X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0244223210000"

m
m
 
Line 402: Line 402:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 21:14, 28 January 2021

Well Details

Well ID: 0244223210000
Loading map...
Location: 00/10-32-024-22W4/0
Location Alias: 00/10-32-24-22 W4M
Location Alias 2: 00/10-32-024-22 W4/00
Country: Canada
Province: Alberta
Township: 024
Meridian: 4
Range: 22
Section: 32
County/Municipality: Wheatland County
Well Name: PCP HUSSAR 10-32-24-22
Operator Name: Lynx Energy ULC
License Number: 0172746
License Date: 1994-11-18
License Status: Issued
Spud Date: 1994-12-17
Final Drill Date: 1994-12-21
Well Total Depth: 1530.00 m
Surface Hole Latitude: 51.090912
Surface Hole Longitude: -113.035858

For data sources see[1][2]

Well History

Date Event
1994-11-18 Obtained License
1994-12-17 Surface Casing Operation Performed
1994-12-21 Finished Drilling
1994-12-21 Well Mode changed to Drilled and Cased
1994-12-22 Well Log Performed
1994-12-23 Production Casing Operation Performed
1994-12-23 Rig Released
1995-01-21 Well Log Performed
1995-01-22 Perforation Treatment Performed - Jet Perforation
1995-01-23 Well Log Performed
1995-01-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-01-24 Plug Back Performed
1995-01-24 Well Log Performed
1995-01-25 Perforation Treatment Performed - Jet Perforation
1995-01-26 Perforation Treatment Performed - Fractured
1997-08-18 Well Began Production
1997-08-18 Well Fluid changed to Gas
1997-08-18 Well Mode changed to Flowing
2014-05-14 Well Fluid changed to Gas
2014-05-14 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-01-22 Perforation 1501.50 1503.50 13
1995-01-24 Packing Device Capped w/Cement 1490.00 1493.00 0
1995-01-25 Perforation 1461.50 1467.00 13
1995-01-25 Perforation 1470.50 1478.00 13
1995-01-26 Fracture 1461.50 1478.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 48 0.0 0.0 0.0
1997 2592 0.0 0.0 0.0
1998 7598 0.0 0.0 0.0
1999 6999 0.0 0.0 0.0
2000 6674 0.0 0.0 0.0
2001 7217 0.0 0.0 0.0
2002 5555 0.0 0.0 0.0
2003 5934 0.0 0.0 0.0
2004 7123 0.0 0.0 0.0
2005 5635 0.0 0.0 0.0
2006 5278 0.0 0.0 0.0
2007 8147 0.0 0.0 0.0
2008 8648 0.0 0.0 0.0
2009 8614 0.0 0.0 0.0
2010 8370 0.0 0.0 0.0
2011 8521 0.0 0.0 0.0
2012 8012 0.0 0.0 0.0
2013 7721 0.0 0.0 0.0
2014 6356 0.0 0.0 0.0
2015 8231 0.0 0.0 0.0
2016 8760 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 7580 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References