X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164180907002

Well Details

Well ID: 0164180907002
Loading map...
Location: 00/07-09-016-18W4/2
Location Alias: 00/07-09-16-18 W4M
Location Alias 2: 00/07-09-016-18 W4/02
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 18
Section: 09
County/Municipality: Vulcan County
Well Name: SLE BADGER 7-9-16-18
Operator Name: SanLing Energy Ltd.
License Number: 0242665
License Date: 2000-10-02
License Status: Issued
Spud Date: 2000-10-03
Final Drill Date: 2000-10-10
Well Total Depth: 1198.00 m
Surface Hole Latitude: 50.331045
Surface Hole Longitude: -112.421032

For data sources see[1][2]

Well History

Date Event
2000-10-02 Obtained License
2000-10-04 Surface Casing Operation Performed
2000-10-05 Drill Stem Test Performed
2000-10-10 Drill Stem Test Performed
2000-10-10 Finished Drilling
2000-10-10 Well Mode changed to Drilled and Cased
2000-10-11 Well Log Performed
2000-10-12 Drill Stem Test Performed
2000-10-13 Production Casing Operation Performed
2000-10-13 Rig Released
2000-11-05 Perforation Treatment Performed - Jet Perforation
2000-11-06 Perforation Treatment Performed - Fractured
2000-11-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-11-14 Plug Back Performed
2000-11-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-11-15 Perforation Treatment Performed - Jet Perforation
2000-11-15 Plug Back Performed
2002-03-18 Well Began Production
2002-03-18 Well Fluid changed to Gas
2002-03-18 Well Mode changed to Flowing
2012-11-01 Well Fluid changed to Gas
2012-11-01 Well Mode changed to Suspended
2015-04-23 Well Fluid changed to Gas
2015-04-23 Well Mode changed to Flowing
2019-10-01 Well Fluid changed to Gas
2019-10-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-11-05 Perforation 422.50 423.50 7
2000-11-05 Perforation 431.00 433.00 7
2000-11-05 Perforation 435.00 436.50 7
2000-11-05 Perforation 438.00 440.00 7
2000-11-05 Perforation 445.00 446.50 7
2000-11-06 Fracture 422.50 446.50 0
2000-11-14 Packing Device Capped w/Cement 407.00 415.00 0
2000-11-15 Packing Device Capped w/Cement 397.00 405.00 0
2000-11-15 Perforation 355.00 358.00 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 5355 0.0 0.0 0.0
2003 8680 0.0 0.0 0.0
2004 8770 0.0 0.0 0.0
2005 8543 0.0 0.0 0.0
2006 7250 0.0 0.0 0.0
2007 7806 0.0 0.0 0.0
2008 8396 0.0 0.0 0.0
2009 7233 0.0 0.0 0.0
2010 5551 0.0 0.0 0.0
2011 1203 0.0 0.0 0.0
2015 3771 0.0 0.0 0.0
2016 5613 0.0 0.0 0.0

For data sources see[5]

References