X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254231412000

Well Details

Well ID: 0254231412000
Loading map...
Location: 00/12-14-025-23W4/0
Location Alias: 00/12-14-25-23 W4M
Location Alias 2: 00/12-14-025-23 W4/00
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 23
Section: 14
County/Municipality: Wheatland County
Well Name: PCP ROCKYFORD 12-14-25-23
Operator Name: Lynx Energy ULC
License Number: 0144357
License Date: 1990-06-05
License Status: Issued
Spud Date: 1990-06-17
Final Drill Date: 1990-06-26
Well Total Depth: 1610.00 m
Surface Hole Latitude: 51.133972
Surface Hole Longitude: -113.120277

For data sources see[1][2]

Well History

Date Event
1990-06-05 Obtained License
1990-06-18 Surface Casing Operation Performed
1990-06-23 Drill Stem Test Performed
1990-06-26 Finished Drilling
1990-06-26 Well Mode changed to Drilled and Cased
1990-06-27 Drill Stem Test Performed
1990-06-27 Well Log Performed
1990-06-28 Drill Stem Test Performed
1990-06-30 Production Casing Operation Performed
1990-06-30 Rig Released
1990-08-17 Well Log Performed
1990-08-18 Perforation Treatment Performed - Jet Perforation
1990-08-18 Well Log Performed
1990-08-21 Perforation Treatment Performed - Jet Perforation
1990-08-21 Well Log Performed
1990-09-07 Well Began Production
1990-09-07 Well Fluid changed to Crude Oil
1990-09-07 Well Mode changed to Flowing
1991-07-19 Well Fluid changed to Crude Oil
1991-07-19 Well Mode changed to Pumping
1995-04-03 Perforation Treatment Performed - Jet Perforation
1995-04-03 Well Log Performed
1996-06-26 Well Fluid changed to Crude Oil
1996-06-26 Well Mode changed to Suspended
1999-11-14 Perforation Treatment Performed - Casing Patch (Over Perfs)
1999-11-14 Perforation Treatment Performed - Jet Perforation
1999-11-15 Well Log Performed
1999-11-18 Well Fluid changed to Crude Oil
1999-11-18 Well Mode changed to Flowing
1999-11-19 Well Fluid changed to Crude Oil
1999-11-19 Well Mode changed to Suspended
2000-04-01 Well Fluid changed to Crude Oil
2000-04-01 Well Mode changed to Pumping
2001-04-19 Well Log Performed
2001-06-01 Well Fluid changed to Crude Oil
2001-06-01 Well Mode changed to Suspended
2003-01-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-01-13 Plug Back Performed
2003-01-13 Well Fluid changed to Crude Oil
2003-01-13 Well Mode changed to Abandoned Zone
2003-01-14 Well Log Performed
2003-01-15 Perforation Treatment Performed - Jet Perforation
2003-01-16 Well Log Performed
2003-02-06 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-08-18 Perforation 1573.00 1574.00 13
2003-02-06 Fracture 639.00 651.00 0
1990-08-21 Perforation 1569.50 1571.00 13
1995-04-03 Perforation 1570.00 1571.00 13
1995-04-03 Perforation 1572.00 1575.00 13
1999-11-14 Perforation 1564.00 1567.00 17
1999-11-14 Casing Patch 1569.50 1575.00 0
2003-01-13 Packing Device Capped w/Cement 1547.00 1555.00 0
2003-01-15 Perforation 647.00 651.00 13
2003-01-15 Perforation 639.00 640.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 2729 0.0 0.0 0.0
1991 4029 0.0 0.0 0.0
1992 2560 0.0 0.0 0.0
1993 7487 0.0 0.0 0.0
1994 8516 0.0 0.0 0.0
1995 7700 0.0 0.0 0.0
1996 4243 0.0 0.0 0.0
1999 24 0.0 0.0 0.0
2001 480 0.0 0.0 0.0

For data sources see[5]

References