X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164121405000

Well Details

Well ID: 0164121405000
Loading map...
Location: 00/05-14-016-12W4/0
Location Alias: 00/05-14-16-12 W4M
Location Alias 2: 00/05-14-016-12 W4/00
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 12
Section: 14
County/Municipality: County of Newell
Well Name: CARDINAL ALDSON 5-14-16-12
Operator Name: Cardinal Energy Ltd.
License Number: 0168466
License Date: 1994-07-07
License Status: Suspension
Spud Date: 1994-07-15
Final Drill Date: 1994-07-18
Well Total Depth: 1007.00 m
Surface Hole Latitude: 50.344634
Surface Hole Longitude: -111.555926

For data sources see[1][2]

Well History

Date Event
1994-07-07 Obtained License
1994-07-16 Direction Drilling Operation Performed - Deviate
1994-07-16 Surface Casing Operation Performed
1994-07-18 Finished Drilling
1994-07-18 Well Log Performed
1994-07-18 Well Mode changed to Drilled and Cased
1994-07-19 Production Casing Operation Performed
1994-07-19 Rig Released
1994-07-23 Perforation Treatment Performed - Jet Perforation
1994-07-27 Well Began Production
1994-07-27 Well Fluid changed to Crude Oil
1994-07-27 Well Mode changed to Pumping
1994-08-25 Well Log Performed
1994-12-17 Perforation Treatment Performed - Cement Squeeze
1994-12-20 Perforation Treatment Performed - Jet Perforation
1994-12-20 Well Log Performed
1994-12-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-12-21 Well Fluid changed to Crude Oil
1994-12-21 Well Mode changed to Suspended
1995-02-01 Well Began Injection
1995-02-01 Well Fluid changed to Water
1995-02-01 Well Type changed to Disposal
1996-11-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-10-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-10-01 Plug Back Performed
1998-10-01 Well Fluid changed to Water
1998-10-01 Well Mode changed to Abandoned Zone
1998-10-01 Well Type changed to Disposal

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1994-07-16 513.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-07-23 Perforation 983.00 985.00 13
1994-12-17 Cement Squeeze 983.00 985.00 0
1994-12-20 Perforation 987.00 990.00 13
1994-12-21 Acid Treatment 987.00 990.00 0
1996-11-08 Acid Treatment 987.00 990.00 0
1998-10-01 Packing Device Capped w/Cement 971.00 979.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 956 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0

For data sources see[6]

References