If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254221816000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.137385,"lon":-113.057081,"icon":""}]} |
Location: 00/16-18-025-22W4/0 | |
Location Alias: 00/16-18-25-22 W4M | |
Location Alias 2: 00/16-18-025-22 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 22 | |
Section: 18 | |
County/Municipality: Wheatland County | |
Well Name: ECA ECOG PARFLESH 16-18-25-22 | |
Operator Name: Lynx Energy ULC | |
License Number: 0410883 | |
License Date: 2009-06-10 | |
License Status: Issued | |
Spud Date: 2009-09-03 | |
Final Drill Date: 2009-09-21 | |
Well Total Depth: 853.00 m | |
Surface Hole Latitude: 51.137385 | |
Surface Hole Longitude: -113.057081 |
Date | Event |
---|---|
2009-06-10 | Obtained License |
2009-09-04 | Surface Casing Operation Performed |
2009-09-21 | Finished Drilling |
2009-09-21 | Production Casing Operation Performed |
2009-09-21 | Rig Released |
2009-09-21 | Well Mode changed to Drilled and Cased |
2009-09-28 | Well Log Performed |
2009-10-14 | Perforation Treatment Performed - Jet Perforation |
2009-10-29 | Perforation Treatment Performed - Fractured |
2009-11-01 | Well Fluid changed to Gas |
2009-11-01 | Well Mode changed to Testing |
2009-11-05 | Well Began Production |
2009-11-05 | Well Fluid changed to Gas |
2009-11-05 | Well Mode changed to Flowing |
2010-05-03 | Perforation Treatment Performed - Jet Perforation |
2010-05-17 | Perforation Treatment Performed - Fractured |
2010-05-20 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-05-20 | Well Mode changed to Flowing |
2010-07-01 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-10-14 | Perforation | 777.00 | 781.00 | 13 |
2009-10-14 | Perforation | 617.00 | 619.00 | 13 |
2009-10-14 | Perforation | 600.00 | 601.00 | 13 |
2009-10-29 | Fracture | 777.00 | 781.00 | 0 |
2009-10-29 | Fracture | 756.00 | 757.00 | 0 |
2009-10-29 | Fracture | 730.50 | 731.50 | 0 |
2009-10-29 | Fracture | 712.00 | 719.00 | 0 |
2009-10-29 | Fracture | 698.00 | 699.50 | 0 |
2009-10-29 | Fracture | 670.00 | 671.50 | 0 |
2009-10-29 | Fracture | 649.00 | 654.50 | 0 |
2009-10-29 | Fracture | 617.00 | 619.00 | 0 |
2009-10-14 | Perforation | 756.00 | 757.00 | 13 |
2009-10-29 | Fracture | 600.00 | 601.00 | 0 |
2010-05-03 | Perforation | 252.70 | 253.70 | 13 |
2010-05-03 | Perforation | 212.90 | 213.40 | 13 |
2010-05-03 | Perforation | 298.50 | 299.00 | 13 |
2010-05-03 | Perforation | 295.00 | 296.00 | 13 |
2010-05-03 | Perforation | 208.90 | 209.40 | 13 |
2010-05-03 | Perforation | 768.70 | 769.20 | 13 |
2010-05-03 | Perforation | 766.20 | 766.70 | 13 |
2010-05-03 | Perforation | 190.50 | 191.00 | 13 |
2010-05-03 | Perforation | 773.20 | 773.70 | 13 |
2009-10-14 | Perforation | 730.50 | 731.50 | 13 |
2010-05-03 | Perforation | 415.50 | 416.50 | 13 |
2010-05-03 | Perforation | 352.00 | 355.00 | 13 |
2010-05-03 | Perforation | 478.30 | 478.80 | 13 |
2010-05-03 | Perforation | 437.30 | 438.30 | 13 |
2010-05-03 | Perforation | 350.00 | 351.00 | 13 |
2010-05-03 | Perforation | 312.40 | 313.40 | 13 |
2010-05-03 | Perforation | 302.00 | 304.00 | 13 |
2010-05-03 | Perforation | 325.40 | 327.40 | 13 |
2010-05-03 | Perforation | 330.00 | 330.50 | 13 |
2010-05-17 | Fracture | 766.20 | 773.70 | 0 |
2009-10-14 | Perforation | 718.00 | 719.00 | 13 |
2010-05-17 | Fracture | 208.90 | 478.80 | 0 |
2009-10-14 | Perforation | 712.00 | 714.00 | 13 |
2009-10-14 | Perforation | 698.00 | 699.50 | 13 |
2009-10-14 | Perforation | 670.00 | 671.50 | 13 |
2009-10-14 | Perforation | 653.00 | 654.50 | 13 |
2009-10-14 | Perforation | 649.00 | 651.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 1368 | 0.0 | 0.0 | 0.0 |
2010 | 8063 | 0.0 | 0.0 | 0.0 |
2011 | 8759 | 0.0 | 0.0 | 0.0 |
2012 | 8771 | 0.0 | 0.0 | 0.0 |
2013 | 8709 | 0.0 | 0.0 | 0.0 |
2014 | 8721 | 0.0 | 0.0 | 0.0 |
2015 | 8605 | 0.0 | 0.0 | 0.0 |
2016 | 8687 | 0.0 | 0.0 | 0.0 |
2017 | 8577 | 0.0 | 0.0 | 0.0 |
2018 | 8748 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]