X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254240503000

Well Details

Well ID: 0254240503000
Loading map...
Location: 00/03-05-025-24W4/0
Location Alias: 00/03-05-25-24 W4M
Location Alias 2: 00/03-05-025-24 W4/00
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 24
Section: 05
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 3-5-25-24
Operator Name: Ember Resources Inc.
License Number: 0427870
License Date: 2010-12-16
License Status: Issued
Spud Date: 2011-12-09
Final Drill Date: 2011-12-10
Well Total Depth: 1042.00 m
Surface Hole Latitude: 51.098417
Surface Hole Longitude: -113.312334

For data sources see[1][2]

Well History

Date Event
2010-12-16 Obtained License
2011-12-09 Direction Drilling Operation Performed - Deviate
2011-12-09 Surface Casing Operation Performed
2011-12-10 Finished Drilling
2011-12-10 Production Casing Operation Performed
2011-12-10 Rig Released
2011-12-10 Well Mode changed to Drilled and Cased
2011-12-18 Well Log Performed
2012-01-22 Perforation Treatment Performed - Jet Perforation
2012-01-22 Well Log Performed
2012-02-02 Perforation Treatment Performed - Fractured
2012-02-10 Well Fluid changed to Coalbed Methane-Coals and Other
2012-02-10 Well Mode changed to Testing
2012-02-14 Perforation Treatment Performed - Jet Perforation
2012-02-22 Perforation Treatment Performed - Fractured
2012-03-18 Well Began Production
2012-03-18 Well Fluid changed to Coalbed Methane-Coals and Other
2012-03-18 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-12-09 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-01-22 Perforation 821.00 824.00 13
2012-02-14 Perforation 338.00 341.00 13
2012-02-14 Perforation 368.00 368.50 13
2012-02-14 Perforation 412.60 413.60 13
2012-02-14 Perforation 427.50 428.50 13
2012-02-14 Perforation 439.10 439.60 13
2012-02-14 Perforation 446.10 448.60 13
2012-02-14 Perforation 450.80 452.30 13
2012-02-14 Perforation 459.30 459.80 13
2012-02-14 Perforation 469.00 472.00 13
2012-02-14 Perforation 474.50 476.00 13
2012-01-22 Perforation 890.00 891.00 13
2012-02-14 Perforation 484.20 484.70 13
2012-02-14 Perforation 485.90 488.40 13
2012-02-14 Perforation 497.80 498.80 13
2012-02-14 Perforation 500.20 502.20 13
2012-02-14 Perforation 505.00 508.00 13
2012-02-14 Perforation 562.50 563.00 13
2012-02-14 Perforation 570.40 571.40 13
2012-02-14 Perforation 582.60 584.10 13
2012-02-14 Perforation 589.30 589.80 13
2012-02-14 Perforation 591.20 592.20 13
2012-01-22 Perforation 899.00 902.00 13
2012-02-14 Perforation 594.90 596.40 13
2012-02-14 Perforation 597.90 598.40 13
2012-02-14 Perforation 601.30 601.80 13
2012-02-14 Perforation 638.00 640.00 13
2012-02-14 Perforation 642.10 642.60 13
2012-02-14 Perforation 643.50 644.50 13
2012-02-14 Perforation 645.80 646.30 13
2012-02-22 Fracture 290.10 646.30 0
2012-02-02 Fracture 821.00 824.00 0
2012-02-02 Fracture 890.00 891.00 0
2012-02-02 Fracture 899.00 902.00 0
2012-02-14 Perforation 290.10 290.60 13
2012-02-14 Perforation 293.60 294.10 13
2012-02-14 Perforation 313.70 314.70 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6927 0.0 0.0 0.0
2013 8720 0.0 0.0 0.0
2014 8717 0.0 0.0 0.0
2015 8685 0.0 0.0 0.0
2016 8691 0.0 0.0 0.0
2017 8736 0.0 0.0 0.0
2018 8736 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References