X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0244270808004"

m
 
m
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0244270808004
 
| Well ID: 0244270808004
| style="height=100%; align=center" rowspan="14" | {{#display_map: 51.0287299, -113.7289652 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 51.030006, -113.727093 | width=100% | height=100% }}
 
|-
 
|-
| Well Name: PCP PCR CENTRON 8-8-24-27
+
| Location: 00/08-08-024-27W4/4
 
|-
 
|-
| Operator:
+
| Location Alias: 00/08-08-24-27 W4M
 +
|-
 +
| Location Alias 2: 00/08-08-024-27 W4/04
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 024
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 27
 +
|-
 +
| Section: 08
 +
|-
 +
| County/Municipality: [[Rocky View County,_Alberta|Rocky View County]]
 +
|-
 +
| Well Name: EMBER ENTICE 8-8-24-27
 +
|-
 +
| Operator Name: [[Ember Resources Inc.]]
 +
|-
 +
| License Number: 0109652
 
|-
 
|-
 
| License Date: 1984-10-03
 
| License Date: 1984-10-03
 
|-
 
|-
| Final Drilling Date: 2001-06-20
+
| License Status: Amended
 +
|-
 +
| Spud Date: 2001-06-20
 +
|-
 +
| Final Drill Date: 2001-06-20
 +
|-
 +
| Well Total Depth: 2033.00 m
 +
|-
 +
| Surface Hole Latitude: 51.030006
 +
|-
 +
| Surface Hole Longitude: -113.727093
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1984-10-03
 +
| Obtained License
 +
|-
 +
| 1988-07-15
 +
| Well Abandoned
 +
|-
 +
| 2001-06-20
 +
| Finished Drilling
 +
|-
 +
| 2001-06-20
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 2001-06-26
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2001-06-27
 +
| Well Log Performed
 +
|-
 +
| 2001-06-29
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2001-06-29
 +
| Well Log Performed
 +
|-
 +
| 2001-07-10
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2001-07-18
 +
| Rig Released
 +
|-
 +
| 2006-03-28
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2006-03-28
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2006-03-28
 +
| Plug Back Performed
 +
|-
 +
| 2006-03-28
 +
| Well Log Performed
 +
|-
 +
| 2006-03-29
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2006-03-31
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2006-03-31
 +
| Well Log Performed
 +
|-
 +
| 2006-04-01
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2006-04-03
 +
| Perforation Treatment Performed - Jet Perforation
 
|-
 
|-
| Total Depth: 2033.0m
+
| 2006-04-03
 +
| Well Log Performed
 
|-
 
|-
| Fluid Type: Coalbed Methane-Coals and Oth
+
| 2006-04-05
 +
| Perforation Treatment Performed - Remedial Casing
 
|-
 
|-
| Status: Flowing
+
| 2006-04-05
 +
| Well Log Performed
 
|-
 
|-
| Well Type: Not Applicable
+
| 2006-04-08
 +
| Perforation Treatment Performed - Jet Perforation
 
|-
 
|-
| Configuration: Vertical
+
| 2006-04-08
 +
| Well Log Performed
 
|-
 
|-
| Violations:
+
| 2006-04-09
 +
| Perforation Treatment Performed - Remedial Casing
 
|-
 
|-
| Latitude: 51.0287299
+
| 2006-04-12
 +
| Well Log Performed
 
|-
 
|-
| Longitude: -113.7289652
+
| 2006-07-01
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2006-10-14
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2006-10-14
 +
| Well Log Performed
 +
|-
 +
| 2006-11-02
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2006-12-19
 +
| Well Began Production
 +
|-
 +
| 2006-12-19
 +
| Well Fluid changed to Coalbed Methane-Coals and Other
 +
|-
 +
| 2006-12-19
 +
| Well Mode changed to Flowing
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 2001-06-26
 +
| Perforation
 +
| style="text-align: right;" | 1690.50
 +
| style="text-align: right;" | 1693.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-04-03
 +
| Perforation
 +
| style="text-align: right;" | 537.00
 +
| style="text-align: right;" | 538.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-04-05
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 537.00
 +
| style="text-align: right;" | 538.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2006-04-08
 +
| Perforation
 +
| style="text-align: right;" | 435.00
 +
| style="text-align: right;" | 436.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-04-09
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 435.00
 +
| style="text-align: right;" | 436.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2006-07-01
 +
| Perforation
 +
| style="text-align: right;" | 582.00
 +
| style="text-align: right;" | 584.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-10-14
 +
| Perforation
 +
| style="text-align: right;" | 743.90
 +
| style="text-align: right;" | 744.40
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-10-14
 +
| Perforation
 +
| style="text-align: right;" | 738.50
 +
| style="text-align: right;" | 739.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-10-14
 +
| Perforation
 +
| style="text-align: right;" | 697.50
 +
| style="text-align: right;" | 698.50
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-10-14
 +
| Perforation
 +
| style="text-align: right;" | 696.30
 +
| style="text-align: right;" | 697.30
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-10-14
 +
| Perforation
 +
| style="text-align: right;" | 693.40
 +
| style="text-align: right;" | 693.90
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2001-06-26
 +
| Perforation
 +
| style="text-align: right;" | 1686.00
 +
| style="text-align: right;" | 1689.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-10-14
 +
| Perforation
 +
| style="text-align: right;" | 691.30
 +
| style="text-align: right;" | 692.30
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-10-14
 +
| Perforation
 +
| style="text-align: right;" | 677.70
 +
| style="text-align: right;" | 678.70
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-10-14
 +
| Perforation
 +
| style="text-align: right;" | 676.80
 +
| style="text-align: right;" | 677.30
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-10-14
 +
| Perforation
 +
| style="text-align: right;" | 621.80
 +
| style="text-align: right;" | 622.30
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-10-14
 +
| Perforation
 +
| style="text-align: right;" | 621.10
 +
| style="text-align: right;" | 621.60
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-10-14
 +
| Perforation
 +
| style="text-align: right;" | 618.30
 +
| style="text-align: right;" | 618.80
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-10-14
 +
| Perforation
 +
| style="text-align: right;" | 598.60
 +
| style="text-align: right;" | 599.10
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-10-14
 +
| Perforation
 +
| style="text-align: right;" | 585.90
 +
| style="text-align: right;" | 586.40
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-10-14
 +
| Perforation
 +
| style="text-align: right;" | 573.30
 +
| style="text-align: right;" | 573.80
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-10-14
 +
| Perforation
 +
| style="text-align: right;" | 562.20
 +
| style="text-align: right;" | 562.70
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2001-06-29
 +
| Perforation
 +
| style="text-align: right;" | 1677.00
 +
| style="text-align: right;" | 1679.50
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-10-14
 +
| Perforation
 +
| style="text-align: right;" | 557.60
 +
| style="text-align: right;" | 558.10
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-10-14
 +
| Perforation
 +
| style="text-align: right;" | 550.70
 +
| style="text-align: right;" | 551.20
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-10-14
 +
| Perforation
 +
| style="text-align: right;" | 549.90
 +
| style="text-align: right;" | 550.40
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-10-14
 +
| Perforation
 +
| style="text-align: right;" | 538.20
 +
| style="text-align: right;" | 538.70
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-10-14
 +
| Perforation
 +
| style="text-align: right;" | 491.30
 +
| style="text-align: right;" | 491.80
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-10-14
 +
| Perforation
 +
| style="text-align: right;" | 463.60
 +
| style="text-align: right;" | 464.10
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-10-14
 +
| Perforation
 +
| style="text-align: right;" | 445.60
 +
| style="text-align: right;" | 446.10
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-10-14
 +
| Perforation
 +
| style="text-align: right;" | 443.80
 +
| style="text-align: right;" | 444.30
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-10-14
 +
| Perforation
 +
| style="text-align: right;" | 428.30
 +
| style="text-align: right;" | 428.80
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-10-14
 +
| Perforation
 +
| style="text-align: right;" | 422.10
 +
| style="text-align: right;" | 423.10
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2001-07-10
 +
| Fracture
 +
| style="text-align: right;" | 1677.00
 +
| style="text-align: right;" | 1679.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2006-10-14
 +
| Perforation
 +
| style="text-align: right;" | 417.10
 +
| style="text-align: right;" | 417.60
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-10-14
 +
| Perforation
 +
| style="text-align: right;" | 415.90
 +
| style="text-align: right;" | 416.40
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-10-14
 +
| Perforation
 +
| style="text-align: right;" | 378.70
 +
| style="text-align: right;" | 379.20
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-11-02
 +
| Fracture
 +
| style="text-align: right;" | 378.70
 +
| style="text-align: right;" | 744.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2006-03-28
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1657.00
 +
| style="text-align: right;" | 1665.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2006-03-28
 +
| Perforation
 +
| style="text-align: right;" | 673.00
 +
| style="text-align: right;" | 674.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-03-29
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 673.00
 +
| style="text-align: right;" | 674.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2006-03-31
 +
| Perforation
 +
| style="text-align: right;" | 621.00
 +
| style="text-align: right;" | 622.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-04-01
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 621.00
 +
| style="text-align: right;" | 622.00
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 2006
 +
| style="text-align: right;" | 305
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2007
 +
| style="text-align: right;" | 5087
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2008
 +
| style="text-align: right;" | 5136
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2009
 +
| style="text-align: right;" | 8759
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2010
 +
| style="text-align: right;" | 8759
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2011
 +
| style="text-align: right;" | 8758
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2012
 +
| style="text-align: right;" | 4318
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2013
 +
| style="text-align: right;" | 8740
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2014
 +
| style="text-align: right;" | 8654
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2015
 +
| style="text-align: right;" | 8706
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2016
 +
| style="text-align: right;" | 8719
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2017
 +
| style="text-align: right;" | 8667
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2018
 +
| style="text-align: right;" | 8559
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2019
 +
| style="text-align: right;" | 8686
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2020
 +
| style="text-align: right;" | 2158
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Well Production Data - All Alberta
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-25
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 22:40, 28 January 2021

Well Details

Well ID: 0244270808004
Loading map...
Location: 00/08-08-024-27W4/4
Location Alias: 00/08-08-24-27 W4M
Location Alias 2: 00/08-08-024-27 W4/04
Country: Canada
Province: Alberta
Township: 024
Meridian: 4
Range: 27
Section: 08
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 8-8-24-27
Operator Name: Ember Resources Inc.
License Number: 0109652
License Date: 1984-10-03
License Status: Amended
Spud Date: 2001-06-20
Final Drill Date: 2001-06-20
Well Total Depth: 2033.00 m
Surface Hole Latitude: 51.030006
Surface Hole Longitude: -113.727093

For data sources see[1][2]

Well History

Date Event
1984-10-03 Obtained License
1988-07-15 Well Abandoned
2001-06-20 Finished Drilling
2001-06-20 Well Mode changed to Drilled and Cased
2001-06-26 Perforation Treatment Performed - Jet Perforation
2001-06-27 Well Log Performed
2001-06-29 Perforation Treatment Performed - Jet Perforation
2001-06-29 Well Log Performed
2001-07-10 Perforation Treatment Performed - Fractured
2001-07-18 Rig Released
2006-03-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-03-28 Perforation Treatment Performed - Jet Perforation
2006-03-28 Plug Back Performed
2006-03-28 Well Log Performed
2006-03-29 Perforation Treatment Performed - Remedial Casing
2006-03-31 Perforation Treatment Performed - Jet Perforation
2006-03-31 Well Log Performed
2006-04-01 Perforation Treatment Performed - Remedial Casing
2006-04-03 Perforation Treatment Performed - Jet Perforation
2006-04-03 Well Log Performed
2006-04-05 Perforation Treatment Performed - Remedial Casing
2006-04-05 Well Log Performed
2006-04-08 Perforation Treatment Performed - Jet Perforation
2006-04-08 Well Log Performed
2006-04-09 Perforation Treatment Performed - Remedial Casing
2006-04-12 Well Log Performed
2006-07-01 Perforation Treatment Performed - Jet Perforation
2006-10-14 Perforation Treatment Performed - Jet Perforation
2006-10-14 Well Log Performed
2006-11-02 Perforation Treatment Performed - Fractured
2006-12-19 Well Began Production
2006-12-19 Well Fluid changed to Coalbed Methane-Coals and Other
2006-12-19 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-06-26 Perforation 1690.50 1693.00 17
2006-04-03 Perforation 537.00 538.00 17
2006-04-05 Remedial Casing Cementing 537.00 538.00 0
2006-04-08 Perforation 435.00 436.00 17
2006-04-09 Remedial Casing Cementing 435.00 436.00 0
2006-07-01 Perforation 582.00 584.00 13
2006-10-14 Perforation 743.90 744.40 13
2006-10-14 Perforation 738.50 739.00 13
2006-10-14 Perforation 697.50 698.50 13
2006-10-14 Perforation 696.30 697.30 13
2006-10-14 Perforation 693.40 693.90 13
2001-06-26 Perforation 1686.00 1689.00 17
2006-10-14 Perforation 691.30 692.30 13
2006-10-14 Perforation 677.70 678.70 13
2006-10-14 Perforation 676.80 677.30 13
2006-10-14 Perforation 621.80 622.30 13
2006-10-14 Perforation 621.10 621.60 13
2006-10-14 Perforation 618.30 618.80 13
2006-10-14 Perforation 598.60 599.10 13
2006-10-14 Perforation 585.90 586.40 13
2006-10-14 Perforation 573.30 573.80 13
2006-10-14 Perforation 562.20 562.70 13
2001-06-29 Perforation 1677.00 1679.50 17
2006-10-14 Perforation 557.60 558.10 13
2006-10-14 Perforation 550.70 551.20 13
2006-10-14 Perforation 549.90 550.40 13
2006-10-14 Perforation 538.20 538.70 13
2006-10-14 Perforation 491.30 491.80 13
2006-10-14 Perforation 463.60 464.10 13
2006-10-14 Perforation 445.60 446.10 13
2006-10-14 Perforation 443.80 444.30 13
2006-10-14 Perforation 428.30 428.80 13
2006-10-14 Perforation 422.10 423.10 13
2001-07-10 Fracture 1677.00 1679.50 0
2006-10-14 Perforation 417.10 417.60 13
2006-10-14 Perforation 415.90 416.40 13
2006-10-14 Perforation 378.70 379.20 13
2006-11-02 Fracture 378.70 744.40 0
2006-03-28 Packing Device Capped w/Cement 1657.00 1665.00 0
2006-03-28 Perforation 673.00 674.00 17
2006-03-29 Remedial Casing Cementing 673.00 674.00 0
2006-03-31 Perforation 621.00 622.00 17
2006-04-01 Remedial Casing Cementing 621.00 622.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 305 0.0 0.0 0.0
2007 5087 0.0 0.0 0.0
2008 5136 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8758 0.0 0.0 0.0
2012 4318 0.0 0.0 0.0
2013 8740 0.0 0.0 0.0
2014 8654 0.0 0.0 0.0
2015 8706 0.0 0.0 0.0
2016 8719 0.0 0.0 0.0
2017 8667 0.0 0.0 0.0
2018 8559 0.0 0.0 0.0
2019 8686 0.0 0.0 0.0
2020 2158 0.0 0.0 0.0

For data sources see[5]

References