If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254222814000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.168426,"lon":-113.021982,"icon":""}]} |
Location: 00/14-28-025-22W4/0 | |
Location Alias: 00/14-28-25-22 W4M | |
Location Alias 2: 00/14-28-025-22 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 22 | |
Section: 28 | |
County/Municipality: Wheatland County | |
Well Name: ECA ECOG PFLESH 14-28-25-22 | |
Operator Name: Lynx Energy ULC | |
License Number: 0309906 | |
License Date: 2004-06-08 | |
License Status: Issued | |
Spud Date: 2004-07-25 | |
Final Drill Date: 2004-08-15 | |
Well Total Depth: 906.00 m | |
Surface Hole Latitude: 51.168426 | |
Surface Hole Longitude: -113.021982 |
Date | Event |
---|---|
2004-06-08 | Obtained License |
2004-07-25 | Surface Casing Operation Performed |
2004-08-15 | Finished Drilling |
2004-08-15 | Well Mode changed to Drilled and Cased |
2004-08-16 | Production Casing Operation Performed |
2004-08-16 | Rig Released |
2004-08-20 | Well Log Performed |
2005-01-16 | Perforation Treatment Performed - Jet Perforation |
2005-02-01 | Perforation Treatment Performed - Fractured |
2005-02-07 | Well Fluid changed to Gas |
2005-02-07 | Well Mode changed to Testing |
2005-02-13 | Perforation Treatment Performed - Jet Perforation |
2005-03-02 | Perforation Treatment Performed - Fractured |
2005-03-23 | Perforation Treatment Performed - Jet Perforation |
2005-04-12 | Perforation Treatment Performed - Jet Perforation |
2005-08-08 | Well Began Production |
2005-08-08 | Well Fluid changed to Gas |
2005-08-08 | Well Mode changed to Flowing |
2006-03-05 | Perforation Treatment Performed - Jet Perforation |
2006-03-09 | Perforation Treatment Performed - Fractured |
2006-03-18 | Well Fluid changed to Coalbed Methane-Coals and Other |
2006-03-18 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-01-16 | Perforation | 823.00 | 824.50 | 13 |
2006-03-05 | Perforation | 523.50 | 524.00 | 13 |
2006-03-05 | Perforation | 484.80 | 485.30 | 13 |
2006-03-05 | Perforation | 467.40 | 467.90 | 13 |
2006-03-05 | Perforation | 460.70 | 461.20 | 13 |
2006-03-05 | Perforation | 452.40 | 452.90 | 13 |
2006-03-05 | Perforation | 401.80 | 402.30 | 13 |
2006-03-05 | Perforation | 397.80 | 398.80 | 13 |
2006-03-05 | Perforation | 366.00 | 366.50 | 13 |
2006-03-05 | Perforation | 357.20 | 358.20 | 13 |
2006-03-05 | Perforation | 356.40 | 356.90 | 13 |
2005-01-16 | Perforation | 819.50 | 822.00 | 13 |
2006-03-05 | Perforation | 351.00 | 351.50 | 13 |
2006-03-05 | Perforation | 346.40 | 346.90 | 13 |
2006-03-05 | Perforation | 339.80 | 340.30 | 13 |
2006-03-05 | Perforation | 336.40 | 336.90 | 13 |
2006-03-05 | Perforation | 333.70 | 334.20 | 13 |
2006-03-05 | Perforation | 299.80 | 300.30 | 13 |
2006-03-05 | Perforation | 292.50 | 293.00 | 13 |
2006-03-05 | Perforation | 255.60 | 256.10 | 13 |
2006-03-05 | Perforation | 251.50 | 252.00 | 13 |
2006-03-09 | Fracture | 251.50 | 810.10 | 0 |
2005-01-16 | Perforation | 814.00 | 816.00 | 13 |
2005-02-01 | Fracture | 814.00 | 824.50 | 0 |
2005-02-13 | Perforation | 754.00 | 755.50 | 13 |
2005-03-02 | Fracture | 754.00 | 755.50 | 0 |
2005-03-23 | Perforation | 389.50 | 392.00 | 13 |
2005-04-12 | Perforation | 369.50 | 372.00 | 13 |
2006-03-05 | Perforation | 809.10 | 810.10 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 576 | 0.0 | 0.0 | 0.0 |
2006 | 7500 | 0.0 | 0.0 | 0.0 |
2007 | 8514 | 0.0 | 0.0 | 0.0 |
2008 | 8705 | 0.0 | 0.0 | 0.0 |
2009 | 8631 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 8742 | 0.0 | 0.0 | 0.0 |
2012 | 8728 | 0.0 | 0.0 | 0.0 |
2013 | 8571 | 0.0 | 0.0 | 0.0 |
2014 | 8618 | 0.0 | 0.0 | 0.0 |
2015 | 8726 | 0.0 | 0.0 | 0.0 |
2016 | 8577 | 0.0 | 0.0 | 0.0 |
2017 | 8622 | 0.0 | 0.0 | 0.0 |
2018 | 8705 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]