X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0164063403003"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0164063403003
 
| Well ID: 0164063403003
| style="height=100%; align=center" rowspan="21" | {{#display_map: 50.377176, -110.76302 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 50.377176, -110.763020 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/03-34-016-06W4/3
 
| Location: 00/03-34-016-06W4/3
Line 43: Line 43:
 
| Surface Hole Latitude: 50.377176
 
| Surface Hole Latitude: 50.377176
 
|-
 
|-
| Surface Hole Longitude: -110.76302
+
| Surface Hole Longitude: -110.763020
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
Line 203: Line 203:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 12:57, 19 January 2021

Well Details

Well ID: 0164063403003
Loading map...
Location: 00/03-34-016-06W4/3
Location Alias: 00/03-34-16-06 W4M
Location Alias 2: 00/03-34-016-06 W4/03
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 06
Section: 34
County/Municipality: Cypress County
Well Name: CVE 9A-28 SH SUFFIELD 9-28-16-6
Operator Name: Ipc Canada Ltd.
License Number: 0333898
License Date: 2005-06-30
License Status: Suspension
Spud Date: 2005-10-14
Final Drill Date: 2005-10-22
Well Total Depth: 1782.00 m
Surface Hole Latitude: 50.377176
Surface Hole Longitude: -110.763020

For data sources see[1][2]

Well History

Date Event
2005-06-30 Obtained License
2005-10-15 Surface Casing Operation Performed
2005-10-18 Direction Drilling Operation Performed - Horizontal
2005-10-20 Intermediate Casing Operation Performed
2005-10-21 Direction Drilling Operation Performed - Horizontal
2005-10-22 Finished Drilling
2005-10-22 Perforation Treatment Performed - Open-Hole Completion
2005-10-22 Well Structure changed to Drain
2005-10-27 Rig Released

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2005-10-18 706.00 Horizontal
2005-10-21 1052.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-10-22 Open Hole/Barefoot Completion 993.00 1782.00 0

For data sources see[5]



References