X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0244263605000

Well Details

Well ID: 0244263605000
Loading map...
Location: 00/05-36-024-26W4/0
Location Alias: 00/05-36-24-26 W4M
Location Alias 2: 00/05-36-024-26 W4/00
Country: Canada
Province: Alberta
Township: 024
Meridian: 4
Range: 26
Section: 36
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 5-36-24-26
Operator Name: Ember Resources Inc.
License Number: 0221226
License Date: 1999-02-04
License Status: Issued
Spud Date: 1999-02-08
Final Drill Date: 1999-02-10
Well Total Depth: 1019.00 m
Surface Hole Latitude: 51.086910
Surface Hole Longitude: -113.515801

For data sources see[1][2]

Well History

Date Event
1999-02-04 Obtained License
1999-02-10 Finished Drilling
1999-02-10 Production Casing Operation Performed
1999-02-10 Rig Released
1999-02-10 Well Mode changed to Drilled and Cased
1999-02-26 Perforation Treatment Performed - Jet Perforation
1999-03-05 Perforation Treatment Performed - Fractured
1999-04-01 Well Log Performed
2000-10-24 Well Began Production
2000-10-24 Well Fluid changed to Gas
2000-10-24 Well Mode changed to Flowing
2001-10-07 Perforation Treatment Performed - Jet Perforation
2001-11-22 Well Fluid changed to Gas
2001-11-22 Well Mode changed to Flowing
2009-08-09 Well Log Performed
2009-09-19 Perforation Treatment Performed - Jet Perforation
2009-09-24 Perforation Treatment Performed - Fractured
2009-10-07 Well Structure changed to Commingled
2009-11-10 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-02-26 Perforation 668.50 671.00 7
2009-09-19 Perforation 436.90 437.90 13
2009-09-19 Perforation 327.20 327.70 13
2009-09-19 Perforation 419.10 420.10 13
2009-09-19 Perforation 351.00 352.00 13
2009-09-19 Perforation 375.00 377.00 13
2009-09-19 Perforation 204.00 205.00 13
2009-09-19 Perforation 211.00 213.00 13
2009-09-19 Perforation 518.00 519.00 13
2009-09-19 Perforation 290.70 291.20 13
2009-09-19 Perforation 387.00 388.00 13
1999-02-26 Perforation 681.00 686.00 7
2009-09-19 Perforation 490.00 492.00 13
2009-09-19 Perforation 565.70 566.70 13
2009-09-19 Perforation 605.40 605.90 13
2009-09-19 Perforation 559.60 560.10 13
2009-09-19 Perforation 561.40 562.40 13
2009-09-19 Perforation 900.10 900.60 13
2009-09-19 Perforation 904.70 905.20 13
2009-09-19 Perforation 609.40 611.40 13
2009-09-19 Perforation 614.40 614.90 13
2009-09-19 Perforation 469.70 470.70 13
1999-03-05 Fracture 668.50 686.00 0
2009-09-19 Perforation 479.30 479.80 13
2009-09-19 Perforation 441.40 441.90 13
2009-09-19 Perforation 465.80 466.30 13
2009-09-19 Perforation 480.80 482.80 13
2009-09-19 Perforation 540.70 541.20 13
2009-09-19 Perforation 538.70 539.70 13
2009-09-19 Perforation 483.90 484.90 13
2009-09-24 Fracture 204.00 519.00 0
2009-09-24 Fracture 290.70 905.20 0
2001-10-07 Perforation 457.00 459.00 20
2009-09-19 Perforation 314.80 315.30 13
2009-09-19 Perforation 320.80 321.30 13
2009-09-19 Perforation 292.60 293.10 13
2009-09-19 Perforation 307.40 308.40 13
2009-09-19 Perforation 429.10 429.60 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 24 0.0 0.0 0.0
2000 1616 0.0 0.0 0.0
2001 8715 0.0 0.0 0.0
2002 8758 0.0 0.0 0.0
2003 8726 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8228 0.0 0.0 0.0
2006 8656 0.0 0.0 0.0
2007 8735 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 6551 0.0 0.0 0.0

For data sources see[5]

References