X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254233402000

Well Details

Well ID: 0254233402000
Loading map...
Location: 00/02-34-025-23W4/0
Location Alias: 00/02-34-25-23 W4M
Location Alias 2: 00/02-34-025-23 W4/00
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 23
Section: 34
County/Municipality: Wheatland County
Well Name: ECA ECOG ROCKYFRD 2-34-25-23
Operator Name: Lynx Energy ULC
License Number: 0362591
License Date: 2006-09-01
License Status: Issued
Spud Date: 2006-10-05
Final Drill Date: 2006-10-25
Well Total Depth: 823.00 m
Surface Hole Latitude: 51.169580
Surface Hole Longitude: -113.129352

For data sources see[1][2]

Well History

Date Event
2006-09-01 Obtained License
2006-10-05 Surface Casing Operation Performed
2006-10-25 Finished Drilling
2006-10-25 Production Casing Operation Performed
2006-10-25 Rig Released
2006-10-25 Well Mode changed to Drilled and Cased
2006-10-28 Well Log Performed
2006-11-05 Perforation Treatment Performed - Jet Perforation
2006-11-29 Perforation Treatment Performed - Fractured
2006-12-02 Well Fluid changed to Gas
2006-12-02 Well Mode changed to Testing
2006-12-12 Well Began Production
2006-12-12 Well Fluid changed to Gas
2006-12-12 Well Mode changed to Flowing
2008-01-14 Perforation Treatment Performed - Jet Perforation
2008-02-01 Perforation Treatment Performed - Fractured
2008-02-05 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-11-05 Perforation 747.00 748.00 13
2006-11-29 Fracture 373.00 376.00 0
2006-11-29 Fracture 352.50 354.50 0
2008-01-14 Perforation 447.50 448.00 13
2008-01-14 Perforation 442.10 443.10 13
2008-01-14 Perforation 440.60 441.10 13
2008-01-14 Perforation 439.00 439.50 13
2008-01-14 Perforation 400.40 402.40 13
2008-01-14 Perforation 382.50 383.50 13
2008-01-14 Perforation 367.40 368.40 13
2008-01-14 Perforation 319.50 320.50 13
2006-11-05 Perforation 732.50 733.50 13
2008-01-14 Perforation 315.80 316.80 13
2008-01-14 Perforation 306.60 307.10 13
2008-01-14 Perforation 302.70 303.20 13
2008-01-14 Perforation 275.40 276.40 13
2008-01-14 Perforation 270.50 271.00 13
2008-01-14 Perforation 265.20 265.70 13
2008-01-14 Perforation 261.70 262.20 13
2008-01-14 Perforation 258.40 258.90 13
2008-01-14 Perforation 254.40 254.90 13
2008-02-01 Fracture 254.40 448.00 0
2006-11-05 Perforation 666.00 669.00 13
2006-11-05 Perforation 659.00 660.00 13
2006-11-05 Perforation 373.00 376.00 13
2006-11-05 Perforation 352.50 354.50 13
2006-11-29 Fracture 747.00 748.00 0
2006-11-29 Fracture 732.50 733.50 0
2006-11-29 Fracture 659.00 669.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 504 0.0 0.0 0.0
2007 8602 0.0 0.0 0.0
2008 1410 0.0 0.0 0.0

For data sources see[5]

References