700000003773
+
| 2008-08-12
 +
| Perforation
 +
| style="text-align: right;" | 218.8
 +
| style="text-align: right;" | 219.3
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Longitude: -113.28944699999999557
+
| 2008-08-17
 +
| Fracture
 +
| style="text-align: right;" | 218.8
 +
| style="text-align: right;" | 508.5
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref>
 +
<!--== Fracking Activities ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" | End Date
 +
!scope="col" | Chemical Name
 +
!scope="col" style="text-align: right;" | CAS Number
 +
!scope="col" | Purpose
 +
!scope="col" style="text-align: right;" | Job Percentage
 +
!scope="col" | Supplier
 +
|}-->
  
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 2005
 +
| style="text-align: right;" | 864
 +
| style="text-align: right;" | 85.3
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2006
 +
| style="text-align: right;" | 8501
 +
| style="text-align: right;" | 2805.2
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2007
 +
| style="text-align: right;" | 7531
 +
| style="text-align: right;" | 2944.1
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2008
 +
| style="text-align: right;" | 8783
 +
| style="text-align: right;" | 706.4
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 4.9
 +
|-
 +
| 2009
 +
| style="text-align: right;" | 8759
 +
| style="text-align: right;" | 769.1
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 2.3
 +
|-
 +
| 2010
 +
| style="text-align: right;" | 8759
 +
| style="text-align: right;" | 552.2
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 1.7
 +
|-
 +
| 2011
 +
| style="text-align: right;" | 8718
 +
| style="text-align: right;" | 603.2
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 3.2
 +
|-
 +
| 2012
 +
| style="text-align: right;" | 8764
 +
| style="text-align: right;" | 699.6
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 2.9
 +
|-
 +
| 2013
 +
| style="text-align: right;" | 8759
 +
| style="text-align: right;" | 266.5
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 2.4
 +
|-
 +
| 2014
 +
| style="text-align: right;" | 8736
 +
| style="text-align: right;" | 362.7
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 1.7
 +
|-
 +
| 2015
 +
| style="text-align: right;" | 8731
 +
| style="text-align: right;" | 424.4
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 4.2
 +
|-
 +
| 2016
 +
| style="text-align: right;" | 8710
 +
| style="text-align: right;" | 312.6
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2017
 +
| style="text-align: right;" | 8541
 +
| style="text-align: right;" | 260.2
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2018
 +
| style="text-align: right;" | 8704
 +
| style="text-align: right;" | 249.9
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2019
 +
| style="text-align: right;" | 2148
 +
| style="text-align: right;" | 8.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = ST37: List of Wells in Alberta
+
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2015-07-02
+
| date = 2018-04-24
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2015-07-14 }}</ref>
+
  | accessdate = 2018-05-14 }}</ref>
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
 
==References==
 
==References==
 
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta]][[Category:Wells]]

Revision as of 12:37, 8 June 2019

Well Details

Well ID: 0254242816003
Loading map...
Location: 00/16-28-025-24W4/3
Location Alias: 00/16-28-25-24 W4M
Location Alias 2: 00/16-28-025-24 W4/03
Province: Alberta
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 16-28-25-24
Operator Name: Ember Resources Inc.
License Number: 0225836
License Date: 1999-08-27
License Status: Issued
Spud Date: 1999-09-13
Final Drill Date: 1999-09-19
Well Total Depth: 1694 m
Surface Hole Latitude: 51.167087
Surface Hole Longitude: -113.289447

For data sources see[1][2]

Directional Drilling

Start Date Depth (m) Reason
1999-09-15 1031

For data sources see[3]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-01-05 Perforation 1437 1440 20
2000-01-13 Fracture 1437 1440 0
2000-04-02 Packing Device Capped w/Cement 1427 1430 0
2000-04-03 Perforation 1376 1380.5 20
2000-04-24 Fracture 1376 1380.5 0
2000-04-26 Chemical Squeeze 1376 1380.5 0
2000-06-07 Packing Device Capped w/Cement 1360 1368 0
2004-06-24 Perforation 756 760 13
2004-07-23 Perforation 407 410 13
2008-08-12 Perforation 508 508.5 13
2008-08-12 Perforation 495 495.5 13
2008-08-12 Perforation 493.4 493.9 13
2008-08-12 Perforation 490 491 13
2008-08-12 Perforation 455.4 457.4 13
2008-08-12 Perforation 451.1 452.1 13
2008-08-12 Perforation 437.8 438.8 13
2008-08-12 Perforation 431.1 431.6 13
2008-08-12 Perforation 424.8 425.8 13
2008-08-12 Perforation 369.6 372.6 13
2008-08-12 Perforation 353.7 354.7 13
2008-08-12 Perforation 352.5 353 13
2008-08-12 Perforation 344.3 344.8 13
2008-08-12 Perforation 333.6 334.6 13
2008-08-12 Perforation 331 332 13
2008-08-12 Perforation 328 328.5 13
2008-08-12 Perforation 326 328 13
2008-08-12 Perforation 318.6 319.1 13
2008-08-12 Perforation 315.2 316.2 13
2008-08-12 Perforation 312.7 313.2 13
2008-08-12 Perforation 258.5 259 13
2008-08-12 Perforation 240.3 240.8 13
2008-08-12 Perforation 238.7 239.2 13
2008-08-12 Perforation 226.4 226.9 13
2008-08-12 Perforation 225.6 226.1 13
2008-08-12 Perforation 220.2 220.7 13
2008-08-12 Perforation 218.8 219.3 13
2008-08-17 Fracture 218.8 508.5 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 864 85.3 0.0 0.0
2006 8501 2805.2 0.0 0.0
2007 7531 2944.1 0.0 0.0
2008 8783 706.4 0.0 4.9
2009 8759 769.1 0.0 2.3
2010 8759 552.2 0.0 1.7
2011 8718 603.2 0.0 3.2
2012 8764 699.6 0.0 2.9
2013 8759 266.5 0.0 2.4
2014 8736 362.7 0.0 1.7
2015 8731 424.4 0.0 4.2
2016 8710 312.6 0.0 0.0
2017 8541 260.2 0.0 0.0
2018 8704 249.9 0.0 0.0
2019 2148 8.0 0.0 0.0

For data sources see[5]

References