X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254221504022

Well Details

Well ID: 0254221504022
Loading map...
Location: 02/04-15-025-22W4/2
Location Alias: 02/04-15-25-22 W4M
Location Alias 2: 02/04-15-025-22 W4/02
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 22
Section: 15
County/Municipality: Wheatland County
Well Name: ECA ECOG 102 PARFLESH 4-15-25-22
Operator Name: Lynx Energy ULC
License Number: 0412606
License Date: 2009-09-25
License Status: Issued
Spud Date: 2010-01-20
Final Drill Date: 2010-02-11
Well Total Depth: 776.00 m
Surface Hole Latitude: 51.127562
Surface Hole Longitude: -113.000380

For data sources see[1][2]

Well History

Date Event
2009-09-25 Obtained License
2010-01-20 Surface Casing Operation Performed
2010-02-11 Finished Drilling
2010-02-11 Production Casing Operation Performed
2010-02-11 Rig Released
2010-02-11 Well Mode changed to Drilled and Cased
2010-02-19 Well Log Performed
2010-03-06 Perforation Treatment Performed - Jet Perforation
2010-05-19 Perforation Treatment Performed - Fractured
2011-05-20 Perforation Treatment Performed - Jet Perforation
2011-06-02 Perforation Treatment Performed - Fractured
2011-06-10 Well Began Production
2011-06-10 Well Fluid changed to Coalbed Methane-Coals and Other
2011-06-10 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-03-06 Perforation 627.20 628.20 13
2010-05-19 Fracture 566.40 567.40 0
2011-05-20 Perforation 236.50 238.50 13
2011-05-20 Perforation 232.90 233.40 13
2011-05-20 Perforation 228.00 230.00 13
2011-05-20 Perforation 285.10 285.60 13
2011-05-20 Perforation 282.10 284.10 13
2011-05-20 Perforation 255.50 257.50 13
2011-05-20 Perforation 265.00 268.00 13
2011-05-20 Perforation 252.60 253.60 13
2011-05-20 Perforation 248.00 251.00 13
2010-03-06 Perforation 614.00 616.00 13
2011-05-20 Perforation 225.10 226.10 13
2011-05-20 Perforation 221.00 222.00 13
2011-05-20 Perforation 271.00 272.00 13
2011-05-20 Perforation 688.20 688.70 13
2011-05-20 Perforation 685.50 686.00 13
2011-05-20 Perforation 683.30 684.30 13
2011-05-20 Perforation 698.40 699.40 13
2011-05-20 Perforation 693.70 694.70 13
2011-05-20 Perforation 690.90 691.40 13
2011-05-20 Perforation 347.80 348.80 13
2010-03-06 Perforation 602.30 604.30 13
2011-05-20 Perforation 366.20 367.20 13
2011-05-20 Perforation 405.60 406.60 13
2011-05-20 Perforation 409.10 409.60 13
2011-05-20 Perforation 411.70 412.70 13
2011-06-02 Fracture 248.00 272.00 0
2011-06-02 Fracture 405.60 412.70 0
2011-06-02 Fracture 221.00 367.20 0
2011-06-02 Fracture 683.30 699.40 0
2010-03-06 Perforation 576.50 578.00 13
2010-03-06 Perforation 566.40 567.40 13
2010-05-19 Fracture 627.20 628.20 0
2010-05-19 Fracture 614.00 616.00 0
2010-05-19 Fracture 602.30 604.30 0
2010-05-19 Fracture 576.50 578.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 4916 0.0 0.0 0.0
2012 8737 0.0 0.0 0.0
2013 8673 0.0 0.0 0.0
2014 8688 0.0 0.0 0.0
2015 8734 0.0 0.0 0.0
2016 8701 0.0 0.0 0.0
2017 8672 0.0 0.0 0.0
2018 8746 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References