X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0214073510000

Well Details

Well ID: 0214073510000
Loading map...
Location: 00/10-35-021-07W4/0
Location Alias: 00/10-35-21-07 W4M
Location Alias 2: 00/10-35-021-07 W4/00
Country: Canada
Province: Alberta
Township: 021
Meridian: 4
Range: 07
Section: 35
County/Municipality: Special Areas No. 2
Well Name: SLE 10BHZ ATL-BUFF 10-35-21-7
Operator Name: SanLing Energy Ltd.
License Number: 0218139
License Date: 1998-10-16
License Status: Abandoned
Spud Date: 1998-12-04
Final Drill Date: 1998-12-11
Well Total Depth: 1337.00 m
Surface Hole Latitude: 50.831436
Surface Hole Longitude: -110.865668

For data sources see[1][2]

Well History

Date Event
1998-10-16 Obtained License
1998-12-05 Surface Casing Operation Performed
1998-12-08 Intermediate Casing Operation Performed
1998-12-09 Direction Drilling Operation Performed - Horizontal
1998-12-11 Finished Drilling
1998-12-12 Liner Casing Operation Performed
1998-12-12 Perforation Treatment Performed - Open-Hole Completion
1998-12-12 Perforation Treatment Performed - Slotted Liner or Casing
1998-12-13 Rig Released
1998-12-13 Well Mode changed to Drilled and Cased
1998-12-16 Well Log Performed
1999-01-13 Well Began Production
1999-01-13 Well Fluid changed to Crude Oil
1999-01-13 Well Mode changed to Pumping
2007-05-31 Well Fluid changed to Crude Oil
2007-05-31 Well Mode changed to Suspended
2017-05-31 Well Log Performed
2018-02-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-02-15 Plug Back Performed
2018-02-15 Well Fluid changed to Crude Oil
2018-02-15 Well Mode changed to Abandoned Zone
2018-03-01 Well Abandoned
2018-03-01 Well Fluid changed to Crude Oil
2018-03-01 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1998-12-09 1068.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-12-12 Slotted Liner 1011.80 1329.00 0
1998-12-12 Open Hole/Barefoot Completion 1329.00 1337.00 0
2018-02-15 Packing Device Capped w/Cement 894.50 909.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 8290 0.0 0.0 0.0
2000 8514 0.0 0.0 0.0
2001 8274 0.0 0.0 0.0
2002 8728 0.0 0.0 0.0
2003 7369 0.0 0.0 0.0
2004 8573 0.0 0.0 0.0
2005 3591 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-05-30 No Incident Encountered 0.00 0.00
2018-02-15 No Incident Encountered 0.00 0.00

For data sources see[7]

References