If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254222803000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.156958,"lon":-113.022131,"icon":""}]} |
Location: 00/03-28-025-22W4/0 | |
Location Alias: 00/03-28-25-22 W4M | |
Location Alias 2: 00/03-28-025-22 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 22 | |
Section: 28 | |
County/Municipality: Wheatland County | |
Well Name: ECA ECOG PARFLESH 3-28-25-22 | |
Operator Name: Lynx Energy ULC | |
License Number: 0407408 | |
License Date: 2009-01-07 | |
License Status: Issued | |
Spud Date: 2009-01-15 | |
Final Drill Date: 2009-01-19 | |
Well Total Depth: 904.00 m | |
Surface Hole Latitude: 51.156958 | |
Surface Hole Longitude: -113.022131 |
Date | Event |
---|---|
2009-01-07 | Obtained License |
2009-01-15 | Surface Casing Operation Performed |
2009-01-19 | Finished Drilling |
2009-01-19 | Well Mode changed to Drilled and Cased |
2009-01-20 | Production Casing Operation Performed |
2009-01-20 | Rig Released |
2009-01-25 | Well Log Performed |
2009-02-06 | Perforation Treatment Performed - Jet Perforation |
2009-02-16 | Perforation Treatment Performed - Fractured |
2009-02-19 | Well Fluid changed to Gas |
2009-02-19 | Well Mode changed to Testing |
2009-03-13 | Well Began Production |
2009-03-13 | Well Fluid changed to Gas |
2009-03-13 | Well Mode changed to Flowing |
2010-06-23 | Perforation Treatment Performed - Jet Perforation |
2010-06-25 | Perforation Treatment Performed - Fractured |
2010-06-28 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-06-28 | Well Mode changed to Flowing |
2010-08-04 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-02-06 | Perforation | 828.00 | 835.00 | 13 |
2009-02-16 | Fracture | 665.00 | 665.50 | 0 |
2009-02-16 | Fracture | 652.00 | 656.00 | 0 |
2010-06-23 | Perforation | 348.40 | 348.90 | 13 |
2010-06-23 | Perforation | 345.00 | 345.50 | 13 |
2010-06-23 | Perforation | 351.80 | 352.30 | 13 |
2010-06-23 | Perforation | 359.60 | 360.10 | 13 |
2010-06-23 | Perforation | 355.30 | 355.80 | 13 |
2010-06-23 | Perforation | 252.40 | 252.90 | 13 |
2010-06-23 | Perforation | 232.20 | 232.70 | 13 |
2010-06-23 | Perforation | 261.00 | 261.50 | 13 |
2009-02-06 | Perforation | 731.00 | 733.00 | 13 |
2010-06-23 | Perforation | 302.40 | 302.90 | 13 |
2010-06-23 | Perforation | 265.50 | 266.00 | 13 |
2010-06-23 | Perforation | 534.50 | 535.00 | 13 |
2010-06-23 | Perforation | 526.50 | 527.00 | 13 |
2010-06-23 | Perforation | 822.40 | 823.40 | 13 |
2010-06-23 | Perforation | 818.50 | 819.00 | 13 |
2010-06-23 | Perforation | 491.00 | 492.00 | 13 |
2010-06-23 | Perforation | 365.80 | 367.80 | 13 |
2010-06-23 | Perforation | 381.50 | 382.00 | 13 |
2010-06-23 | Perforation | 471.00 | 471.60 | 13 |
2009-02-06 | Perforation | 714.00 | 715.00 | 13 |
2010-06-23 | Perforation | 399.00 | 403.00 | 13 |
2010-06-25 | Fracture | 232.20 | 535.00 | 0 |
2010-06-25 | Fracture | 818.50 | 823.40 | 0 |
2009-02-06 | Perforation | 665.00 | 665.50 | 13 |
2009-02-06 | Perforation | 655.00 | 656.00 | 13 |
2009-02-06 | Perforation | 652.00 | 653.50 | 13 |
2009-02-16 | Fracture | 828.00 | 835.00 | 0 |
2009-02-16 | Fracture | 731.00 | 733.00 | 0 |
2009-02-16 | Fracture | 714.00 | 715.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 6962 | 0.0 | 0.0 | 0.0 |
2010 | 8016 | 0.0 | 0.0 | 0.0 |
2011 | 8742 | 0.0 | 0.0 | 0.0 |
2012 | 8728 | 0.0 | 0.0 | 0.0 |
2013 | 8570 | 0.0 | 0.0 | 0.0 |
2014 | 8618 | 0.0 | 0.0 | 0.0 |
2015 | 8726 | 0.0 | 0.0 | 0.0 |
2016 | 8577 | 0.0 | 0.0 | 0.0 |
2017 | 8622 | 0.0 | 0.0 | 0.0 |
2018 | 8705 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]