If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254242607000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.161209,"lon":-113.246724,"icon":""}]} |
Location: 00/07-26-025-24W4/0 | |
Location Alias: 00/07-26-25-24 W4M | |
Location Alias 2: 00/07-26-025-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 24 | |
Section: 26 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 7-26-25-24 | |
Operator Name: Ember Resources Inc. | |
License Number: 0377694 | |
License Date: 2007-06-01 | |
License Status: Issued | |
Spud Date: 2007-09-21 | |
Final Drill Date: 2007-09-26 | |
Well Total Depth: 604.00 m | |
Surface Hole Latitude: 51.161209 | |
Surface Hole Longitude: -113.246724 |
Date | Event |
---|---|
2007-06-01 | Obtained License |
2007-09-21 | Surface Casing Operation Performed |
2007-09-26 | Finished Drilling |
2007-09-26 | Production Casing Operation Performed |
2007-09-26 | Rig Released |
2007-09-26 | Well Mode changed to Drilled and Cased |
2007-09-30 | Well Log Performed |
2007-10-14 | Perforation Treatment Performed - Jet Perforation |
2007-10-26 | Perforation Treatment Performed - Fractured |
2007-11-01 | Well Fluid changed to Gas |
2007-11-01 | Well Mode changed to Testing |
2007-11-13 | Well Began Production |
2007-11-13 | Well Fluid changed to Gas |
2007-11-13 | Well Mode changed to Flowing |
2011-12-18 | Perforation Treatment Performed - Jet Perforation |
2012-01-11 | Perforation Treatment Performed - Fractured |
2012-01-27 | Perforation Treatment Performed - Jet Perforation |
2012-02-06 | Perforation Treatment Performed - Fractured |
2012-02-27 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-02-27 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2007-10-14 | Perforation | 433.00 | 437.00 | 13 |
2012-01-27 | Perforation | 301.00 | 303.00 | 13 |
2012-01-27 | Perforation | 305.60 | 306.10 | 13 |
2012-01-27 | Perforation | 309.00 | 311.00 | 13 |
2012-01-27 | Perforation | 317.50 | 319.00 | 13 |
2012-01-27 | Perforation | 320.50 | 321.50 | 13 |
2012-01-27 | Perforation | 332.00 | 332.50 | 13 |
2012-01-27 | Perforation | 340.20 | 341.20 | 13 |
2012-01-27 | Perforation | 350.50 | 351.50 | 13 |
2012-01-27 | Perforation | 364.00 | 365.00 | 13 |
2012-01-27 | Perforation | 365.20 | 367.70 | 13 |
2007-10-26 | Fracture | 433.00 | 437.00 | 0 |
2012-01-27 | Perforation | 414.70 | 416.20 | 13 |
2012-01-27 | Perforation | 419.90 | 420.90 | 13 |
2012-01-27 | Perforation | 426.70 | 427.70 | 13 |
2012-01-27 | Perforation | 437.80 | 439.30 | 13 |
2012-01-27 | Perforation | 444.70 | 445.70 | 13 |
2012-01-27 | Perforation | 480.80 | 481.30 | 13 |
2012-01-27 | Perforation | 483.60 | 484.10 | 13 |
2012-02-06 | Fracture | 212.90 | 484.10 | 0 |
2011-12-18 | Perforation | 405.50 | 407.50 | 13 |
2011-12-18 | Perforation | 543.00 | 544.00 | 13 |
2012-01-11 | Fracture | 405.50 | 407.50 | 0 |
2012-01-11 | Fracture | 543.00 | 544.00 | 0 |
2012-01-27 | Perforation | 212.90 | 213.40 | 13 |
2012-01-27 | Perforation | 249.00 | 252.00 | 13 |
2012-01-27 | Perforation | 264.50 | 266.50 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2007 | 986 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 8739 | 0.0 | 0.0 | 0.0 |
2012 | 8776 | 0.0 | 0.0 | 0.0 |
2013 | 8749 | 0.0 | 0.0 | 0.0 |
2014 | 8711 | 0.0 | 0.0 | 0.0 |
2015 | 8725 | 0.0 | 0.0 | 0.0 |
2016 | 8728 | 0.0 | 0.0 | 0.0 |
2017 | 8707 | 0.0 | 0.0 | 0.0 |
2018 | 8675 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]