X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0244233504003"

m
 
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0244233504003
 
| Well ID: 0244233504003
| style="height=100%; align=center" rowspan="14" | {{#display_map: 51.0833073, -113.1185307 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 51.082039, -113.116005 | width=100% | height=100% }}
 +
|-
 +
| Location: 00/04-35-024-23W4/3
 +
|-
 +
| Location Alias: 00/04-35-24-23 W4M
 +
|-
 +
| Location Alias 2: 00/04-35-024-23 W4/03
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 024
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 23
 +
|-
 +
| Section: 35
 +
|-
 +
| County/Municipality: [[Wheatland County,_Alberta|Wheatland County]]
 
|-
 
|-
 
| Well Name: PCP PARFLESH 4-35-24-23
 
| Well Name: PCP PARFLESH 4-35-24-23
 
|-
 
|-
| Operator:
+
| Operator Name: [[Lynx Energy ULC]]
 +
|-
 +
| License Number: 0178853
 
|-
 
|-
 
| License Date: 1995-06-26
 
| License Date: 1995-06-26
 
|-
 
|-
| Final Drilling Date: 1995-07-18
+
| License Status: Issued
 +
|-
 +
| Spud Date: 1995-07-12
 +
|-
 +
| Final Drill Date: 1995-07-18
 +
|-
 +
| Well Total Depth: 1613.00 m
 +
|-
 +
| Surface Hole Latitude: 51.082039
 
|-
 
|-
| Total Depth: 1613.0m
+
| Surface Hole Longitude: -113.116005
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 
|-
 
|-
| Fluid Type: Coalbed Methane-Coals Only
+
| 1995-06-26
 +
| Obtained License
 
|-
 
|-
| Status: Flowing
+
| 1995-07-13
 +
| Surface Casing Operation Performed
 
|-
 
|-
| Well Type: Not Applicable
+
| 1995-07-18
 +
| Finished Drilling
 
|-
 
|-
| Configuration: Vertical
+
| 1995-07-18
 +
| Well Log Performed
 
|-
 
|-
| Violations:
+
| 1995-07-18
 +
| Well Mode changed to Drilled and Cased
 
|-
 
|-
| Latitude: 51.0833073
+
| 1995-07-20
 +
| Production Casing Operation Performed
 
|-
 
|-
| Longitude: -113.1185307
+
| 1995-07-20
 +
| Rig Released
 +
|-
 +
| 1996-03-16
 +
| Well Log Performed
 +
|-
 +
| 1996-03-17
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1996-03-20
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2004-06-05
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2004-06-05
 +
| Well Log Performed
 +
|-
 +
| 2004-07-25
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2004-07-25
 +
| Plug Back Performed
 +
|-
 +
| 2004-07-25
 +
| Well Log Performed
 +
|-
 +
| 2005-01-19
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2005-01-19
 +
| Well Log Performed
 +
|-
 +
| 2005-04-26
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2005-05-15
 +
| Well Fluid changed to Coalbed Methane-Coals Only
 +
|-
 +
| 2005-05-15
 +
| Well Mode changed to Testing
 +
|-
 +
| 2009-12-18
 +
| Well Began Production
 +
|-
 +
| 2009-12-18
 +
| Well Fluid changed to Coalbed Methane-Coals Only
 +
|-
 +
| 2009-12-18
 +
| Well Mode changed to Flowing
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 1996-03-17
 +
| Perforation
 +
| style="text-align: right;" | 1534.00
 +
| style="text-align: right;" | 1538.00
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2005-01-19
 +
| Perforation
 +
| style="text-align: right;" | 468.30
 +
| style="text-align: right;" | 469.30
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2005-01-19
 +
| Perforation
 +
| style="text-align: right;" | 461.90
 +
| style="text-align: right;" | 463.90
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2005-01-19
 +
| Perforation
 +
| style="text-align: right;" | 430.80
 +
| style="text-align: right;" | 431.80
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2005-01-19
 +
| Perforation
 +
| style="text-align: right;" | 415.20
 +
| style="text-align: right;" | 416.20
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2005-01-19
 +
| Perforation
 +
| style="text-align: right;" | 408.40
 +
| style="text-align: right;" | 409.40
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2005-01-19
 +
| Perforation
 +
| style="text-align: right;" | 394.00
 +
| style="text-align: right;" | 395.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2005-01-19
 +
| Perforation
 +
| style="text-align: right;" | 337.20
 +
| style="text-align: right;" | 340.20
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2005-01-19
 +
| Perforation
 +
| style="text-align: right;" | 318.20
 +
| style="text-align: right;" | 319.20
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2005-01-19
 +
| Perforation
 +
| style="text-align: right;" | 315.90
 +
| style="text-align: right;" | 316.90
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2005-01-19
 +
| Perforation
 +
| style="text-align: right;" | 304.80
 +
| style="text-align: right;" | 305.80
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1996-03-20
 +
| Fracture
 +
| style="text-align: right;" | 1534.00
 +
| style="text-align: right;" | 1538.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2005-01-19
 +
| Perforation
 +
| style="text-align: right;" | 296.70
 +
| style="text-align: right;" | 297.70
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2005-01-19
 +
| Perforation
 +
| style="text-align: right;" | 288.00
 +
| style="text-align: right;" | 289.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2005-01-19
 +
| Perforation
 +
| style="text-align: right;" | 284.20
 +
| style="text-align: right;" | 285.20
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2005-01-19
 +
| Perforation
 +
| style="text-align: right;" | 281.50
 +
| style="text-align: right;" | 282.50
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2005-01-19
 +
| Perforation
 +
| style="text-align: right;" | 233.50
 +
| style="text-align: right;" | 234.50
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2005-01-19
 +
| Perforation
 +
| style="text-align: right;" | 228.10
 +
| style="text-align: right;" | 230.10
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2005-04-26
 +
| Fracture
 +
| style="text-align: right;" | 228.10
 +
| style="text-align: right;" | 485.60
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2004-06-05
 +
| Perforation
 +
| style="text-align: right;" | 767.00
 +
| style="text-align: right;" | 771.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2004-07-25
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1518.50
 +
| style="text-align: right;" | 1521.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2005-01-19
 +
| Perforation
 +
| style="text-align: right;" | 484.60
 +
| style="text-align: right;" | 485.60
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2005-01-19
 +
| Perforation
 +
| style="text-align: right;" | 480.00
 +
| style="text-align: right;" | 482.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2005-01-19
 +
| Perforation
 +
| style="text-align: right;" | 478.10
 +
| style="text-align: right;" | 479.10
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2005-01-19
 +
| Perforation
 +
| style="text-align: right;" | 476.10
 +
| style="text-align: right;" | 477.10
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2005-01-19
 +
| Perforation
 +
| style="text-align: right;" | 471.00
 +
| style="text-align: right;" | 472.00
 +
| style="text-align: right;" | 13
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 2005
 +
| style="text-align: right;" | 3
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2010
 +
| style="text-align: right;" | 7961
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2011
 +
| style="text-align: right;" | 8697
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2012
 +
| style="text-align: right;" | 8364
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2013
 +
| style="text-align: right;" | 8554
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2014
 +
| style="text-align: right;" | 7429
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2015
 +
| style="text-align: right;" | 8653
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2016
 +
| style="text-align: right;" | 8746
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2017
 +
| style="text-align: right;" | 8662
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2018
 +
| style="text-align: right;" | 8750
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2019
 +
| style="text-align: right;" | 8759
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2020
 +
| style="text-align: right;" | 2183
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Well Production Data - All Alberta
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-25
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 21:50, 28 January 2021

Well Details

Well ID: 0244233504003
Loading map...
Location: 00/04-35-024-23W4/3
Location Alias: 00/04-35-24-23 W4M
Location Alias 2: 00/04-35-024-23 W4/03
Country: Canada
Province: Alberta
Township: 024
Meridian: 4
Range: 23
Section: 35
County/Municipality: Wheatland County
Well Name: PCP PARFLESH 4-35-24-23
Operator Name: Lynx Energy ULC
License Number: 0178853
License Date: 1995-06-26
License Status: Issued
Spud Date: 1995-07-12
Final Drill Date: 1995-07-18
Well Total Depth: 1613.00 m
Surface Hole Latitude: 51.082039
Surface Hole Longitude: -113.116005

For data sources see[1][2]

Well History

Date Event
1995-06-26 Obtained License
1995-07-13 Surface Casing Operation Performed
1995-07-18 Finished Drilling
1995-07-18 Well Log Performed
1995-07-18 Well Mode changed to Drilled and Cased
1995-07-20 Production Casing Operation Performed
1995-07-20 Rig Released
1996-03-16 Well Log Performed
1996-03-17 Perforation Treatment Performed - Jet Perforation
1996-03-20 Perforation Treatment Performed - Fractured
2004-06-05 Perforation Treatment Performed - Jet Perforation
2004-06-05 Well Log Performed
2004-07-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-07-25 Plug Back Performed
2004-07-25 Well Log Performed
2005-01-19 Perforation Treatment Performed - Jet Perforation
2005-01-19 Well Log Performed
2005-04-26 Perforation Treatment Performed - Fractured
2005-05-15 Well Fluid changed to Coalbed Methane-Coals Only
2005-05-15 Well Mode changed to Testing
2009-12-18 Well Began Production
2009-12-18 Well Fluid changed to Coalbed Methane-Coals Only
2009-12-18 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-03-17 Perforation 1534.00 1538.00 20
2005-01-19 Perforation 468.30 469.30 13
2005-01-19 Perforation 461.90 463.90 13
2005-01-19 Perforation 430.80 431.80 13
2005-01-19 Perforation 415.20 416.20 13
2005-01-19 Perforation 408.40 409.40 13
2005-01-19 Perforation 394.00 395.00 13
2005-01-19 Perforation 337.20 340.20 13
2005-01-19 Perforation 318.20 319.20 13
2005-01-19 Perforation 315.90 316.90 13
2005-01-19 Perforation 304.80 305.80 13
1996-03-20 Fracture 1534.00 1538.00 0
2005-01-19 Perforation 296.70 297.70 13
2005-01-19 Perforation 288.00 289.00 13
2005-01-19 Perforation 284.20 285.20 13
2005-01-19 Perforation 281.50 282.50 13
2005-01-19 Perforation 233.50 234.50 13
2005-01-19 Perforation 228.10 230.10 13
2005-04-26 Fracture 228.10 485.60 0
2004-06-05 Perforation 767.00 771.00 13
2004-07-25 Packing Device Capped w/Cement 1518.50 1521.50 0
2005-01-19 Perforation 484.60 485.60 13
2005-01-19 Perforation 480.00 482.00 13
2005-01-19 Perforation 478.10 479.10 13
2005-01-19 Perforation 476.10 477.10 13
2005-01-19 Perforation 471.00 472.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 3 0.0 0.0 0.0
2010 7961 0.0 0.0 0.0
2011 8697 0.0 0.0 0.0
2012 8364 0.0 0.0 0.0
2013 8554 0.0 0.0 0.0
2014 7429 0.0 0.0 0.0
2015 8653 0.0 0.0 0.0
2016 8746 0.0 0.0 0.0
2017 8662 0.0 0.0 0.0
2018 8750 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References