X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254220615000

Well Details

Well ID: 0254220615000
Loading map...
Location: 00/15-06-025-22W4/0
Location Alias: 00/15-06-25-22 W4M
Location Alias 2: 00/15-06-025-22 W4/00
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 22
Section: 06
County/Municipality: Wheatland County
Well Name: PCP PARFLESH 15-6-25-22
Operator Name: Lynx Energy ULC
License Number: 0206509
License Date: 1997-09-24
License Status: Issued
Spud Date: 1997-09-28
Final Drill Date: 1997-09-28
Well Total Depth: 829.00 m
Surface Hole Latitude: 51.110256
Surface Hole Longitude: -113.057484

For data sources see[1][2]

Well History

Date Event
1997-09-24 Obtained License
1997-09-28 Finished Drilling
1997-09-29 Production Casing Operation Performed
1997-09-29 Rig Released
1997-09-29 Well Mode changed to Drilled and Cased
1997-10-27 Well Log Performed
1997-10-30 Perforation Treatment Performed - Jet Perforation
2002-11-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-11-30 Plug Back Performed
2002-12-01 Perforation Treatment Performed - Jet Perforation
2002-12-05 Perforation Treatment Performed - Fractured
2003-02-09 Perforation Treatment Performed - Jet Perforation
2003-02-25 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-10-30 Perforation 726.00 729.00 7
2002-12-01 Perforation 367.50 368.50 13
2002-12-01 Perforation 353.10 354.10 13
2002-12-01 Perforation 299.90 302.90 13
2002-12-01 Perforation 298.30 299.30 13
2002-12-01 Perforation 270.10 271.10 13
2002-12-01 Perforation 261.10 262.10 13
2002-12-01 Perforation 255.30 256.30 13
2002-12-01 Perforation 251.00 253.00 13
2002-12-01 Perforation 247.50 248.50 13
2002-12-01 Perforation 244.20 245.20 13
1997-10-30 Perforation 671.00 674.00 7
2002-12-01 Perforation 198.70 199.70 13
2002-12-05 Fracture 198.70 438.20 0
2003-02-09 Perforation 160.70 161.70 13
2003-02-09 Perforation 156.10 157.10 13
2003-02-09 Perforation 150.80 151.80 13
2003-02-09 Perforation 147.80 148.80 13
2003-02-09 Perforation 140.30 141.30 13
2003-02-09 Perforation 131.70 132.70 13
2003-02-25 Fracture 131.70 161.70 0
1997-10-30 Perforation 647.00 650.00 7
2002-11-30 Packing Device Capped w/Cement 712.00 720.00 0
2002-11-30 Packing Device Capped w/Cement 654.00 662.00 0
2002-11-30 Packing Device Capped w/Cement 634.00 642.00 0
2002-12-01 Perforation 437.20 438.20 13
2002-12-01 Perforation 431.50 432.50 13
2002-12-01 Perforation 388.10 390.10 13

For data sources see[4]



References