If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254221801000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.127623,"lon":-113.052256,"icon":""}]} |
Location: 00/01-18-025-22W4/0 | |
Location Alias: 00/01-18-25-22 W4M | |
Location Alias 2: 00/01-18-025-22 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 22 | |
Section: 18 | |
County/Municipality: Wheatland County | |
Well Name: ECA ECOG PARFLESH 1-18-25-22 | |
Operator Name: Lynx Energy ULC | |
License Number: 0410720 | |
License Date: 2009-06-01 | |
License Status: Issued | |
Spud Date: 2009-09-03 | |
Final Drill Date: 2009-09-19 | |
Well Total Depth: 832.00 m | |
Surface Hole Latitude: 51.127623 | |
Surface Hole Longitude: -113.052256 |
Date | Event |
---|---|
2009-06-01 | Obtained License |
2009-09-03 | Surface Casing Operation Performed |
2009-09-19 | Finished Drilling |
2009-09-19 | Production Casing Operation Performed |
2009-09-19 | Rig Released |
2009-09-19 | Well Mode changed to Drilled and Cased |
2009-09-28 | Well Log Performed |
2009-10-13 | Perforation Treatment Performed - Jet Perforation |
2009-10-26 | Perforation Treatment Performed - Fractured |
2009-10-31 | Well Fluid changed to Gas |
2009-10-31 | Well Mode changed to Testing |
2009-11-03 | Well Began Production |
2009-11-03 | Well Fluid changed to Gas |
2009-11-03 | Well Mode changed to Flowing |
2015-05-09 | Perforation Treatment Performed - Jet Perforation |
2015-05-12 | Well Fluid changed to Coalbed Methane-Coals and Other |
2015-05-12 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-10-13 | Perforation | 760.00 | 761.00 | 13 |
2009-10-13 | Perforation | 638.00 | 639.00 | 13 |
2009-10-13 | Perforation | 621.00 | 622.00 | 13 |
2009-10-13 | Perforation | 610.00 | 612.00 | 13 |
2009-10-13 | Perforation | 607.00 | 608.00 | 13 |
2009-10-13 | Perforation | 598.00 | 600.00 | 13 |
2009-10-13 | Perforation | 596.00 | 597.00 | 13 |
2009-10-26 | Fracture | 753.00 | 756.50 | 0 |
2009-10-26 | Fracture | 725.50 | 730.50 | 0 |
2009-10-26 | Fracture | 699.00 | 707.00 | 0 |
2009-10-26 | Fracture | 647.00 | 654.50 | 0 |
2009-10-13 | Perforation | 755.00 | 756.50 | 13 |
2009-10-26 | Fracture | 638.00 | 639.00 | 0 |
2009-10-26 | Fracture | 621.00 | 622.00 | 0 |
2009-10-26 | Fracture | 607.00 | 612.00 | 0 |
2009-10-26 | Fracture | 596.00 | 600.00 | 0 |
2015-05-09 | Perforation | 182.00 | 183.00 | 13 |
2015-05-09 | Perforation | 188.00 | 189.00 | 13 |
2015-05-09 | Perforation | 198.00 | 199.00 | 13 |
2015-05-09 | Perforation | 202.50 | 203.50 | 13 |
2015-05-09 | Perforation | 244.00 | 245.00 | 13 |
2015-05-09 | Perforation | 286.00 | 287.00 | 13 |
2009-10-13 | Perforation | 753.00 | 754.00 | 13 |
2015-05-09 | Perforation | 294.00 | 295.00 | 13 |
2015-05-09 | Perforation | 302.00 | 304.00 | 13 |
2015-05-09 | Perforation | 314.50 | 315.00 | 13 |
2015-05-09 | Perforation | 317.00 | 318.00 | 13 |
2015-05-09 | Perforation | 337.50 | 341.00 | 13 |
2015-05-09 | Perforation | 391.00 | 392.00 | 13 |
2015-05-09 | Perforation | 405.00 | 406.00 | 13 |
2015-05-09 | Perforation | 428.00 | 429.00 | 13 |
2015-05-09 | Perforation | 467.00 | 468.00 | 13 |
2015-05-09 | Perforation | 473.50 | 474.50 | 13 |
2009-10-13 | Perforation | 729.50 | 730.50 | 13 |
2009-10-13 | Perforation | 725.50 | 727.50 | 13 |
2009-10-13 | Perforation | 704.00 | 707.00 | 13 |
2009-10-13 | Perforation | 699.00 | 701.50 | 13 |
2009-10-13 | Perforation | 652.00 | 654.50 | 13 |
2009-10-13 | Perforation | 647.00 | 648.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 1416 | 0.0 | 0.0 | 0.0 |
2010 | 8063 | 0.0 | 0.0 | 0.0 |
2011 | 8759 | 0.0 | 0.0 | 0.0 |
2012 | 8775 | 0.0 | 0.0 | 0.0 |
2013 | 8709 | 0.0 | 0.0 | 0.0 |
2014 | 8721 | 0.0 | 0.0 | 0.0 |
2015 | 8606 | 0.0 | 0.0 | 0.0 |
2016 | 8687 | 0.0 | 0.0 | 0.0 |
2017 | 8577 | 0.0 | 0.0 | 0.0 |
2018 | 8748 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2015-05-10 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]