If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 144: | Line 144: | ||
| style="text-align: right;" | 376.00 | | style="text-align: right;" | 376.00 | ||
| style="text-align: right;" | 10 | | style="text-align: right;" | 10 | ||
+ | |- | ||
+ | | 2004-03-07 | ||
+ | | Fracture | ||
+ | | style="text-align: right;" | 404.40 | ||
+ | | style="text-align: right;" | 406.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2004-03-07 | ||
+ | | Fracture | ||
+ | | style="text-align: right;" | 374.20 | ||
+ | | style="text-align: right;" | 376.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2004-03-07 | ||
+ | | Fracture | ||
+ | | style="text-align: right;" | 328.60 | ||
+ | | style="text-align: right;" | 329.50 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2004-03-07 | ||
+ | | Fracture | ||
+ | | style="text-align: right;" | 312.30 | ||
+ | | style="text-align: right;" | 319.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2004-03-07 | ||
+ | | Fracture | ||
+ | | style="text-align: right;" | 294.30 | ||
+ | | style="text-align: right;" | 294.70 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2004-03-07 | ||
+ | | Fracture | ||
+ | | style="text-align: right;" | 274.40 | ||
+ | | style="text-align: right;" | 275.00 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1979-05-20 | | 1979-05-20 | ||
Line 191: | Line 227: | ||
| style="text-align: right;" | 274.40 | | style="text-align: right;" | 274.40 | ||
| style="text-align: right;" | 329.50 | | style="text-align: right;" | 329.50 | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
Line 399: | Line 399: | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Alberta | + | [[Category:Alberta Wells]] |
Well ID: 0164051903002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.356322,"lon":-110.684405,"icon":""}]} |
Location: 00/03-19-016-05W4/2 | |
Location Alias: 00/03-19-16-05 W4M | |
Location Alias 2: 00/03-19-016-05 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 016 | |
Meridian: 4 | |
Range: 05 | |
Section: 19 | |
County/Municipality: Cypress County | |
Well Name: CVE SUFFIELD 3-19-16-5 | |
Operator Name: Ipc Canada Ltd. | |
License Number: 0072965 | |
License Date: 1978-11-14 | |
License Status: Issued | |
Spud Date: 1978-12-17 | |
Final Drill Date: 1978-12-18 | |
Well Total Depth: 447.00 m | |
Surface Hole Latitude: 50.356322 | |
Surface Hole Longitude: -110.684405 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1978-11-14 | Obtained License |
1978-12-18 | Finished Drilling |
1978-12-18 | Well Mode changed to Drilled and Cased |
1978-12-19 | Production Casing Operation Performed |
1979-05-20 | Perforation Treatment Performed - Jet Perforation |
1979-05-22 | Perforation Treatment Performed - Fractured |
1979-05-26 | Perforation Treatment Performed - Jet Perforation |
1979-06-17 | Perforation Treatment Performed - Fractured |
1982-03-22 | Well Began Production |
1982-03-22 | Well Fluid changed to Gas |
1982-03-22 | Well Mode changed to Flowing |
1998-11-01 | Well Structure changed to Commingled |
2004-03-03 | Well Log Performed |
2004-03-07 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1979-05-20 | Perforation | 374.20 | 376.00 | 10 |
2004-03-07 | Fracture | 404.40 | 406.00 | 0 |
2004-03-07 | Fracture | 374.20 | 376.00 | 0 |
2004-03-07 | Fracture | 328.60 | 329.50 | 0 |
2004-03-07 | Fracture | 312.30 | 319.00 | 0 |
2004-03-07 | Fracture | 294.30 | 294.70 | 0 |
2004-03-07 | Fracture | 274.40 | 275.00 | 0 |
1979-05-20 | Perforation | 404.40 | 406.00 | 3 |
1979-05-22 | Fracture | 374.20 | 406.00 | 0 |
1979-05-26 | Perforation | 274.40 | 275.00 | 3 |
1979-05-26 | Perforation | 294.30 | 294.70 | 3 |
1979-05-26 | Perforation | 312.30 | 313.90 | 3 |
1979-05-26 | Perforation | 315.50 | 319.00 | 3 |
1979-05-26 | Perforation | 328.60 | 329.50 | 3 |
1979-06-17 | Fracture | 274.40 | 329.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1982 | 6423 | 0.0 | 0.0 | 0.0 |
1983 | 8616 | 0.0 | 0.0 | 0.0 |
1984 | 8780 | 0.0 | 0.0 | 0.0 |
1985 | 8750 | 0.0 | 0.0 | 0.0 |
1986 | 8759 | 0.0 | 0.0 | 0.0 |
1987 | 8749 | 0.0 | 0.0 | 0.0 |
1988 | 8778 | 0.0 | 0.0 | 0.0 |
1989 | 8759 | 0.0 | 0.0 | 0.0 |
1990 | 8711 | 0.0 | 0.0 | 0.0 |
1991 | 8759 | 0.0 | 0.0 | 0.0 |
1992 | 8768 | 0.0 | 0.0 | 0.0 |
1993 | 8759 | 0.0 | 0.0 | 0.0 |
1994 | 8759 | 0.0 | 0.0 | 0.0 |
1995 | 8759 | 0.0 | 0.0 | 0.0 |
1996 | 8783 | 0.0 | 0.0 | 0.0 |
1997 | 8759 | 0.0 | 0.0 | 0.0 |
1998 | 7295 | 0.0 | 0.0 | 0.0 |
For data sources see[5]