If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254240501000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.098318,"lon":-113.312333,"icon":""}]} |
Location: 00/01-05-025-24W4/0 | |
Location Alias: 00/01-05-25-24 W4M | |
Location Alias 2: 00/01-05-025-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 24 | |
Section: 05 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 1-5-25-24 | |
Operator Name: Ember Resources Inc. | |
License Number: 0427891 | |
License Date: 2010-12-16 | |
License Status: Issued | |
Spud Date: 2011-12-11 | |
Final Drill Date: 2011-12-12 | |
Well Total Depth: 864.00 m | |
Surface Hole Latitude: 51.098318 | |
Surface Hole Longitude: -113.312333 |
Date | Event |
---|---|
2010-12-16 | Obtained License |
2011-12-11 | Surface Casing Operation Performed |
2011-12-12 | Finished Drilling |
2011-12-12 | Production Casing Operation Performed |
2011-12-12 | Rig Released |
2011-12-12 | Well Mode changed to Drilled and Cased |
2011-12-18 | Well Log Performed |
2012-01-22 | Perforation Treatment Performed - Jet Perforation |
2012-01-22 | Well Log Performed |
2012-02-03 | Perforation Treatment Performed - Fractured |
2012-02-06 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-02-06 | Well Mode changed to Testing |
2012-02-12 | Perforation Treatment Performed - Jet Perforation |
2012-02-21 | Perforation Treatment Performed - Fractured |
2012-03-16 | Well Began Production |
2012-03-16 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-03-16 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-01-22 | Perforation | 575.00 | 577.00 | 13 |
2012-02-12 | Perforation | 220.00 | 221.00 | 13 |
2012-02-12 | Perforation | 224.80 | 225.30 | 13 |
2012-02-12 | Perforation | 246.50 | 247.00 | 13 |
2012-02-12 | Perforation | 273.00 | 275.00 | 13 |
2012-02-12 | Perforation | 327.80 | 328.30 | 13 |
2012-02-12 | Perforation | 338.80 | 340.20 | 13 |
2012-02-12 | Perforation | 352.70 | 354.70 | 13 |
2012-02-12 | Perforation | 358.10 | 359.10 | 13 |
2012-02-12 | Perforation | 361.70 | 362.20 | 13 |
2012-02-12 | Perforation | 364.40 | 364.90 | 13 |
2012-01-22 | Perforation | 632.00 | 634.00 | 13 |
2012-02-12 | Perforation | 375.20 | 376.20 | 13 |
2012-02-12 | Perforation | 383.60 | 384.10 | 13 |
2012-02-12 | Perforation | 385.50 | 387.50 | 13 |
2012-02-12 | Perforation | 397.20 | 397.70 | 13 |
2012-02-12 | Perforation | 398.70 | 401.20 | 13 |
2012-02-12 | Perforation | 449.80 | 450.80 | 13 |
2012-02-12 | Perforation | 456.20 | 456.70 | 13 |
2012-02-12 | Perforation | 464.80 | 465.30 | 13 |
2012-02-12 | Perforation | 473.50 | 474.00 | 13 |
2012-02-12 | Perforation | 475.90 | 477.40 | 13 |
2012-01-22 | Perforation | 783.00 | 785.00 | 13 |
2012-02-12 | Perforation | 481.80 | 482.30 | 13 |
2012-02-12 | Perforation | 513.50 | 515.50 | 13 |
2012-02-12 | Perforation | 517.80 | 518.30 | 13 |
2012-02-12 | Perforation | 519.10 | 520.10 | 13 |
2012-02-12 | Perforation | 520.90 | 521.40 | 13 |
2012-02-21 | Fracture | 217.60 | 521.40 | 0 |
2012-01-22 | Perforation | 823.00 | 825.00 | 13 |
2012-02-03 | Fracture | 575.00 | 577.00 | 0 |
2012-02-03 | Fracture | 632.00 | 634.00 | 0 |
2012-02-03 | Fracture | 783.00 | 785.00 | 0 |
2012-02-03 | Fracture | 823.00 | 825.00 | 0 |
2012-02-12 | Perforation | 217.60 | 218.10 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 7019 | 0.0 | 0.0 | 0.0 |
2013 | 8720 | 0.0 | 0.0 | 0.0 |
2014 | 8717 | 0.0 | 0.0 | 0.0 |
2015 | 8685 | 0.0 | 0.0 | 0.0 |
2016 | 8691 | 0.0 | 0.0 | 0.0 |
2017 | 8736 | 0.0 | 0.0 | 0.0 |
2018 | 8736 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]