X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144251906002

Well Details

Well ID: 0144251906002
Loading map...
Location: 00/06-19-014-25W4/2
Location Alias: 00/06-19-14-25 W4M
Location Alias 2: 00/06-19-014-25 W4/02
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 25
Section: 19
County/Municipality: Municipal District of Willow Creek No. 26
Well Name: RAMPART PARKLDNE 6-19-14-25
Operator Name: Rampart Oil Inc.
License Number: 0268293
License Date: 2002-03-04
License Status: Amended
Spud Date: 2002-03-10
Final Drill Date: 2002-03-25
Well Total Depth: 2071.00 m
Surface Hole Latitude: 50.185531
Surface Hole Longitude: -113.410963

For data sources see[1][2]

Well History

Date Event
2002-03-04 Obtained License
2002-03-11 Surface Casing Operation Performed
2002-03-16 Direction Drilling Operation Performed - Deviate
2002-03-25 Finished Drilling
2002-03-25 Well Log Performed
2002-03-25 Well Mode changed to Drilled and Cased
2002-03-26 Production Casing Operation Performed
2002-03-27 Rig Released
2002-06-16 Well Log Performed
2002-06-17 Perforation Treatment Performed - Jet Perforation
2002-06-17 Well Log Performed
2002-06-22 Perforation Treatment Performed - Jet Perforation
2002-06-22 Well Log Performed
2002-06-25 Perforation Treatment Performed - Cement Squeeze
2002-06-25 Plug Back Performed
2002-06-25 Well Mode changed to Abandoned Zone
2003-02-25 Perforation Treatment Performed - Cement Squeeze
2003-02-25 Perforation Treatment Performed - Jet Perforation
2003-02-25 Plug Back Performed
2003-02-27 Perforation Treatment Performed - Jet Perforation
2016-10-08 Perforation Treatment Performed - Fractured

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2002-03-16 1387.90 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-06-17 Perforation 2017.00 2033.00 17
2002-06-22 Perforation 1753.00 1757.00 17
2002-06-25 Cement Squeeze 1753.00 1757.00 0
2003-02-25 Perforation 1753.00 1757.00 17
2003-02-25 Cement Squeeze 1753.00 1757.00 0
2003-02-27 Perforation 2017.00 2033.00 17
2016-10-08 Fracture 2017.00 2033.00 0

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-10-14 No Incident Encountered 0.00 0.00

For data sources see[6]

References