If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254222208000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.148586,"lon":-112.978612,"icon":""}]} |
Location: 00/08-22-025-22W4/0 | |
Location Alias: 00/08-22-25-22 W4M | |
Location Alias 2: 00/08-22-025-22 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 22 | |
Section: 22 | |
County/Municipality: Wheatland County | |
Well Name: ECA ECOG PARFLESH 8-22-25-22 | |
Operator Name: Lynx Energy ULC | |
License Number: 0411102 | |
License Date: 2009-06-25 | |
License Status: Amended | |
Spud Date: 2010-01-23 | |
Final Drill Date: 2010-02-10 | |
Well Total Depth: 839.00 m | |
Surface Hole Latitude: 51.148586 | |
Surface Hole Longitude: -112.978612 |
Date | Event |
---|---|
2009-06-25 | Obtained License |
2010-01-23 | Lost Circulation Occurred |
2010-01-23 | Surface Casing Operation Performed |
2010-02-10 | Direction Drilling Operation Performed - Deviate |
2010-02-10 | Finished Drilling |
2010-02-10 | Well Mode changed to Drilled and Cased |
2010-02-16 | Production Casing Operation Performed |
2010-02-16 | Rig Released |
2010-02-21 | Well Log Performed |
2010-05-16 | Perforation Treatment Performed - Jet Perforation |
2010-06-25 | Perforation Treatment Performed - Fractured |
2010-06-29 | Well Fluid changed to Gas |
2010-06-29 | Well Mode changed to Testing |
2010-06-30 | Well Began Production |
2010-06-30 | Well Fluid changed to Gas |
2010-06-30 | Well Mode changed to Flowing |
2010-12-29 | Perforation Treatment Performed - Jet Perforation |
2011-02-23 | Perforation Treatment Performed - Fractured |
2011-03-07 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-03-07 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-02-10 | 180.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-05-16 | Perforation | 757.00 | 760.00 | 13 |
2010-06-25 | Fracture | 433.00 | 436.00 | 0 |
2010-12-29 | Perforation | 310.90 | 311.90 | 13 |
2010-12-29 | Perforation | 314.80 | 315.30 | 13 |
2010-12-29 | Perforation | 299.50 | 300.00 | 13 |
2010-12-29 | Perforation | 302.90 | 303.90 | 13 |
2010-12-29 | Perforation | 334.80 | 335.80 | 13 |
2010-12-29 | Perforation | 337.00 | 339.00 | 13 |
2010-12-29 | Perforation | 320.10 | 323.10 | 13 |
2010-12-29 | Perforation | 331.60 | 332.60 | 13 |
2010-12-29 | Perforation | 295.60 | 296.10 | 13 |
2010-05-16 | Perforation | 729.00 | 733.50 | 13 |
2010-12-29 | Perforation | 196.60 | 197.60 | 13 |
2010-12-29 | Perforation | 209.00 | 210.00 | 13 |
2010-12-29 | Perforation | 341.50 | 343.50 | 13 |
2010-12-29 | Perforation | 349.00 | 350.00 | 13 |
2010-12-29 | Perforation | 259.80 | 260.30 | 13 |
2010-12-29 | Perforation | 284.00 | 284.50 | 13 |
2010-12-29 | Perforation | 213.60 | 214.10 | 13 |
2010-12-29 | Perforation | 251.30 | 252.30 | 13 |
2010-12-29 | Perforation | 352.90 | 354.90 | 13 |
2010-12-29 | Perforation | 673.80 | 674.80 | 13 |
2010-05-16 | Perforation | 726.00 | 727.00 | 13 |
2010-12-29 | Perforation | 685.30 | 685.80 | 13 |
2010-12-29 | Perforation | 659.00 | 660.00 | 13 |
2010-12-29 | Perforation | 669.50 | 670.00 | 13 |
2010-12-29 | Perforation | 701.00 | 703.00 | 13 |
2010-12-29 | Perforation | 711.70 | 712.70 | 13 |
2010-12-29 | Perforation | 693.00 | 694.00 | 13 |
2010-12-29 | Perforation | 699.10 | 699.60 | 13 |
2010-12-29 | Perforation | 635.90 | 636.40 | 13 |
2010-12-29 | Perforation | 459.90 | 460.90 | 13 |
2010-12-29 | Perforation | 502.00 | 502.50 | 13 |
2010-05-16 | Perforation | 647.50 | 648.50 | 13 |
2010-12-29 | Perforation | 418.30 | 419.30 | 13 |
2010-12-29 | Perforation | 436.50 | 437.00 | 13 |
2010-12-29 | Perforation | 630.70 | 631.20 | 13 |
2010-12-29 | Perforation | 521.20 | 522.20 | 13 |
2010-12-29 | Perforation | 505.70 | 506.70 | 13 |
2010-12-29 | Perforation | 510.70 | 511.70 | 13 |
2011-02-23 | Fracture | 341.50 | 350.00 | 0 |
2011-02-23 | Fracture | 209.00 | 712.70 | 0 |
2010-05-16 | Perforation | 642.00 | 644.00 | 13 |
2010-05-16 | Perforation | 433.00 | 436.00 | 13 |
2010-06-25 | Fracture | 757.00 | 760.00 | 0 |
2010-06-25 | Fracture | 726.00 | 733.50 | 0 |
2010-06-25 | Fracture | 642.00 | 648.50 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 4425 | 0.0 | 0.0 | 0.0 |
2011 | 8757 | 0.0 | 0.0 | 0.0 |
2012 | 8566 | 0.0 | 0.0 | 0.0 |
2013 | 8640 | 0.0 | 0.0 | 0.0 |
2014 | 8708 | 0.0 | 0.0 | 0.0 |
2015 | 8740 | 0.0 | 0.0 | 0.0 |
2016 | 8720 | 0.0 | 0.0 | 0.0 |
2017 | 8683 | 0.0 | 0.0 | 0.0 |
2018 | 8749 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2010-01-23 | Lost Circulation | 28.00 | 48.00 |
For data sources see[7]