X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0154261707002"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0154261707002
 
| Well ID: 0154261707002
| style="height=100%; align=center" rowspan="14" | {{#display_map: 50.256308, -113.540185 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 50.256308, -113.540185 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/07-17-015-26W4/2
 
| Location: 00/07-17-015-26W4/2
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/07-17-015-26 W4/02
 
| Location Alias 2: 00/07-17-015-26 W4/02
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 015
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 26
 +
|-
 +
| Section: 17
 
|-
 
|-
 
| County/Municipality: [[Municipal District of Willow Creek No. 26,_Alberta|Municipal District of Willow Creek No. 26]]
 
| County/Municipality: [[Municipal District of Willow Creek No. 26,_Alberta|Municipal District of Willow Creek No. 26]]
Line 17: Line 27:
 
| Well Name: LTAM PARKLDNE 7-17-15-26
 
| Well Name: LTAM PARKLDNE 7-17-15-26
 
|-
 
|-
| Operator Name: [[Signalta Resources Limited]]
+
| Operator Name: [[Long Term Asset Management Inc.]]
 
|-
 
|-
 
| License Number: 0060411
 
| License Number: 0060411
Line 23: Line 33:
 
| License Date: 1976-09-29
 
| License Date: 1976-09-29
 
|-
 
|-
| License Status: Suspension
+
| License Status: Abandoned
 
|-
 
|-
 
| Spud Date: 1976-09-30
 
| Spud Date: 1976-09-30
Line 29: Line 39:
 
| Final Drill Date: 1976-11-02
 
| Final Drill Date: 1976-11-02
 
|-
 
|-
| Well Total Depth: 2209.8 m
+
| Well Total Depth: 2209.80 m
 
|-
 
|-
 
| Surface Hole Latitude: 50.256308
 
| Surface Hole Latitude: 50.256308
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1976-09-29
 +
| Obtained License
 +
|-
 +
| 1976-10-11
 +
| Drill Stem Test Performed
 +
|-
 +
| 1976-10-27
 +
| Drill Stem Test Performed
 +
|-
 +
| 1976-11-02
 +
| Finished Drilling
 +
|-
 +
| 1976-11-03
 +
| Drill Stem Test Performed
 +
|-
 +
| 1976-11-04
 +
| Drill Stem Test Performed
 +
|-
 +
| 1976-11-05
 +
| Production Casing Operation Performed
 +
|-
 +
| 1976-11-15
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1976-11-16
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1982-08-12
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1982-08-12
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1982-08-14
 +
| Perforation Treatment Performed - Acid Wash - No Pressure
 +
|-
 +
| 1982-08-26
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1998-11-05
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1998-11-05
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1998-11-07
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1998-11-07
 +
| Well Log Performed
 +
|-
 +
| 1998-11-13
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1998-11-17
 +
| Well Log Performed
 +
|-
 +
| 1999-06-22
 +
| Well Began Production
 +
|-
 +
| 1999-06-22
 +
| Well Fluid changed to Gas
 +
|-
 +
| 1999-06-22
 +
| Well Mode changed to Flowing
 +
|-
 +
| 2003-09-30
 +
| Well Fluid changed to Gas
 +
|-
 +
| 2003-09-30
 +
| Well Mode changed to Suspended
 +
|-
 +
| 2004-04-01
 +
| Well Fluid changed to Gas
 +
|-
 +
| 2004-04-01
 +
| Well Mode changed to Flowing
 +
|-
 +
| 2007-03-21
 +
| Well Fluid changed to Gas
 +
|-
 +
| 2007-03-21
 +
| Well Mode changed to Suspended
 +
|-
 +
| 2019-10-18
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2019-10-18
 +
| Plug Back Performed
 +
|-
 +
| 2019-10-19
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2019-10-19
 +
| Plug Back Performed
 +
|-
 +
| 2019-10-19
 +
| Well Fluid changed to Gas
 +
|-
 +
| 2019-10-19
 +
| Well Log Performed
 +
|-
 +
| 2019-10-19
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 2019-10-20
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2019-10-20
 +
| Well Log Performed
 +
|-
 +
| 2019-10-21
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2019-10-21
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2019-10-21
 +
| Plug Back Performed
 +
|-
 +
| 2019-10-21
 +
| Well Log Performed
 +
|-
 +
| 2019-10-22
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2019-10-22
 +
| Plug Back Performed
 +
|-
 +
| 2019-10-23
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2019-10-23
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2019-10-23
 +
| Plug Back Performed
 +
|-
 +
| 2019-10-23
 +
| Well Log Performed
 +
|-
 +
| 2019-10-24
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2019-10-24
 +
| Plug Back Performed
 +
|-
 +
| 2019-10-26
 +
| Well Abandoned
 +
|-
 +
| 2019-10-26
 +
| Well Fluid changed to Gas
 +
|-
 +
| 2019-10-26
 +
| Well Mode changed to Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 255:
 
| 1976-11-15
 
| 1976-11-15
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2075.7
+
| style="text-align: right;" | 2075.70
| style="text-align: right;" | 2078.1
+
| style="text-align: right;" | 2078.10
 
| style="text-align: right;" | 3
 
| style="text-align: right;" | 3
 
|-
 
|-
 
| 1976-11-16
 
| 1976-11-16
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 2075.7
+
| style="text-align: right;" | 2075.70
| style="text-align: right;" | 2078.1
+
| style="text-align: right;" | 2078.10
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1982-08-12
 
| 1982-08-12
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 2069
+
| style="text-align: right;" | 2069.00
| style="text-align: right;" | 2072
+
| style="text-align: right;" | 2072.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1982-08-12
 
| 1982-08-12
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2062.6
+
| style="text-align: right;" | 2062.60
| style="text-align: right;" | 2064.1
+
| style="text-align: right;" | 2064.10
 
| style="text-align: right;" | 10
 
| style="text-align: right;" | 10
 
|-
 
|-
 
| 1982-08-14
 
| 1982-08-14
| Acid Wash
+
| Acid Wash
| style="text-align: right;" | 2062.6
+
| style="text-align: right;" | 2062.60
| style="text-align: right;" | 2064.1
+
| style="text-align: right;" | 2064.10
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1998-11-05
 
| 1998-11-05
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2075.7
+
| style="text-align: right;" | 2075.70
| style="text-align: right;" | 2078.1
+
| style="text-align: right;" | 2078.10
 
| style="text-align: right;" | 3
 
| style="text-align: right;" | 3
 
|-
 
|-
 
| 1998-11-07
 
| 1998-11-07
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2062.6
+
| style="text-align: right;" | 2062.60
| style="text-align: right;" | 2065.6
+
| style="text-align: right;" | 2065.60
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1998-11-07
 
| 1998-11-07
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2075.7
+
| style="text-align: right;" | 2075.70
| style="text-align: right;" | 2078.1
+
| style="text-align: right;" | 2078.10
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1998-11-13
 
| 1998-11-13
| Fracture  
+
| Fracture
| style="text-align: right;" | 2062.6
+
| style="text-align: right;" | 2062.60
| style="text-align: right;" | 2078.1
+
| style="text-align: right;" | 2078.10
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-10-18
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 2066.50
 +
| style="text-align: right;" | 2074.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-10-19
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 2055.00
 +
| style="text-align: right;" | 2067.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-10-20
 +
| Perforation
 +
| style="text-align: right;" | 1210.00
 +
| style="text-align: right;" | 1212.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2019-10-20
 +
| Perforation
 +
| style="text-align: right;" | 861.00
 +
| style="text-align: right;" | 863.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2019-10-21
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1195.00
 +
| style="text-align: right;" | 1203.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-10-21
 +
| Perforation
 +
| style="text-align: right;" | 631.00
 +
| style="text-align: right;" | 633.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2019-10-22
 +
| Cement Squeeze
 +
| style="text-align: right;" | 861.00
 +
| style="text-align: right;" | 863.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-10-22
 +
| Cement Squeeze
 +
| style="text-align: right;" | 631.00
 +
| style="text-align: right;" | 633.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-10-23
 +
| Perforation
 +
| style="text-align: right;" | 345.00
 +
| style="text-align: right;" | 347.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2019-10-23
 +
| Perforation
 +
| style="text-align: right;" | 260.00
 +
| style="text-align: right;" | 262.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2019-10-23
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 332.00
 +
| style="text-align: right;" | 340.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-10-24
 +
| Cement Squeeze
 +
| style="text-align: right;" | 260.00
 +
| style="text-align: right;" | 262.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 130: Line 383:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Job Start Date
!scope="col" | Chemical Name
+
!scope="col" | Job End Date
!scope="col" style="text-align: right;" | CAS Number
+
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 163: Line 430:
 
| 1999
 
| 1999
 
| style="text-align: right;" | 4291
 
| style="text-align: right;" | 4291
| style="text-align: right;" | 615.1
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 5.1
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2000
 
| 2000
 
| style="text-align: right;" | 7077
 
| style="text-align: right;" | 7077
| style="text-align: right;" | 502.2
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 63.1
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2001
 
| 2001
 
| style="text-align: right;" | 7627
 
| style="text-align: right;" | 7627
| style="text-align: right;" | 391.3
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 75.8
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2002
 
| 2002
 
| style="text-align: right;" | 5535
 
| style="text-align: right;" | 5535
| style="text-align: right;" | 346.3
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 12.0
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2003
 
| 2003
 
| style="text-align: right;" | 2860
 
| style="text-align: right;" | 2860
| style="text-align: right;" | 308.8
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 53.5
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2004
 
| 2004
 
| style="text-align: right;" | 840
 
| style="text-align: right;" | 840
| style="text-align: right;" | 138.3
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 54.5
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2005
 
| 2005
 
| style="text-align: right;" | 6877
 
| style="text-align: right;" | 6877
| style="text-align: right;" | 466.3
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 87.0
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2006
 
| 2006
 
| style="text-align: right;" | 7512
 
| style="text-align: right;" | 7512
| style="text-align: right;" | 252.9
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 20.0
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2007
 
| 2007
 
| style="text-align: right;" | 1506
 
| style="text-align: right;" | 1506
| style="text-align: right;" | 45.7
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 219: Line 486:
 
  | title = Well Production Data - All Alberta
 
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-04-24
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
<!--== Occurences ==
+
== Occurences ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Occurence Date
 
!scope="col" | Occurence Date
Line 229: Line 496:
 
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 
|-
 
|-
|}-->
+
| 2019-10-26
 
+
| No Incident Encountered
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0.00
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Occurence Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Alberta]][[Category:Wells]]
 
[[Category:Alberta]][[Category:Wells]]

Revision as of 00:09, 12 July 2020

Well Details

Well ID: 0154261707002
Loading map...
Location: 00/07-17-015-26W4/2
Location Alias: 00/07-17-15-26 W4M
Location Alias 2: 00/07-17-015-26 W4/02
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 26
Section: 17
County/Municipality: Municipal District of Willow Creek No. 26
Well Name: LTAM PARKLDNE 7-17-15-26
Operator Name: Long Term Asset Management Inc.
License Number: 0060411
License Date: 1976-09-29
License Status: Abandoned
Spud Date: 1976-09-30
Final Drill Date: 1976-11-02
Well Total Depth: 2209.80 m
Surface Hole Latitude: 50.256308
Surface Hole Longitude: -113.540185

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-09-29 Obtained License
1976-10-11 Drill Stem Test Performed
1976-10-27 Drill Stem Test Performed
1976-11-02 Finished Drilling
1976-11-03 Drill Stem Test Performed
1976-11-04 Drill Stem Test Performed
1976-11-05 Production Casing Operation Performed
1976-11-15 Perforation Treatment Performed - Jet Perforation
1976-11-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-08-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-08-12 Perforation Treatment Performed - Jet Perforation
1982-08-14 Perforation Treatment Performed - Acid Wash - No Pressure
1982-08-26 Well Mode changed to Drilled and Cased
1998-11-05 Perforation Treatment Performed - Jet Perforation
1998-11-05 Well Mode changed to Drilled and Cased
1998-11-07 Perforation Treatment Performed - Jet Perforation
1998-11-07 Well Log Performed
1998-11-13 Perforation Treatment Performed - Fractured
1998-11-17 Well Log Performed
1999-06-22 Well Began Production
1999-06-22 Well Fluid changed to Gas
1999-06-22 Well Mode changed to Flowing
2003-09-30 Well Fluid changed to Gas
2003-09-30 Well Mode changed to Suspended
2004-04-01 Well Fluid changed to Gas
2004-04-01 Well Mode changed to Flowing
2007-03-21 Well Fluid changed to Gas
2007-03-21 Well Mode changed to Suspended
2019-10-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-10-18 Plug Back Performed
2019-10-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-10-19 Plug Back Performed
2019-10-19 Well Fluid changed to Gas
2019-10-19 Well Log Performed
2019-10-19 Well Mode changed to Abandoned Zone
2019-10-20 Perforation Treatment Performed - Jet Perforation
2019-10-20 Well Log Performed
2019-10-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-10-21 Perforation Treatment Performed - Jet Perforation
2019-10-21 Plug Back Performed
2019-10-21 Well Log Performed
2019-10-22 Perforation Treatment Performed - Cement Squeeze
2019-10-22 Plug Back Performed
2019-10-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-10-23 Perforation Treatment Performed - Jet Perforation
2019-10-23 Plug Back Performed
2019-10-23 Well Log Performed
2019-10-24 Perforation Treatment Performed - Cement Squeeze
2019-10-24 Plug Back Performed
2019-10-26 Well Abandoned
2019-10-26 Well Fluid changed to Gas
2019-10-26 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-11-15 Perforation 2075.70 2078.10 3
1976-11-16 Acid Treatment 2075.70 2078.10 0
1982-08-12 Packing Device Capped w/Cement 2069.00 2072.00 0
1982-08-12 Perforation 2062.60 2064.10 10
1982-08-14 Acid Wash 2062.60 2064.10 0
1998-11-05 Perforation 2075.70 2078.10 3
1998-11-07 Perforation 2062.60 2065.60 13
1998-11-07 Perforation 2075.70 2078.10 13
1998-11-13 Fracture 2062.60 2078.10 0
2019-10-18 Packing Device Capped w/Cement 2066.50 2074.50 0
2019-10-19 Packing Device Capped w/Cement 2055.00 2067.00 0
2019-10-20 Perforation 1210.00 1212.00 17
2019-10-20 Perforation 861.00 863.00 17
2019-10-21 Packing Device Capped w/Cement 1195.00 1203.00 0
2019-10-21 Perforation 631.00 633.00 17
2019-10-22 Cement Squeeze 861.00 863.00 0
2019-10-22 Cement Squeeze 631.00 633.00 0
2019-10-23 Perforation 345.00 347.00 17
2019-10-23 Perforation 260.00 262.00 17
2019-10-23 Packing Device Capped w/Cement 332.00 340.00 0
2019-10-24 Cement Squeeze 260.00 262.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 4291 0.0 0.0 0.0
2000 7077 0.0 0.0 0.0
2001 7627 0.0 0.0 0.0
2002 5535 0.0 0.0 0.0
2003 2860 0.0 0.0 0.0
2004 840 0.0 0.0 0.0
2005 6877 0.0 0.0 0.0
2006 7512 0.0 0.0 0.0
2007 1506 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-10-26 No Incident Encountered 0.00 0.00

For data sources see[6]

References