X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254232704000

Well Details

Well ID: 0254232704000
Loading map...
Location: 00/04-27-025-23W4/0
Location Alias: 00/04-27-25-23 W4M
Location Alias 2: 00/04-27-025-23 W4/00
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 23
Section: 27
County/Municipality: Wheatland County
Well Name: HARVEST ROFORD 4-27-25-23
Operator Name: Harvest Operations Corp.
License Number: 0153582
License Date: 1992-08-31
License Status: Suspension
Spud Date: 1992-09-16
Final Drill Date: 1992-09-23
Well Total Depth: 1622.00 m
Surface Hole Latitude: 51.154945
Surface Hole Longitude: -113.138554

For data sources see[1][2]

Well History

Date Event
1992-08-31 Obtained License
1992-09-17 Surface Casing Operation Performed
1992-09-20 Direction Drilling Operation Performed - Deviate
1992-09-23 Finished Drilling
1992-09-23 Well Log Performed
1992-09-23 Well Mode changed to Drilled and Cased
1992-09-24 Production Casing Operation Performed
1992-09-24 Rig Released
1992-09-29 Well Log Performed
1992-09-30 Perforation Treatment Performed - Jet Perforation
1992-10-03 Well Began Production
1992-10-03 Well Fluid changed to Crude Oil
1992-10-03 Well Mode changed to Flowing
1993-04-16 Well Fluid changed to Crude Oil
1993-04-16 Well Mode changed to Pumping
1993-06-09 Well Log Performed
1993-08-04 Perforation Treatment Performed - Jet Perforation
1993-08-04 Well Log Performed
1993-08-05 Well Log Performed
1993-10-01 Well Fluid changed to Crude Oil
1993-10-01 Well Mode changed to Suspended
2011-06-05 Well Log Performed
2011-06-06 Well Log Performed
2011-06-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-06-07 Plug Back Performed
2011-06-07 Well Fluid changed to Crude Oil
2011-06-07 Well Mode changed to Abandoned Zone
2011-06-08 Perforation Treatment Performed - Jet Perforation
2011-06-08 Well Log Performed
2011-06-09 Perforation Treatment Performed - Remedial Casing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1992-09-20 1237.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-09-30 Perforation 1573.00 1575.00 13
1993-08-04 Perforation 1567.00 1569.00 14
2011-06-07 Packing Device Capped w/Cement 1544.00 1552.00 0
2011-06-08 Perforation 197.20 197.50 32
2011-06-08 Perforation 195.00 196.00 17
2011-06-09 Remedial Casing Cementing 197.20 197.50 0
2011-06-09 Remedial Casing Cementing 195.00 196.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 2077 0.0 0.0 0.0
1993 2440 0.0 0.0 0.0

For data sources see[6]

References