X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254221402000

Well Details

Well ID: 0254221402000
Loading map...
Location: 00/02-14-025-22W4/0
Location Alias: 00/02-14-25-22 W4M
Location Alias 2: 00/02-14-025-22 W4/00
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 22
Section: 14
County/Municipality: Wheatland County
Well Name: ECA ECOG PARFLESH 2-14-25-22
Operator Name: Lynx Energy ULC
License Number: 0410338
License Date: 2009-05-04
License Status: Issued
Spud Date: 2009-08-26
Final Drill Date: 2009-10-07
Well Total Depth: 767.00 m
Surface Hole Latitude: 51.127554
Surface Hole Longitude: -112.969413

For data sources see[1][2]

Well History

Date Event
2009-05-04 Obtained License
2009-08-26 Surface Casing Operation Performed
2009-10-07 Finished Drilling
2009-10-07 Well Mode changed to Drilled and Cased
2009-10-08 Production Casing Operation Performed
2009-10-08 Rig Released
2009-10-12 Well Log Performed
2009-10-30 Perforation Treatment Performed - Jet Perforation
2009-11-06 Perforation Treatment Performed - Fractured
2009-11-09 Well Fluid changed to Gas
2009-11-09 Well Mode changed to Testing
2009-12-10 Well Began Production
2009-12-10 Well Fluid changed to Gas
2009-12-10 Well Mode changed to Flowing
2010-05-19 Perforation Treatment Performed - Jet Perforation
2010-05-20 Perforation Treatment Performed - Fractured
2010-05-26 Well Fluid changed to Coalbed Methane-Coals and Other
2010-05-26 Well Mode changed to Flowing
2010-07-02 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-10-30 Perforation 694.00 697.00 13
2009-10-30 Perforation 260.50 261.50 13
2009-11-06 Fracture 694.00 697.00 0
2009-11-06 Fracture 650.00 653.00 0
2009-11-06 Fracture 618.00 623.50 0
2009-11-06 Fracture 578.50 580.00 0
2009-11-06 Fracture 564.00 568.50 0
2009-11-06 Fracture 534.00 535.00 0
2009-11-06 Fracture 271.50 273.00 0
2009-11-06 Fracture 260.50 261.50 0
2010-05-19 Perforation 211.90 212.40 13
2009-10-30 Perforation 650.00 653.00 13
2010-05-19 Perforation 221.30 222.30 13
2010-05-19 Perforation 225.50 226.00 13
2010-05-19 Perforation 687.00 688.00 13
2010-05-19 Perforation 691.00 692.00 13
2010-05-19 Perforation 203.90 204.40 13
2010-05-19 Perforation 230.00 232.00 13
2010-05-19 Perforation 357.50 358.50 13
2010-05-19 Perforation 400.00 400.50 13
2010-05-19 Perforation 527.00 528.00 13
2010-05-19 Perforation 263.50 265.50 13
2009-10-30 Perforation 621.00 623.50 13
2010-05-19 Perforation 242.00 242.50 13
2010-05-19 Perforation 336.50 337.00 13
2010-05-20 Fracture 687.00 692.00 0
2010-05-20 Fracture 211.90 528.00 0
2009-10-30 Perforation 618.00 619.00 13
2009-10-30 Perforation 578.50 580.00 13
2009-10-30 Perforation 566.50 568.50 13
2009-10-30 Perforation 564.00 565.00 13
2009-10-30 Perforation 534.00 535.00 13
2009-10-30 Perforation 271.50 273.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 513 0.0 0.0 0.0
2010 8740 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8566 0.0 0.0 0.0
2013 8640 0.0 0.0 0.0
2014 8708 0.0 0.0 0.0
2015 8740 0.0 0.0 0.0
2016 8720 0.0 0.0 0.0
2017 8683 0.0 0.0 0.0
2018 8749 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References