If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254222510030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.163876,"lon":-112.943603,"icon":""}]} |
Location: 03/10-25-025-22W4/0 | |
Location Alias: 03/10-25-25-22 W4M | |
Location Alias 2: 03/10-25-025-22 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 22 | |
Section: 25 | |
County/Municipality: Wheatland County | |
Well Name: ECA 103 ROCKYFRD 10-25-25-22 | |
Operator Name: Lynx Energy ULC | |
License Number: 0419534 | |
License Date: 2010-04-01 | |
License Status: Issued | |
Spud Date: 2010-07-09 | |
Final Drill Date: 2010-07-28 | |
Well Total Depth: 863.00 m | |
Surface Hole Latitude: 51.163876 | |
Surface Hole Longitude: -112.943603 |
Date | Event |
---|---|
2010-04-01 | Obtained License |
2010-07-09 | Surface Casing Operation Performed |
2010-07-28 | Finished Drilling |
2010-07-28 | Production Casing Operation Performed |
2010-07-28 | Rig Released |
2010-07-28 | Well Mode changed to Drilled and Cased |
2010-08-05 | Well Log Performed |
2010-08-22 | Perforation Treatment Performed - Jet Perforation |
2010-08-22 | Well Log Performed |
2010-11-03 | Perforation Treatment Performed - Jet Perforation |
2010-11-06 | Perforation Treatment Performed - Fractured |
2010-11-25 | Well Began Production |
2010-11-25 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-11-25 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-08-22 | Perforation | 791.50 | 793.00 | 13 |
2010-11-03 | Perforation | 350.60 | 351.10 | 13 |
2010-11-03 | Perforation | 348.00 | 349.00 | 13 |
2010-11-03 | Perforation | 342.20 | 342.70 | 13 |
2010-11-03 | Perforation | 324.20 | 324.70 | 13 |
2010-11-03 | Perforation | 217.50 | 218.00 | 13 |
2010-11-03 | Perforation | 186.30 | 186.80 | 13 |
2010-11-03 | Perforation | 360.00 | 362.00 | 13 |
2010-11-03 | Perforation | 234.20 | 234.70 | 13 |
2010-11-03 | Perforation | 320.00 | 321.00 | 13 |
2010-11-03 | Perforation | 280.50 | 281.00 | 13 |
2010-08-22 | Perforation | 769.00 | 770.00 | 13 |
2010-11-03 | Perforation | 269.00 | 269.50 | 13 |
2010-11-03 | Perforation | 373.60 | 374.10 | 13 |
2010-11-03 | Perforation | 749.80 | 750.30 | 13 |
2010-11-03 | Perforation | 628.50 | 629.00 | 13 |
2010-11-03 | Perforation | 623.50 | 624.00 | 13 |
2010-11-03 | Perforation | 758.80 | 759.30 | 13 |
2010-11-03 | Perforation | 787.90 | 788.90 | 13 |
2010-11-03 | Perforation | 782.30 | 782.80 | 13 |
2010-11-03 | Perforation | 779.00 | 779.50 | 13 |
2010-11-03 | Perforation | 439.50 | 443.50 | 13 |
2010-08-22 | Perforation | 712.00 | 714.00 | 13 |
2010-11-03 | Perforation | 461.70 | 462.20 | 13 |
2010-11-03 | Perforation | 424.70 | 425.20 | 13 |
2010-11-03 | Perforation | 429.00 | 430.00 | 13 |
2010-11-03 | Perforation | 502.50 | 503.00 | 13 |
2010-11-03 | Perforation | 506.00 | 506.50 | 13 |
2010-11-03 | Perforation | 463.20 | 463.70 | 13 |
2010-11-06 | Fracture | 360.00 | 362.00 | 0 |
2010-11-06 | Fracture | 749.80 | 788.90 | 0 |
2010-11-06 | Fracture | 186.30 | 629.00 | 0 |
2010-08-22 | Perforation | 708.00 | 710.00 | 13 |
2010-08-22 | Perforation | 679.00 | 681.00 | 13 |
2010-11-03 | Perforation | 337.50 | 338.00 | 13 |
2010-11-03 | Perforation | 332.60 | 333.10 | 13 |
2010-11-03 | Perforation | 327.00 | 329.00 | 13 |
2010-11-03 | Perforation | 339.10 | 340.10 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 888 | 0.0 | 0.0 | 0.0 |
2011 | 8700 | 0.0 | 0.0 | 0.0 |
2012 | 8760 | 0.0 | 0.0 | 0.0 |
2013 | 8605 | 0.0 | 0.0 | 0.0 |
2014 | 8550 | 0.0 | 0.0 | 0.0 |
2015 | 8666 | 0.0 | 0.0 | 0.0 |
2016 | 8675 | 0.0 | 0.0 | 0.0 |
2017 | 8521 | 0.0 | 0.0 | 0.0 |
2018 | 8496 | 0.0 | 0.0 | 0.0 |
2019 | 8742 | 0.0 | 0.0 | 0.0 |
2020 | 1998 | 0.0 | 0.0 | 0.0 |
For data sources see[5]