If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254241512000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.134348,"lon":-113.281019,"icon":""}]} |
Location: 00/12-15-025-24W4/0 | |
Location Alias: 00/12-15-25-24 W4M | |
Location Alias 2: 00/12-15-025-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 24 | |
Section: 15 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 12-15-25-24 | |
Operator Name: Ember Resources Inc. | |
License Number: 0378130 | |
License Date: 2007-06-13 | |
License Status: Issued | |
Spud Date: 2007-08-08 | |
Final Drill Date: 2007-08-15 | |
Well Total Depth: 657.00 m | |
Surface Hole Latitude: 51.134348 | |
Surface Hole Longitude: -113.281019 |
Date | Event |
---|---|
2007-06-13 | Obtained License |
2007-08-08 | Surface Casing Operation Performed |
2007-08-15 | Finished Drilling |
2007-08-15 | Production Casing Operation Performed |
2007-08-15 | Rig Released |
2007-08-15 | Well Mode changed to Drilled and Cased |
2007-08-18 | Well Log Performed |
2007-09-05 | Well Log Performed |
2007-09-09 | Perforation Treatment Performed - Jet Perforation |
2007-09-14 | Perforation Treatment Performed - Fractured |
2007-09-19 | Well Fluid changed to Gas |
2007-09-19 | Well Mode changed to Testing |
2007-09-26 | Perforation Treatment Performed - Jet Perforation |
2007-10-03 | Perforation Treatment Performed - Fractured |
2007-10-12 | Well Structure changed to Commingled |
2010-06-29 | Perforation Treatment Performed - Jet Perforation |
2010-07-01 | Perforation Treatment Performed - Fractured |
2011-04-07 | Well Began Production |
2011-04-07 | Well Fluid changed to Gas |
2011-04-07 | Well Mode changed to Flowing |
2011-04-08 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2007-09-09 | Perforation | 483.00 | 486.00 | 13 |
2007-09-26 | Perforation | 463.00 | 464.00 | 13 |
2007-09-26 | Perforation | 411.50 | 412.50 | 13 |
2007-09-26 | Perforation | 394.20 | 396.20 | 13 |
2007-09-26 | Perforation | 383.80 | 384.30 | 13 |
2007-09-26 | Perforation | 375.10 | 375.60 | 13 |
2007-09-26 | Perforation | 374.00 | 374.50 | 13 |
2007-09-26 | Perforation | 370.90 | 371.40 | 13 |
2007-09-26 | Perforation | 365.30 | 365.80 | 13 |
2007-09-26 | Perforation | 361.00 | 363.00 | 13 |
2007-09-26 | Perforation | 353.60 | 354.10 | 13 |
2007-09-14 | Fracture | 483.00 | 486.00 | 0 |
2007-09-26 | Perforation | 306.70 | 307.20 | 13 |
2007-09-26 | Perforation | 299.30 | 299.80 | 13 |
2007-09-26 | Perforation | 272.80 | 273.30 | 13 |
2007-09-26 | Perforation | 246.60 | 247.10 | 13 |
2007-09-26 | Perforation | 234.30 | 234.80 | 13 |
2007-09-26 | Perforation | 233.20 | 234.20 | 13 |
2007-10-03 | Fracture | 233.20 | 538.00 | 0 |
2010-06-29 | Perforation | 587.50 | 589.50 | 13 |
2010-06-29 | Perforation | 450.50 | 453.00 | 13 |
2010-06-29 | Perforation | 324.50 | 327.50 | 13 |
2007-09-26 | Perforation | 537.50 | 538.00 | 13 |
2010-06-29 | Perforation | 186.50 | 188.00 | 13 |
2010-07-01 | Fracture | 324.50 | 589.50 | 0 |
2007-09-26 | Perforation | 534.90 | 535.40 | 13 |
2007-09-26 | Perforation | 497.00 | 497.50 | 13 |
2007-09-26 | Perforation | 495.50 | 496.50 | 13 |
2007-09-26 | Perforation | 490.50 | 492.50 | 13 |
2007-09-26 | Perforation | 475.00 | 476.00 | 13 |
2007-09-26 | Perforation | 469.00 | 469.50 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2007 | 24 | 0.0 | 0.0 | 0.0 |
For data sources see[5]