X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0144020908003"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0144020908003
 
| Well ID: 0144020908003
| style="height=100%; align=center" rowspan="14" | {{#display_map: 50.1542880000000082, -110.21421199999997498 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 50.154288, -110.214212 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/08-09-014-02W4/3
 
| Location: 00/08-09-014-02W4/3
 
|-
 
|-
| Well Name: DEML MEDHAT 8-9-14-2
+
| Location Alias: 00/08-09-14-02 W4M
 +
|-
 +
| Location Alias 2: 00/08-09-014-02 W4/03
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 014
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 02
 +
|-
 +
| Section: 09
 +
|-
 +
| County/Municipality: [[Cypress County,_Alberta|Cypress County]]
 +
|-
 +
| Well Name: Canlin MEDHAT 8-9-14-2
 +
|-
 +
| Operator Name: [[Canlin Energy Corporation]]
 +
|-
 +
| License Number: 0095800
 
|-
 
|-
 
| License Date: 1982-05-03
 
| License Date: 1982-05-03
 
|-
 
|-
| Final Drilling Date: 1982-05-10
+
| License Status: Issued
 
|-
 
|-
| Total Depth: 681.0m
+
| Spud Date: 1982-05-09
 
|-
 
|-
| Fluid Type: Gas
+
| Final Drill Date: 1982-05-10
 
|-
 
|-
| Status: Flowing
+
| Well Total Depth: 681.00 m
 
|-
 
|-
| Well Type: Not Applicable
+
| Surface Hole Latitude: 50.154288
 
|-
 
|-
| Configuration: Vertical
+
| Surface Hole Longitude: -110.214212
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1982-05-03
 +
| Obtained License
 +
|-
 +
| 1982-05-10
 +
| Finished Drilling
 +
|-
 +
| 1982-05-10
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1982-05-11
 +
| Production Casing Operation Performed
 +
|-
 +
| 1982-05-31
 +
| Perforation Treatment Performed - Jet Perforation
 
|-
 
|-
| Latitude: 50.1542880000000082
+
| 1982-06-02
 +
| Perforation Treatment Performed - Fractured
 
|-
 
|-
| Longitude: -110.21421199999997498
+
| 1982-06-07
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 
|-
 
|-
 +
| 1982-06-07
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1982-06-08
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1982-06-10
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1982-06-10
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1988-01-15
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1988-01-15
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1988-01-19
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1988-01-22
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1988-01-25
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1988-02-02
 +
| Well Log Performed
 +
|-
 +
| 2006-05-04
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2006-05-06
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2006-07-25
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2006-10-06
 +
| Well Began Production
 +
|-
 +
| 2006-10-06
 +
| Well Fluid changed to Gas
 +
|-
 +
| 2006-10-06
 +
| Well Mode changed to Flowing
 +
|-
 +
| 2007-08-01
 +
| Well Fluid changed to Gas
 +
|-
 +
| 2007-08-01
 +
| Well Mode changed to Flowing
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
  
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 1982-05-31
 +
| Perforation
 +
| style="text-align: right;" | 623.50
 +
| style="text-align: right;" | 624.50
 +
| style="text-align: right;" | 5
 +
|-
 +
| 1982-05-31
 +
| Perforation
 +
| style="text-align: right;" | 625.50
 +
| style="text-align: right;" | 627.00
 +
| style="text-align: right;" | 5
 +
|-
 +
| 1982-06-02
 +
| Fracture
 +
| style="text-align: right;" | 623.50
 +
| style="text-align: right;" | 627.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1982-06-07
 +
| Perforation
 +
| style="text-align: right;" | 443.00
 +
| style="text-align: right;" | 445.50
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1982-06-07
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 607.00
 +
| style="text-align: right;" | 615.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1982-06-08
 +
| Fracture
 +
| style="text-align: right;" | 443.00
 +
| style="text-align: right;" | 445.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1982-06-10
 +
| Perforation
 +
| style="text-align: right;" | 373.00
 +
| style="text-align: right;" | 375.50
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1982-06-10
 +
| Fracture
 +
| style="text-align: right;" | 373.00
 +
| style="text-align: right;" | 375.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1988-01-15
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 438.00
 +
| style="text-align: right;" | 440.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1988-01-15
 +
| Perforation
 +
| style="text-align: right;" | 365.00
 +
| style="text-align: right;" | 368.00
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1988-01-19
 +
| Fracture
 +
| style="text-align: right;" | 365.00
 +
| style="text-align: right;" | 368.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1988-01-22
 +
| Perforation
 +
| style="text-align: right;" | 329.00
 +
| style="text-align: right;" | 335.00
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1988-01-22
 +
| Perforation
 +
| style="text-align: right;" | 345.00
 +
| style="text-align: right;" | 349.00
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1988-01-25
 +
| Fracture
 +
| style="text-align: right;" | 329.00
 +
| style="text-align: right;" | 349.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2006-05-04
 +
| Perforation
 +
| style="text-align: right;" | 345.00
 +
| style="text-align: right;" | 349.00
 +
| style="text-align: right;" | 7
 +
|-
 +
| 2006-05-04
 +
| Perforation
 +
| style="text-align: right;" | 365.00
 +
| style="text-align: right;" | 368.00
 +
| style="text-align: right;" | 7
 +
|-
 +
| 2006-05-04
 +
| Perforation
 +
| style="text-align: right;" | 373.00
 +
| style="text-align: right;" | 375.00
 +
| style="text-align: right;" | 7
 +
|-
 +
| 2006-05-06
 +
| Perforation
 +
| style="text-align: right;" | 466.00
 +
| style="text-align: right;" | 467.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-05-06
 +
| Perforation
 +
| style="text-align: right;" | 465.00
 +
| style="text-align: right;" | 466.00
 +
| style="text-align: right;" | 7
 +
|-
 +
| 2006-05-06
 +
| Perforation
 +
| style="text-align: right;" | 464.00
 +
| style="text-align: right;" | 465.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-05-06
 +
| Perforation
 +
| style="text-align: right;" | 463.50
 +
| style="text-align: right;" | 464.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-07-25
 +
| Fracture
 +
| style="text-align: right;" | 463.50
 +
| style="text-align: right;" | 467.00
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 2007
 +
| style="text-align: right;" | 8661
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2008
 +
| style="text-align: right;" | 8320
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2009
 +
| style="text-align: right;" | 8641
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2010
 +
| style="text-align: right;" | 8232
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2011
 +
| style="text-align: right;" | 8695
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2012
 +
| style="text-align: right;" | 8688
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2013
 +
| style="text-align: right;" | 8759
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2014
 +
| style="text-align: right;" | 8759
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2015
 +
| style="text-align: right;" | 8759
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2016
 +
| style="text-align: right;" | 8783
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2017
 +
| style="text-align: right;" | 8759
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2018
 +
| style="text-align: right;" | 8123
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2019
 +
| style="text-align: right;" | 7502
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2020
 +
| style="text-align: right;" | 1390
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = ST37: List of Wells in Alberta
+
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2015-07-02
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2015-07-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
 
==References==
 
==References==
 
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta]][[Category:Wells]]

Revision as of 12:41, 10 July 2020

Well Details

Well ID: 0144020908003
Loading map...
Location: 00/08-09-014-02W4/3
Location Alias: 00/08-09-14-02 W4M
Location Alias 2: 00/08-09-014-02 W4/03
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 02
Section: 09
County/Municipality: Cypress County
Well Name: Canlin MEDHAT 8-9-14-2
Operator Name: Canlin Energy Corporation
License Number: 0095800
License Date: 1982-05-03
License Status: Issued
Spud Date: 1982-05-09
Final Drill Date: 1982-05-10
Well Total Depth: 681.00 m
Surface Hole Latitude: 50.154288
Surface Hole Longitude: -110.214212

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-05-03 Obtained License
1982-05-10 Finished Drilling
1982-05-10 Well Mode changed to Drilled and Cased
1982-05-11 Production Casing Operation Performed
1982-05-31 Perforation Treatment Performed - Jet Perforation
1982-06-02 Perforation Treatment Performed - Fractured
1982-06-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-06-07 Perforation Treatment Performed - Jet Perforation
1982-06-08 Perforation Treatment Performed - Fractured
1982-06-10 Perforation Treatment Performed - Fractured
1982-06-10 Perforation Treatment Performed - Jet Perforation
1988-01-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-01-15 Perforation Treatment Performed - Jet Perforation
1988-01-19 Perforation Treatment Performed - Fractured
1988-01-22 Perforation Treatment Performed - Jet Perforation
1988-01-25 Perforation Treatment Performed - Fractured
1988-02-02 Well Log Performed
2006-05-04 Perforation Treatment Performed - Jet Perforation
2006-05-06 Perforation Treatment Performed - Jet Perforation
2006-07-25 Perforation Treatment Performed - Fractured
2006-10-06 Well Began Production
2006-10-06 Well Fluid changed to Gas
2006-10-06 Well Mode changed to Flowing
2007-08-01 Well Fluid changed to Gas
2007-08-01 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-05-31 Perforation 623.50 624.50 5
1982-05-31 Perforation 625.50 627.00 5
1982-06-02 Fracture 623.50 627.00 0
1982-06-07 Perforation 443.00 445.50 7
1982-06-07 Packing Device Capped w/Cement 607.00 615.00 0
1982-06-08 Fracture 443.00 445.50 0
1982-06-10 Perforation 373.00 375.50 7
1982-06-10 Fracture 373.00 375.50 0
1988-01-15 Packing Device Capped w/Cement 438.00 440.00 0
1988-01-15 Perforation 365.00 368.00 7
1988-01-19 Fracture 365.00 368.00 0
1988-01-22 Perforation 329.00 335.00 7
1988-01-22 Perforation 345.00 349.00 7
1988-01-25 Fracture 329.00 349.00 0
2006-05-04 Perforation 345.00 349.00 7
2006-05-04 Perforation 365.00 368.00 7
2006-05-04 Perforation 373.00 375.00 7
2006-05-06 Perforation 466.00 467.00 13
2006-05-06 Perforation 465.00 466.00 7
2006-05-06 Perforation 464.00 465.00 13
2006-05-06 Perforation 463.50 464.00 13
2006-07-25 Fracture 463.50 467.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2007 8661 0.0 0.0 0.0
2008 8320 0.0 0.0 0.0
2009 8641 0.0 0.0 0.0
2010 8232 0.0 0.0 0.0
2011 8695 0.0 0.0 0.0
2012 8688 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8123 0.0 0.0 0.0
2019 7502 0.0 0.0 0.0
2020 1390 0.0 0.0 0.0

For data sources see[5]

References