X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0154160707002"

m
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0154160707002
 
| Well ID: 0154160707002
| style="height=100%; align=center" rowspan="14" | {{#display_map: 50.242722, -112.18957 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 50.242722, -112.189570 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/07-07-015-16W4/2
 
| Location: 00/07-07-015-16W4/2
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/07-07-015-16 W4/02
 
| Location Alias 2: 00/07-07-015-16 W4/02
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 015
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 16
 +
|-
 +
| Section: 07
 
|-
 
|-
 
| County/Municipality: [[Municipal District of Taber,_Alberta|Municipal District of Taber]]
 
| County/Municipality: [[Municipal District of Taber,_Alberta|Municipal District of Taber]]
Line 17: Line 27:
 
| Well Name: AMOCO CANPAR ENCHANT 7-7-15-16
 
| Well Name: AMOCO CANPAR ENCHANT 7-7-15-16
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[ConocoPhillips Canada Resources Corp.]]
 
|-
 
|-
 
| License Number: 0031167
 
| License Number: 0031167
Line 29: Line 39:
 
| Final Drill Date: 1966-11-06
 
| Final Drill Date: 1966-11-06
 
|-
 
|-
| Well Total Depth: 1080.5 m
+
| Well Total Depth: 1080.50 m
 
|-
 
|-
 
| Surface Hole Latitude: 50.242722
 
| Surface Hole Latitude: 50.242722
 
|-
 
|-
| Surface Hole Longitude: -112.18957
+
| Surface Hole Longitude: -112.189570
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1966-10-19
 +
| Obtained License
 +
|-
 +
| 1966-11-06
 +
| Finished Drilling
 +
|-
 +
| 1966-11-07
 +
| Drill Stem Test Performed
 +
|-
 +
| 1966-11-09
 +
| Drill Stem Test Performed
 +
|-
 +
| 1966-11-10
 +
| Drill Stem Test Performed
 +
|-
 +
| 1966-11-11
 +
| Production Casing Operation Performed
 +
|-
 +
| 1967-07-29
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1967-07-29
 +
| Perforation Treatment Performed - Acid Wash - No Pressure
 +
|-
 +
| 1967-07-29
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1970-07-27
 +
| Perforation Treatment Performed - Acid Wash - No Pressure
 +
|-
 +
| 1970-07-27
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1970-07-28
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1970-07-30
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1970-08-01
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1970-08-11
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1970-08-14
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1970-12-21
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1994-02-15
 +
| Well Began Production
 +
|-
 +
| 1994-02-15
 +
| Well Fluid changed to Gas
 +
|-
 +
| 1994-02-15
 +
| Well Mode changed to Flowing
 +
|-
 +
| 1996-02-27
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1996-02-27
 +
| Plug Back Performed
 +
|-
 +
| 1996-02-27
 +
| Well Fluid changed to Gas
 +
|-
 +
| 1996-02-27
 +
| Well Mode changed to Abandoned
 +
|-
 +
| 1996-02-28
 +
| Well Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 174:
 
| 1967-07-29
 
| 1967-07-29
 
| Perforation
 
| Perforation
| style="text-align: right;" | 758.3
+
| style="text-align: right;" | 758.30
| style="text-align: right;" | 759.9
+
| style="text-align: right;" | 759.90
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1970-08-11
 +
| Cement Squeeze
 +
| style="text-align: right;" | 758.30
 +
| style="text-align: right;" | 759.90
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1970-08-14
 +
| Perforation
 +
| style="text-align: right;" | 1004.30
 +
| style="text-align: right;" | 1006.10
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1970-08-14
 +
| Perforation
 +
| style="text-align: right;" | 990.60
 +
| style="text-align: right;" | 993.00
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 +
|-
 +
| 1996-02-27
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 975.80
 +
| style="text-align: right;" | 983.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1996-02-27
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 737.00
 +
| style="text-align: right;" | 745.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1967-07-29
 
| 1967-07-29
| Acid Wash
+
| Acid Wash
| style="text-align: right;" | 758.3
+
| style="text-align: right;" | 758.30
| style="text-align: right;" | 759.9
+
| style="text-align: right;" | 759.90
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1967-07-29
 
| 1967-07-29
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 758.3
+
| style="text-align: right;" | 758.30
| style="text-align: right;" | 759.9
+
| style="text-align: right;" | 759.90
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1970-07-27
 
| 1970-07-27
 
| Perforation
 
| Perforation
| style="text-align: right;" | 764.4
+
| style="text-align: right;" | 764.40
| style="text-align: right;" | 764.7
+
| style="text-align: right;" | 764.70
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1970-07-27
 
| 1970-07-27
| Acid Wash
+
| Acid Wash
| style="text-align: right;" | 764.4
+
| style="text-align: right;" | 764.40
| style="text-align: right;" | 764.7
+
| style="text-align: right;" | 764.70
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1970-07-28
 
| 1970-07-28
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 764.4
+
| style="text-align: right;" | 764.40
| style="text-align: right;" | 764.7
+
| style="text-align: right;" | 764.70
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1970-07-30
 
| 1970-07-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 758.3
+
| style="text-align: right;" | 758.30
| style="text-align: right;" | 759.9
+
| style="text-align: right;" | 759.90
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1970-07-30
 
| 1970-07-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 758.3
+
| style="text-align: right;" | 758.30
| style="text-align: right;" | 759.9
+
| style="text-align: right;" | 759.90
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1970-08-01
 
| 1970-08-01
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 758.3
+
| style="text-align: right;" | 758.30
| style="text-align: right;" | 759.9
+
| style="text-align: right;" | 759.90
| style="text-align: right;" | 0
 
|-
 
| 1970-08-11
 
| Cement Squeeze
 
| style="text-align: right;" | 758.3
 
| style="text-align: right;" | 759.9
 
| style="text-align: right;" | 0
 
|-
 
| 1970-08-14
 
| Perforation
 
| style="text-align: right;" | 1004.3
 
| style="text-align: right;" | 1006.1
 
| style="text-align: right;" | 7
 
|-
 
| 1970-08-14
 
| Perforation
 
| style="text-align: right;" | 990.6
 
| style="text-align: right;" | 993
 
| style="text-align: right;" | 7
 
|-
 
| 1996-02-27
 
| Packing Device Capped w/Cement
 
| style="text-align: right;" | 975.8
 
| style="text-align: right;" | 983.8
 
| style="text-align: right;" | 0
 
|-
 
| 1996-02-27
 
| Packing Device Capped w/Cement
 
| style="text-align: right;" | 737
 
| style="text-align: right;" | 745
 
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 160: Line 260:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Trade Name
!scope="col" | Chemical Name
+
!scope="col" | Supplier
!scope="col" style="text-align: right;" | CAS Number
 
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 193: Line 307:
 
| 1994
 
| 1994
 
| style="text-align: right;" | 705
 
| style="text-align: right;" | 705
| style="text-align: right;" | 144.8
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 201: Line 315:
 
  | title = Well Production Data - All Alberta
 
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-04-24
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Occurences ==
 
<!--== Occurences ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 216: Line 330:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 09:37, 19 January 2021

Well Details

Well ID: 0154160707002
Loading map...
Location: 00/07-07-015-16W4/2
Location Alias: 00/07-07-15-16 W4M
Location Alias 2: 00/07-07-015-16 W4/02
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 16
Section: 07
County/Municipality: Municipal District of Taber
Well Name: AMOCO CANPAR ENCHANT 7-7-15-16
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0031167
License Date: 1966-10-19
License Status: RecCertified
Spud Date: 1966-10-30
Final Drill Date: 1966-11-06
Well Total Depth: 1080.50 m
Surface Hole Latitude: 50.242722
Surface Hole Longitude: -112.189570

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-10-19 Obtained License
1966-11-06 Finished Drilling
1966-11-07 Drill Stem Test Performed
1966-11-09 Drill Stem Test Performed
1966-11-10 Drill Stem Test Performed
1966-11-11 Production Casing Operation Performed
1967-07-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-07-29 Perforation Treatment Performed - Acid Wash - No Pressure
1967-07-29 Perforation Treatment Performed - Jet Perforation
1970-07-27 Perforation Treatment Performed - Acid Wash - No Pressure
1970-07-27 Perforation Treatment Performed - Jet Perforation
1970-07-28 Perforation Treatment Performed - Cement Squeeze
1970-07-30 Perforation Treatment Performed - Jet Perforation
1970-08-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-08-11 Perforation Treatment Performed - Cement Squeeze
1970-08-14 Perforation Treatment Performed - Jet Perforation
1970-12-21 Well Mode changed to Drilled and Cased
1994-02-15 Well Began Production
1994-02-15 Well Fluid changed to Gas
1994-02-15 Well Mode changed to Flowing
1996-02-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-02-27 Plug Back Performed
1996-02-27 Well Fluid changed to Gas
1996-02-27 Well Mode changed to Abandoned
1996-02-28 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-07-29 Perforation 758.30 759.90 7
1970-08-11 Cement Squeeze 758.30 759.90 0
1970-08-14 Perforation 1004.30 1006.10 7
1970-08-14 Perforation 990.60 993.00 7
1996-02-27 Packing Device Capped w/Cement 975.80 983.80 0
1996-02-27 Packing Device Capped w/Cement 737.00 745.00 0
1967-07-29 Acid Wash 758.30 759.90 0
1967-07-29 Acid Treatment 758.30 759.90 0
1970-07-27 Perforation 764.40 764.70 13
1970-07-27 Acid Wash 764.40 764.70 0
1970-07-28 Cement Squeeze 764.40 764.70 0
1970-07-30 Perforation 758.30 759.90 13
1970-07-30 Perforation 758.30 759.90 13
1970-08-01 Acid Treatment 758.30 759.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 705 0.0 0.0 0.0

For data sources see[5]

References