X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204082111C00

Well Details

Well ID: 0204082111C00
Loading map...
Location: C0/11-21-020-08W4/0
Location Alias: C0/11-21-20-08 W4M
Location Alias 2: C0/11-21-020-08 W4/00
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 08
Section: 21
County/Municipality: Special Areas No. 2
Well Name: CARDINAL SUFFIELD 11-21-20-8
Operator Name: Cardinal Energy Ltd.
License Number: 0153505
License Date: 1992-08-21
License Status: Suspension
Spud Date: 1992-08-26
Final Drill Date: 1992-08-29
Well Total Depth: 954.00 m
Surface Hole Latitude: 50.712954
Surface Hole Longitude: -111.060268

For data sources see[1][2]

Well History

Date Event
1992-08-21 Obtained License
1992-08-27 Surface Casing Operation Performed
1992-08-28 Direction Drilling Operation Performed - Deviate
1992-08-29 Finished Drilling
1992-08-29 Well Log Performed
1992-08-29 Well Mode changed to Drilled and Cased
1992-08-30 Production Casing Operation Performed
1992-08-30 Rig Released
1992-09-01 Perforation Treatment Performed - Jet Perforation
1992-09-01 Well Began Production
1992-09-01 Well Fluid changed to Crude Oil
1992-09-01 Well Mode changed to Pumping
1992-09-16 Well Log Performed
1993-04-15 Perforation Treatment Performed - Jet Perforation
1993-04-16 Perforation Treatment Performed - Cement Squeeze
1993-04-16 Perforation Treatment Performed - Jet Perforation
1993-04-18 Perforation Treatment Performed - Jet Perforation
2010-03-31 Well Fluid changed to Crude Oil
2010-03-31 Well Mode changed to Suspended
2012-05-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-05-30 Plug Back Performed
2012-05-30 Well Fluid changed to Crude Oil
2012-05-30 Well Log Performed
2012-05-30 Well Mode changed to Abandoned Zone

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1992-08-28 661.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-09-01 Perforation 925.50 928.00 13
1993-04-15 Perforation 936.20 936.50 80
1993-04-16 Perforation 932.70 933.00 80
1993-04-16 Cement Squeeze 925.50 928.00 0
1993-04-18 Perforation 925.00 927.00 13
2012-05-30 Packing Device Capped w/Cement 912.00 920.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 2822 0.0 0.0 0.0
1993 8194 0.0 0.0 0.0
1994 8562 0.0 0.0 0.0
1995 8593 0.0 0.0 0.0
1996 8542 0.0 0.0 0.0
1997 8550 0.0 0.0 0.0
1998 8426 0.0 0.0 0.0
1999 8605 0.0 0.0 0.0
2000 8602 0.0 0.0 0.0
2001 8661 0.0 0.0 0.0
2002 8622 0.0 0.0 0.0
2003 8493 0.0 0.0 0.0
2004 8756 0.0 0.0 0.0
2005 7381 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-05-30 No Incident Encountered 0.00 0.00

For data sources see[7]

References