X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254223308000

Well Details

Well ID: 0254223308000
Loading map...
Location: 00/08-33-025-22W4/0
Location Alias: 00/08-33-25-22 W4M
Location Alias 2: 00/08-33-025-22 W4/00
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 22
Section: 33
County/Municipality: Wheatland County
Well Name: ECA ECOG ROCKYFRD 8-33-25-22
Operator Name: Lynx Energy ULC
License Number: 0361823
License Date: 2006-08-17
License Status: Issued
Spud Date: 2006-09-05
Final Drill Date: 2006-09-05
Well Total Depth: 853.00 m
Surface Hole Latitude: 51.174863
Surface Hole Longitude: -113.005792

For data sources see[1][2]

Well History

Date Event
2006-08-17 Obtained License
2006-09-05 Finished Drilling
2006-09-05 Surface Casing Operation Performed
2006-09-05 Well Mode changed to Drilled and Cased
2006-09-06 Production Casing Operation Performed
2006-09-06 Rig Released
2006-09-12 Well Log Performed
2006-10-03 Perforation Treatment Performed - Jet Perforation
2006-10-06 Perforation Treatment Performed - Fractured
2006-10-10 Well Fluid changed to Gas
2006-10-10 Well Mode changed to Testing
2006-11-17 Well Began Production
2006-11-17 Well Fluid changed to Gas
2006-11-17 Well Mode changed to Flowing
2007-05-18 Perforation Treatment Performed - Jet Perforation
2007-06-23 Perforation Treatment Performed - Fractured
2007-07-10 Well Structure changed to Commingled
2007-08-14 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-10-03 Perforation 743.00 744.00 13
2006-10-06 Fracture 648.50 651.50 0
2006-10-06 Fracture 635.00 636.50 0
2006-10-06 Fracture 602.00 603.50 0
2007-05-18 Perforation 763.00 764.00 13
2007-05-18 Perforation 756.30 756.80 13
2007-05-18 Perforation 481.50 482.50 13
2007-05-18 Perforation 476.00 476.50 13
2007-05-18 Perforation 435.30 437.30 13
2007-05-18 Perforation 417.00 418.00 13
2007-05-18 Perforation 411.20 412.20 13
2006-10-03 Perforation 740.00 742.00 13
2007-05-18 Perforation 404.00 405.00 13
2007-05-18 Perforation 351.60 353.60 13
2007-05-18 Perforation 345.00 346.00 13
2007-05-18 Perforation 326.00 327.00 13
2007-05-18 Perforation 323.50 324.50 13
2007-05-18 Perforation 312.50 314.50 13
2007-05-18 Perforation 302.50 303.50 13
2007-05-18 Perforation 299.50 300.00 13
2007-05-18 Perforation 295.00 296.00 13
2007-05-18 Perforation 248.30 248.80 13
2006-10-03 Perforation 693.00 694.00 13
2007-05-18 Perforation 240.00 241.00 13
2007-05-18 Perforation 221.00 222.00 13
2007-05-18 Perforation 208.00 209.00 13
2007-06-23 Fracture 208.00 764.00 0
2006-10-03 Perforation 670.50 671.50 13
2006-10-03 Perforation 648.50 651.50 13
2006-10-03 Perforation 635.00 636.50 13
2006-10-03 Perforation 602.00 603.50 13
2006-10-06 Fracture 693.00 694.00 0
2006-10-06 Fracture 670.50 671.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 840 0.0 0.0 0.0
2007 4309 0.0 0.0 0.0

For data sources see[5]

References