X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254220711000

Well Details

Well ID: 0254220711000
Loading map...
Location: 00/11-07-025-22W4/0
Location Alias: 00/11-07-25-22 W4M
Location Alias 2: 00/11-07-025-22 W4/00
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 22
Section: 07
County/Municipality: Wheatland County
Well Name: ECA ECOG PARFLESH 11-7-25-22
Operator Name: Lynx Energy ULC
License Number: 0410391
License Date: 2009-05-07
License Status: Issued
Spud Date: 2009-09-09
Final Drill Date: 2009-09-18
Well Total Depth: 814.00 m
Surface Hole Latitude: 51.120282
Surface Hole Longitude: -113.066379

For data sources see[1][2]

Well History

Date Event
2009-05-07 Obtained License
2009-09-09 Surface Casing Operation Performed
2009-09-18 Finished Drilling
2009-09-18 Production Casing Operation Performed
2009-09-18 Rig Released
2009-09-18 Well Mode changed to Drilled and Cased
2009-09-28 Well Log Performed
2009-10-13 Perforation Treatment Performed - Jet Perforation
2009-11-04 Perforation Treatment Performed - Fractured
2009-11-06 Well Fluid changed to Gas
2009-11-06 Well Mode changed to Testing
2009-11-09 Well Began Production
2009-11-09 Well Fluid changed to Gas
2009-11-09 Well Mode changed to Flowing
2010-10-06 Perforation Treatment Performed - Jet Perforation
2010-10-14 Perforation Treatment Performed - Fractured
2010-10-18 Well Structure changed to Commingled
2010-11-26 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-10-13 Perforation 685.00 689.50 13
2009-11-04 Fracture 613.00 616.50 0
2009-11-04 Fracture 602.00 605.00 0
2009-11-04 Fracture 580.50 582.50 0
2009-11-04 Fracture 288.00 292.00 0
2010-10-06 Perforation 276.20 277.20 13
2010-10-06 Perforation 315.00 318.00 13
2010-10-06 Perforation 368.00 368.50 13
2010-10-06 Perforation 258.40 259.40 13
2010-10-06 Perforation 267.30 268.30 13
2010-10-06 Perforation 271.20 271.70 13
2009-10-13 Perforation 658.50 659.50 13
2010-10-06 Perforation 383.00 383.50 13
2010-10-06 Perforation 738.00 738.50 13
2010-10-06 Perforation 741.90 742.90 13
2010-10-06 Perforation 452.20 452.70 13
2010-10-06 Perforation 405.00 406.00 13
2010-10-06 Perforation 445.00 445.50 13
2010-10-14 Fracture 258.40 452.70 0
2010-10-14 Fracture 738.00 742.90 0
2009-10-13 Perforation 655.00 656.00 13
2009-10-13 Perforation 613.00 616.50 13
2009-10-13 Perforation 602.00 605.00 13
2009-10-13 Perforation 580.50 582.50 13
2009-10-13 Perforation 288.00 292.00 13
2009-11-04 Fracture 685.00 689.50 0
2009-11-04 Fracture 655.00 659.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 1272 0.0 0.0 0.0
2010 6959 0.0 0.0 0.0

For data sources see[5]

References