X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0224262709000"

m
 
m
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0224262709000
 
| Well ID: 0224262709000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 50.9015447, -113.5166274 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 50.895146, -113.524248 | width=100% | height=100% }}
 
|-
 
|-
| Well Name: ECA ENTICE 9-27-22-26
+
| Location: 00/09-27-022-26W4/0
 
|-
 
|-
| Operator:
+
| Location Alias: 00/09-27-22-26 W4M
 +
|-
 +
| Location Alias 2: 00/09-27-022-26 W4/00
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 022
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 26
 +
|-
 +
| Section: 27
 +
|-
 +
| County/Municipality: [[Wheatland County,_Alberta|Wheatland County]]
 +
|-
 +
| Well Name: PERSIST OIL ENTICE 9-27-22-26
 +
|-
 +
| Operator Name: [[Persist Oil And Gas Inc.]]
 +
|-
 +
| License Number: 0441847
 
|-
 
|-
 
| License Date: 2011-12-21
 
| License Date: 2011-12-21
 
|-
 
|-
| Final Drilling Date: 2012-01-18
+
| License Status: Issued
 +
|-
 +
| Spud Date: 2012-01-16
 +
|-
 +
| Final Drill Date: 2012-01-18
 +
|-
 +
| Well Total Depth: 1265.00 m
 +
|-
 +
| Surface Hole Latitude: 50.895146
 +
|-
 +
| Surface Hole Longitude: -113.524248
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2011-12-21
 +
| Obtained License
 +
|-
 +
| 2012-01-16
 +
| Direction Drilling Operation Performed - Deviate
 +
|-
 +
| 2012-01-17
 +
| Surface Casing Operation Performed
 +
|-
 +
| 2012-01-18
 +
| Finished Drilling
 +
|-
 +
| 2012-01-18
 +
| Production Casing Operation Performed
 +
|-
 +
| 2012-01-18
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 2012-01-19
 +
| Rig Released
 +
|-
 +
| 2012-01-26
 +
| Well Log Performed
 +
|-
 +
| 2012-02-09
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2012-02-12
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2012-02-15
 +
| Well Fluid changed to Coalbed Methane-Coals and Other
 +
|-
 +
| 2012-02-15
 +
| Well Mode changed to Testing
 +
|-
 +
| 2012-02-21
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2012-02-28
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2012-05-15
 +
| Well Fluid changed to Coalbed Methane-Coals and Other
 +
|-
 +
| 2012-05-15
 +
| Well Mode changed to Test Completed
 +
|-
 +
| 2012-09-11
 +
| Well Began Production
 +
|-
 +
| 2012-09-11
 +
| Well Fluid changed to Coalbed Methane-Coals and Other
 +
|-
 +
| 2012-09-11
 +
| Well Mode changed to Flowing
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
| 2012-01-16
 +
| [[Precision Drilling Corporation]]
 +
| style="text-align: right;" | 155
 +
| style="text-align: right;" | N/A
 +
| Drill To LD
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =ST49: Daily Spud and Drilling Activity List
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-30
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-09 }}</ref>
 +
== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
| 2012-01-16
 +
| style="text-align: right;" | 0.00
 +
| Deviate (5 - 79 degrees)
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Direction Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 2012-02-09
 +
| Perforation
 +
| style="text-align: right;" | 901.00
 +
| style="text-align: right;" | 903.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2012-02-21
 +
| Perforation
 +
| style="text-align: right;" | 497.30
 +
| style="text-align: right;" | 498.30
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2012-02-21
 +
| Perforation
 +
| style="text-align: right;" | 500.70
 +
| style="text-align: right;" | 501.20
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2012-02-21
 +
| Perforation
 +
| style="text-align: right;" | 523.50
 +
| style="text-align: right;" | 524.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2012-02-21
 +
| Perforation
 +
| style="text-align: right;" | 561.50
 +
| style="text-align: right;" | 562.50
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2012-02-21
 +
| Perforation
 +
| style="text-align: right;" | 579.60
 +
| style="text-align: right;" | 580.60
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2012-02-21
 +
| Perforation
 +
| style="text-align: right;" | 585.20
 +
| style="text-align: right;" | 586.20
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2012-02-21
 +
| Perforation
 +
| style="text-align: right;" | 592.10
 +
| style="text-align: right;" | 593.10
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2012-02-21
 +
| Perforation
 +
| style="text-align: right;" | 600.90
 +
| style="text-align: right;" | 601.90
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2012-02-21
 +
| Perforation
 +
| style="text-align: right;" | 605.70
 +
| style="text-align: right;" | 606.20
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2012-02-21
 +
| Perforation
 +
| style="text-align: right;" | 606.90
 +
| style="text-align: right;" | 608.40
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2012-02-09
 +
| Perforation
 +
| style="text-align: right;" | 1057.50
 +
| style="text-align: right;" | 1059.50
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2012-02-21
 +
| Perforation
 +
| style="text-align: right;" | 608.70
 +
| style="text-align: right;" | 609.20
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2012-02-21
 +
| Perforation
 +
| style="text-align: right;" | 622.60
 +
| style="text-align: right;" | 623.10
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2012-02-21
 +
| Perforation
 +
| style="text-align: right;" | 627.40
 +
| style="text-align: right;" | 628.40
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2012-02-21
 +
| Perforation
 +
| style="text-align: right;" | 637.70
 +
| style="text-align: right;" | 638.70
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2012-02-21
 +
| Perforation
 +
| style="text-align: right;" | 640.00
 +
| style="text-align: right;" | 642.50
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2012-02-21
 +
| Perforation
 +
| style="text-align: right;" | 643.70
 +
| style="text-align: right;" | 644.20
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2012-02-21
 +
| Perforation
 +
| style="text-align: right;" | 648.90
 +
| style="text-align: right;" | 650.90
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2012-02-21
 +
| Perforation
 +
| style="text-align: right;" | 656.10
 +
| style="text-align: right;" | 657.10
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2012-02-21
 +
| Perforation
 +
| style="text-align: right;" | 690.00
 +
| style="text-align: right;" | 690.50
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2012-02-21
 +
| Perforation
 +
| style="text-align: right;" | 718.80
 +
| style="text-align: right;" | 719.80
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2012-02-12
 +
| Fracture
 +
| style="text-align: right;" | 901.00
 +
| style="text-align: right;" | 903.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-02-21
 +
| Perforation
 +
| style="text-align: right;" | 723.80
 +
| style="text-align: right;" | 724.30
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2012-02-21
 +
| Perforation
 +
| style="text-align: right;" | 742.60
 +
| style="text-align: right;" | 743.60
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2012-02-21
 +
| Perforation
 +
| style="text-align: right;" | 749.90
 +
| style="text-align: right;" | 750.90
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2012-02-21
 +
| Perforation
 +
| style="text-align: right;" | 762.00
 +
| style="text-align: right;" | 764.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2012-02-21
 +
| Perforation
 +
| style="text-align: right;" | 765.30
 +
| style="text-align: right;" | 766.30
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2012-02-21
 +
| Perforation
 +
| style="text-align: right;" | 818.60
 +
| style="text-align: right;" | 819.60
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Total Depth: 1265.0m
+
| 2012-02-21
 +
| Perforation
 +
| style="text-align: right;" | 824.10
 +
| style="text-align: right;" | 824.60
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Fluid Type: Coalbed Methane-Coals and Oth
+
| 2012-02-21
 +
| Perforation
 +
| style="text-align: right;" | 830.70
 +
| style="text-align: right;" | 831.20
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Status: Flowing
+
| 2012-02-28
 +
| Fracture
 +
| style="text-align: right;" | 398.80
 +
| style="text-align: right;" | 831.20
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Well Type: Not Applicable
+
| 2012-02-12
 +
| Fracture
 +
| style="text-align: right;" | 1057.50
 +
| style="text-align: right;" | 1059.50
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Configuration: Vertical
+
| 2012-02-21
 +
| Perforation
 +
| style="text-align: right;" | 398.80
 +
| style="text-align: right;" | 399.30
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Violations:
+
| 2012-02-21
 +
| Perforation
 +
| style="text-align: right;" | 420.50
 +
| style="text-align: right;" | 421.50
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Latitude: 50.9015447
+
| 2012-02-21
 +
| Perforation
 +
| style="text-align: right;" | 422.40
 +
| style="text-align: right;" | 422.90
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Longitude: -113.5166274
+
| 2012-02-21
 +
| Perforation
 +
| style="text-align: right;" | 433.00
 +
| style="text-align: right;" | 435.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2012-02-21
 +
| Perforation
 +
| style="text-align: right;" | 453.50
 +
| style="text-align: right;" | 454.00
 +
| style="text-align: right;" | 13
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 2012
 +
| style="text-align: right;" | 2608
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2013
 +
| style="text-align: right;" | 8602
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2014
 +
| style="text-align: right;" | 8650
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2015
 +
| style="text-align: right;" | 8704
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2016
 +
| style="text-align: right;" | 8735
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2017
 +
| style="text-align: right;" | 8570
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2018
 +
| style="text-align: right;" | 8678
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2019
 +
| style="text-align: right;" | 8748
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2020
 +
| style="text-align: right;" | 2183
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Well Production Data - All Alberta
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-25
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 16:53, 19 January 2021

Well Details

Well ID: 0224262709000
Loading map...
Location: 00/09-27-022-26W4/0
Location Alias: 00/09-27-22-26 W4M
Location Alias 2: 00/09-27-022-26 W4/00
Country: Canada
Province: Alberta
Township: 022
Meridian: 4
Range: 26
Section: 27
County/Municipality: Wheatland County
Well Name: PERSIST OIL ENTICE 9-27-22-26
Operator Name: Persist Oil And Gas Inc.
License Number: 0441847
License Date: 2011-12-21
License Status: Issued
Spud Date: 2012-01-16
Final Drill Date: 2012-01-18
Well Total Depth: 1265.00 m
Surface Hole Latitude: 50.895146
Surface Hole Longitude: -113.524248

For data sources see[1][2]

Well History

Date Event
2011-12-21 Obtained License
2012-01-16 Direction Drilling Operation Performed - Deviate
2012-01-17 Surface Casing Operation Performed
2012-01-18 Finished Drilling
2012-01-18 Production Casing Operation Performed
2012-01-18 Well Mode changed to Drilled and Cased
2012-01-19 Rig Released
2012-01-26 Well Log Performed
2012-02-09 Perforation Treatment Performed - Jet Perforation
2012-02-12 Perforation Treatment Performed - Fractured
2012-02-15 Well Fluid changed to Coalbed Methane-Coals and Other
2012-02-15 Well Mode changed to Testing
2012-02-21 Perforation Treatment Performed - Jet Perforation
2012-02-28 Perforation Treatment Performed - Fractured
2012-05-15 Well Fluid changed to Coalbed Methane-Coals and Other
2012-05-15 Well Mode changed to Test Completed
2012-09-11 Well Began Production
2012-09-11 Well Fluid changed to Coalbed Methane-Coals and Other
2012-09-11 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-01-16 Precision Drilling Corporation 155 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-01-16 0.00 Deviate (5 - 79 degrees)

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-09 Perforation 901.00 903.00 13
2012-02-21 Perforation 497.30 498.30 13
2012-02-21 Perforation 500.70 501.20 13
2012-02-21 Perforation 523.50 524.00 13
2012-02-21 Perforation 561.50 562.50 13
2012-02-21 Perforation 579.60 580.60 13
2012-02-21 Perforation 585.20 586.20 13
2012-02-21 Perforation 592.10 593.10 13
2012-02-21 Perforation 600.90 601.90 13
2012-02-21 Perforation 605.70 606.20 13
2012-02-21 Perforation 606.90 608.40 13
2012-02-09 Perforation 1057.50 1059.50 13
2012-02-21 Perforation 608.70 609.20 13
2012-02-21 Perforation 622.60 623.10 13
2012-02-21 Perforation 627.40 628.40 13
2012-02-21 Perforation 637.70 638.70 13
2012-02-21 Perforation 640.00 642.50 13
2012-02-21 Perforation 643.70 644.20 13
2012-02-21 Perforation 648.90 650.90 13
2012-02-21 Perforation 656.10 657.10 13
2012-02-21 Perforation 690.00 690.50 13
2012-02-21 Perforation 718.80 719.80 13
2012-02-12 Fracture 901.00 903.00 0
2012-02-21 Perforation 723.80 724.30 13
2012-02-21 Perforation 742.60 743.60 13
2012-02-21 Perforation 749.90 750.90 13
2012-02-21 Perforation 762.00 764.00 13
2012-02-21 Perforation 765.30 766.30 13
2012-02-21 Perforation 818.60 819.60 13
2012-02-21 Perforation 824.10 824.60 13
2012-02-21 Perforation 830.70 831.20 13
2012-02-28 Fracture 398.80 831.20 0
2012-02-12 Fracture 1057.50 1059.50 0
2012-02-21 Perforation 398.80 399.30 13
2012-02-21 Perforation 420.50 421.50 13
2012-02-21 Perforation 422.40 422.90 13
2012-02-21 Perforation 433.00 435.00 13
2012-02-21 Perforation 453.50 454.00 13

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 2608 0.0 0.0 0.0
2013 8602 0.0 0.0 0.0
2014 8650 0.0 0.0 0.0
2015 8704 0.0 0.0 0.0
2016 8735 0.0 0.0 0.0
2017 8570 0.0 0.0 0.0
2018 8678 0.0 0.0 0.0
2019 8748 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[7]

References