If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254221402000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.127554,"lon":-112.969413,"icon":""}]} |
Location: 00/02-14-025-22W4/0 | |
Location Alias: 00/02-14-25-22 W4M | |
Location Alias 2: 00/02-14-025-22 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 22 | |
Section: 14 | |
County/Municipality: Wheatland County | |
Well Name: ECA ECOG PARFLESH 2-14-25-22 | |
Operator Name: Lynx Energy ULC | |
License Number: 0410338 | |
License Date: 2009-05-04 | |
License Status: Issued | |
Spud Date: 2009-08-26 | |
Final Drill Date: 2009-10-07 | |
Well Total Depth: 767.00 m | |
Surface Hole Latitude: 51.127554 | |
Surface Hole Longitude: -112.969413 |
Date | Event |
---|---|
2009-05-04 | Obtained License |
2009-08-26 | Surface Casing Operation Performed |
2009-10-07 | Finished Drilling |
2009-10-07 | Well Mode changed to Drilled and Cased |
2009-10-08 | Production Casing Operation Performed |
2009-10-08 | Rig Released |
2009-10-12 | Well Log Performed |
2009-10-30 | Perforation Treatment Performed - Jet Perforation |
2009-11-06 | Perforation Treatment Performed - Fractured |
2009-11-09 | Well Fluid changed to Gas |
2009-11-09 | Well Mode changed to Testing |
2009-12-10 | Well Began Production |
2009-12-10 | Well Fluid changed to Gas |
2009-12-10 | Well Mode changed to Flowing |
2010-05-19 | Perforation Treatment Performed - Jet Perforation |
2010-05-20 | Perforation Treatment Performed - Fractured |
2010-05-26 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-05-26 | Well Mode changed to Flowing |
2010-07-02 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-10-30 | Perforation | 694.00 | 697.00 | 13 |
2009-10-30 | Perforation | 260.50 | 261.50 | 13 |
2009-11-06 | Fracture | 694.00 | 697.00 | 0 |
2009-11-06 | Fracture | 650.00 | 653.00 | 0 |
2009-11-06 | Fracture | 618.00 | 623.50 | 0 |
2009-11-06 | Fracture | 578.50 | 580.00 | 0 |
2009-11-06 | Fracture | 564.00 | 568.50 | 0 |
2009-11-06 | Fracture | 534.00 | 535.00 | 0 |
2009-11-06 | Fracture | 271.50 | 273.00 | 0 |
2009-11-06 | Fracture | 260.50 | 261.50 | 0 |
2010-05-19 | Perforation | 211.90 | 212.40 | 13 |
2009-10-30 | Perforation | 650.00 | 653.00 | 13 |
2010-05-19 | Perforation | 221.30 | 222.30 | 13 |
2010-05-19 | Perforation | 225.50 | 226.00 | 13 |
2010-05-19 | Perforation | 687.00 | 688.00 | 13 |
2010-05-19 | Perforation | 691.00 | 692.00 | 13 |
2010-05-19 | Perforation | 203.90 | 204.40 | 13 |
2010-05-19 | Perforation | 230.00 | 232.00 | 13 |
2010-05-19 | Perforation | 357.50 | 358.50 | 13 |
2010-05-19 | Perforation | 400.00 | 400.50 | 13 |
2010-05-19 | Perforation | 527.00 | 528.00 | 13 |
2010-05-19 | Perforation | 263.50 | 265.50 | 13 |
2009-10-30 | Perforation | 621.00 | 623.50 | 13 |
2010-05-19 | Perforation | 242.00 | 242.50 | 13 |
2010-05-19 | Perforation | 336.50 | 337.00 | 13 |
2010-05-20 | Fracture | 687.00 | 692.00 | 0 |
2010-05-20 | Fracture | 211.90 | 528.00 | 0 |
2009-10-30 | Perforation | 618.00 | 619.00 | 13 |
2009-10-30 | Perforation | 578.50 | 580.00 | 13 |
2009-10-30 | Perforation | 566.50 | 568.50 | 13 |
2009-10-30 | Perforation | 564.00 | 565.00 | 13 |
2009-10-30 | Perforation | 534.00 | 535.00 | 13 |
2009-10-30 | Perforation | 271.50 | 273.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 513 | 0.0 | 0.0 | 0.0 |
2010 | 8740 | 0.0 | 0.0 | 0.0 |
2011 | 8759 | 0.0 | 0.0 | 0.0 |
2012 | 8566 | 0.0 | 0.0 | 0.0 |
2013 | 8640 | 0.0 | 0.0 | 0.0 |
2014 | 8708 | 0.0 | 0.0 | 0.0 |
2015 | 8740 | 0.0 | 0.0 | 0.0 |
2016 | 8720 | 0.0 | 0.0 | 0.0 |
2017 | 8683 | 0.0 | 0.0 | 0.0 |
2018 | 8749 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]