If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254222416000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.151884,"lon":-112.937501,"icon":""}]} |
Location: 00/16-24-025-22W4/0 | |
Location Alias: 00/16-24-25-22 W4M | |
Location Alias 2: 00/16-24-025-22 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 22 | |
Section: 24 | |
County/Municipality: Wheatland County | |
Well Name: ECA ECOG PFLESH 16-24-25-22 | |
Operator Name: Lynx Energy ULC | |
License Number: 0314574 | |
License Date: 2004-09-09 | |
License Status: Suspension | |
Spud Date: 2004-10-01 | |
Final Drill Date: 2004-10-14 | |
Well Total Depth: 1574.00 m | |
Surface Hole Latitude: 51.151884 | |
Surface Hole Longitude: -112.937501 |
Date | Event |
---|---|
2004-09-09 | Obtained License |
2004-10-02 | Lost Circulation Occurred |
2004-10-02 | Surface Casing Operation Performed |
2004-10-14 | Finished Drilling |
2004-10-14 | Lost Circulation Occurred |
2004-10-14 | Production Casing Operation Performed |
2004-10-14 | Rig Released |
2004-10-14 | Well Log Performed |
2004-10-14 | Well Mode changed to Drilled and Cased |
2005-01-08 | Perforation Treatment Performed - Jet Perforation |
2005-01-08 | Well Log Performed |
2005-02-17 | Perforation Treatment Performed - Fractured |
2005-03-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-03-01 | Perforation Treatment Performed - Jet Perforation |
2005-03-01 | Plug Back Performed |
2005-03-01 | Well Log Performed |
2005-03-01 | Well Mode changed to Abandoned Zone |
2005-03-20 | Perforation Treatment Performed - Jet Perforation |
2005-03-20 | Well Log Performed |
2005-04-22 | Perforation Treatment Performed - Fractured |
2011-02-14 | Perforation Treatment Performed - Jet Perforation |
2011-02-14 | Well Log Performed |
2011-06-14 | Perforation Treatment Performed - Jet Perforation |
2011-06-25 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-01-08 | Perforation | 1501.00 | 1502.50 | 17 |
2011-06-14 | Perforation | 315.40 | 316.40 | 13 |
2011-06-14 | Perforation | 334.50 | 336.50 | 13 |
2011-06-14 | Perforation | 306.00 | 307.00 | 13 |
2011-06-14 | Perforation | 295.50 | 296.50 | 13 |
2011-06-14 | Perforation | 300.60 | 301.10 | 13 |
2011-06-14 | Perforation | 466.10 | 466.60 | 13 |
2011-06-14 | Perforation | 480.60 | 481.10 | 13 |
2011-06-14 | Perforation | 406.70 | 407.20 | 13 |
2011-06-14 | Perforation | 392.20 | 392.70 | 13 |
2011-06-14 | Perforation | 401.00 | 401.50 | 13 |
2005-02-17 | Fracture | 1501.00 | 1502.50 | 0 |
2011-06-14 | Perforation | 290.40 | 290.90 | 13 |
2011-06-14 | Perforation | 183.10 | 183.60 | 13 |
2011-06-14 | Perforation | 186.90 | 187.90 | 13 |
2011-06-14 | Perforation | 745.20 | 746.20 | 13 |
2011-06-14 | Perforation | 752.00 | 753.00 | 13 |
2011-06-14 | Perforation | 199.00 | 200.00 | 13 |
2011-06-14 | Perforation | 284.00 | 284.50 | 13 |
2011-06-14 | Perforation | 286.80 | 287.30 | 13 |
2011-06-14 | Perforation | 246.70 | 247.70 | 13 |
2011-06-14 | Perforation | 237.70 | 238.20 | 13 |
2005-03-01 | Packing Device Capped w/Cement | 1488.00 | 1496.00 | 0 |
2011-06-25 | Fracture | 466.10 | 481.10 | 0 |
2011-06-25 | Fracture | 237.70 | 407.20 | 0 |
2011-06-25 | Fracture | 745.20 | 753.00 | 0 |
2005-03-01 | Perforation | 1309.50 | 1311.50 | 13 |
2005-03-20 | Perforation | 931.50 | 935.00 | 14 |
2005-04-22 | Fracture | 931.50 | 935.00 | 0 |
2011-02-14 | Perforation | 757.00 | 760.00 | 13 |
2011-02-14 | Perforation | 659.10 | 660.10 | 13 |
2011-02-14 | Perforation | 640.60 | 641.60 | 13 |
For data sources see[4]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2004-10-02 | Lost Circulation | 40.00 | 164.00 |
2004-10-14 | Lost Circulation | 1573.00 | 1573.00 |
For data sources see[5]