If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254223308000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.174863,"lon":-113.005792,"icon":""}]} |
Location: 00/08-33-025-22W4/0 | |
Location Alias: 00/08-33-25-22 W4M | |
Location Alias 2: 00/08-33-025-22 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 22 | |
Section: 33 | |
County/Municipality: Wheatland County | |
Well Name: ECA ECOG ROCKYFRD 8-33-25-22 | |
Operator Name: Lynx Energy ULC | |
License Number: 0361823 | |
License Date: 2006-08-17 | |
License Status: Issued | |
Spud Date: 2006-09-05 | |
Final Drill Date: 2006-09-05 | |
Well Total Depth: 853.00 m | |
Surface Hole Latitude: 51.174863 | |
Surface Hole Longitude: -113.005792 |
Date | Event |
---|---|
2006-08-17 | Obtained License |
2006-09-05 | Finished Drilling |
2006-09-05 | Surface Casing Operation Performed |
2006-09-05 | Well Mode changed to Drilled and Cased |
2006-09-06 | Production Casing Operation Performed |
2006-09-06 | Rig Released |
2006-09-12 | Well Log Performed |
2006-10-03 | Perforation Treatment Performed - Jet Perforation |
2006-10-06 | Perforation Treatment Performed - Fractured |
2006-10-10 | Well Fluid changed to Gas |
2006-10-10 | Well Mode changed to Testing |
2006-11-17 | Well Began Production |
2006-11-17 | Well Fluid changed to Gas |
2006-11-17 | Well Mode changed to Flowing |
2007-05-18 | Perforation Treatment Performed - Jet Perforation |
2007-06-23 | Perforation Treatment Performed - Fractured |
2007-07-10 | Well Structure changed to Commingled |
2007-08-14 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-10-03 | Perforation | 743.00 | 744.00 | 13 |
2006-10-06 | Fracture | 648.50 | 651.50 | 0 |
2006-10-06 | Fracture | 635.00 | 636.50 | 0 |
2006-10-06 | Fracture | 602.00 | 603.50 | 0 |
2007-05-18 | Perforation | 763.00 | 764.00 | 13 |
2007-05-18 | Perforation | 756.30 | 756.80 | 13 |
2007-05-18 | Perforation | 481.50 | 482.50 | 13 |
2007-05-18 | Perforation | 476.00 | 476.50 | 13 |
2007-05-18 | Perforation | 435.30 | 437.30 | 13 |
2007-05-18 | Perforation | 417.00 | 418.00 | 13 |
2007-05-18 | Perforation | 411.20 | 412.20 | 13 |
2006-10-03 | Perforation | 740.00 | 742.00 | 13 |
2007-05-18 | Perforation | 404.00 | 405.00 | 13 |
2007-05-18 | Perforation | 351.60 | 353.60 | 13 |
2007-05-18 | Perforation | 345.00 | 346.00 | 13 |
2007-05-18 | Perforation | 326.00 | 327.00 | 13 |
2007-05-18 | Perforation | 323.50 | 324.50 | 13 |
2007-05-18 | Perforation | 312.50 | 314.50 | 13 |
2007-05-18 | Perforation | 302.50 | 303.50 | 13 |
2007-05-18 | Perforation | 299.50 | 300.00 | 13 |
2007-05-18 | Perforation | 295.00 | 296.00 | 13 |
2007-05-18 | Perforation | 248.30 | 248.80 | 13 |
2006-10-03 | Perforation | 693.00 | 694.00 | 13 |
2007-05-18 | Perforation | 240.00 | 241.00 | 13 |
2007-05-18 | Perforation | 221.00 | 222.00 | 13 |
2007-05-18 | Perforation | 208.00 | 209.00 | 13 |
2007-06-23 | Fracture | 208.00 | 764.00 | 0 |
2006-10-03 | Perforation | 670.50 | 671.50 | 13 |
2006-10-03 | Perforation | 648.50 | 651.50 | 13 |
2006-10-03 | Perforation | 635.00 | 636.50 | 13 |
2006-10-03 | Perforation | 602.00 | 603.50 | 13 |
2006-10-06 | Fracture | 693.00 | 694.00 | 0 |
2006-10-06 | Fracture | 670.50 | 671.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 840 | 0.0 | 0.0 | 0.0 |
2007 | 4309 | 0.0 | 0.0 | 0.0 |
For data sources see[5]