X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254240514000

Well Details

Well ID: 0254240514000
Loading map...
Location: 00/14-05-025-24W4/0
Location Alias: 00/14-05-25-24 W4M
Location Alias 2: 00/14-05-025-24 W4/00
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 24
Section: 05
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 14-5-25-24
Operator Name: Ember Resources Inc.
License Number: 0427892
License Date: 2010-12-16
License Status: Issued
Spud Date: 2011-12-03
Final Drill Date: 2011-12-04
Well Total Depth: 1041.00 m
Surface Hole Latitude: 51.104199
Surface Hole Longitude: -113.329647

For data sources see[1][2]

Well History

Date Event
2010-12-16 Obtained License
2011-12-03 Direction Drilling Operation Performed - Deviate
2011-12-04 Finished Drilling
2011-12-04 Surface Casing Operation Performed
2011-12-04 Well Mode changed to Drilled and Cased
2011-12-05 Production Casing Operation Performed
2011-12-05 Rig Released
2011-12-16 Well Log Performed
2012-01-25 Perforation Treatment Performed - Jet Perforation
2012-02-03 Perforation Treatment Performed - Fractured
2012-02-05 Well Fluid changed to Coalbed Methane-Coals and Other
2012-02-05 Well Mode changed to Testing
2012-02-16 Well Began Production
2012-02-16 Well Fluid changed to Coalbed Methane-Coals and Other
2012-02-16 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-12-03 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-01-25 Perforation 271.00 272.00 13
2012-01-25 Perforation 407.00 410.00 13
2012-01-25 Perforation 416.00 416.50 13
2012-01-25 Perforation 428.90 430.40 13
2012-01-25 Perforation 432.90 433.90 13
2012-01-25 Perforation 437.70 438.20 13
2012-01-25 Perforation 447.90 450.40 13
2012-01-25 Perforation 452.40 454.40 13
2012-01-25 Perforation 459.90 460.90 13
2012-01-25 Perforation 472.00 473.00 13
2012-01-25 Perforation 486.10 488.60 13
2012-01-25 Perforation 278.30 278.80 13
2012-01-25 Perforation 497.40 497.90 13
2012-01-25 Perforation 499.00 502.00 13
2012-01-25 Perforation 553.40 553.90 13
2012-01-25 Perforation 564.20 565.70 13
2012-01-25 Perforation 571.60 572.60 13
2012-01-25 Perforation 583.30 584.80 13
2012-01-25 Perforation 590.80 593.30 13
2012-01-25 Perforation 595.60 596.10 13
2012-01-25 Perforation 598.20 599.70 13
2012-01-25 Perforation 642.10 642.60 13
2012-01-25 Perforation 279.50 280.00 13
2012-01-25 Perforation 643.40 644.90 13
2012-01-25 Perforation 862.00 865.00 13
2012-02-03 Fracture 271.00 865.00 0
2012-01-25 Perforation 291.50 292.00 13
2012-01-25 Perforation 305.00 307.00 13
2012-01-25 Perforation 314.60 315.60 13
2012-01-25 Perforation 322.30 323.30 13
2012-01-25 Perforation 324.50 325.00 13
2012-01-25 Perforation 330.50 333.50 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 7682 0.0 0.0 0.0
2013 8720 0.0 0.0 0.0
2014 8717 0.0 0.0 0.0
2015 8685 0.0 0.0 0.0
2016 8691 0.0 0.0 0.0
2017 8736 0.0 0.0 0.0
2018 8736 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References