X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254220405000

Well Details

Well ID: 0254220405000
Loading map...
Location: 00/05-04-025-22W4/0
Location Alias: 00/05-04-25-22 W4M
Location Alias 2: 00/05-04-025-22 W4/00
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 22
Section: 04
County/Municipality: Wheatland County
Well Name: PCP PARFLESH 5-4-25-22
Operator Name: Lynx Energy ULC
License Number: 0206344
License Date: 1997-09-19
License Status: Amended
Spud Date: 1997-09-25
Final Drill Date: 1997-09-26
Well Total Depth: 802.00 m
Surface Hole Latitude: 51.101735
Surface Hole Longitude: -113.027549

For data sources see[1][2]

Well History

Date Event
1997-09-19 Obtained License
1997-09-26 Finished Drilling
1997-09-26 Production Casing Operation Performed
1997-09-26 Rig Released
1997-09-26 Well Mode changed to Drilled and Cased
1997-10-25 Well Log Performed
1999-09-15 Perforation Treatment Performed - Jet Perforation
1999-09-23 Perforation Treatment Performed - Jet Perforation
2003-05-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-05-21 Plug Back Performed
2003-05-21 Well Mode changed to Abandoned Zone
2003-05-22 Perforation Treatment Performed - Jet Perforation
2003-06-04 Perforation Treatment Performed - Fractured
2003-06-05 Perforation Treatment Performed - Fractured
2003-06-06 Perforation Treatment Performed - Fractured
2003-12-14 Perforation Treatment Performed - Fractured
2004-01-15 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-09-15 Perforation 592.50 595.50 7
2003-05-22 Perforation 369.40 371.40 13
2003-05-22 Perforation 348.00 349.00 13
2003-05-22 Perforation 333.40 334.40 13
2003-05-22 Perforation 279.10 280.10 13
2003-05-22 Perforation 272.40 275.40 13
2003-05-22 Perforation 246.40 247.40 13
2003-05-22 Perforation 235.70 237.70 13
2003-05-22 Perforation 230.90 231.90 13
2003-05-22 Perforation 226.60 228.60 13
2003-05-22 Perforation 223.00 224.00 13
1999-09-23 Perforation 486.00 489.00 7
2003-05-22 Perforation 218.50 219.50 13
2003-05-22 Perforation 207.50 208.50 13
2003-05-22 Perforation 185.60 186.60 13
2003-05-22 Perforation 177.10 178.10 13
2003-05-22 Perforation 172.40 173.40 13
2003-06-04 Fracture 333.40 433.20 0
2003-06-05 Fracture 207.50 280.10 0
2003-06-06 Fracture 172.40 186.60 0
2003-12-14 Fracture 172.40 433.20 0
2003-05-21 Packing Device Capped w/Cement 574.00 582.00 0
2003-05-21 Packing Device Capped w/Cement 472.00 480.00 0
2003-05-22 Perforation 432.20 433.20 13
2003-05-22 Perforation 421.50 422.50 13
2003-05-22 Perforation 418.60 419.60 13
2003-05-22 Perforation 414.80 415.80 13
2003-05-22 Perforation 412.50 413.50 13

For data sources see[4]



References