X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0134042506003"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0134042506003
 
| Well ID: 0134042506003
| style="height=100%; align=center" rowspan="14" | {{#display_map: 50.11060900000001084, -110.42995299999995495 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 50.110609, -110.429953 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/06-25-013-04W4/3
 
| Location: 00/06-25-013-04W4/3
 +
|-
 +
| Location Alias: 00/06-25-13-04 W4M
 +
|-
 +
| Location Alias 2: 00/06-25-013-04 W4/03
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 013
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 04
 +
|-
 +
| Section: 25
 +
|-
 +
| County/Municipality: [[Cypress County,_Alberta|Cypress County]]
 
|-
 
|-
 
| Well Name: PINE CLIFF MEDHAT 6-25-13-4
 
| Well Name: PINE CLIFF MEDHAT 6-25-13-4
 +
|-
 +
| Operator Name: [[Pine Cliff Energy Ltd.]]
 +
|-
 +
| License Number: 0064474
 
|-
 
|-
 
| License Date: 1977-06-24
 
| License Date: 1977-06-24
 
|-
 
|-
| Final Drilling Date: 1978-10-10
+
| License Status: Issued
 
|-
 
|-
| Total Depth: 733.0m
+
| Spud Date: 1977-06-25
 
|-
 
|-
| Fluid Type: Gas
+
| Final Drill Date: 1978-10-10
 
|-
 
|-
| Status: Abandoned Zone
+
| Well Total Depth: 733.00 m
 
|-
 
|-
| Well Type: Not Applicable
+
| Surface Hole Latitude: 50.110609
 
|-
 
|-
| Configuration: Vertical
+
| Surface Hole Longitude: -110.429953
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 
|-
 
|-
| Latitude: 50.11060900000001084
+
| 1909-09-09
 +
| Well Log Performed
 
|-
 
|-
| Longitude: -110.42995299999995495
+
| 1977-06-24
 +
| Obtained License
 
|-
 
|-
 +
| 1977-08-10
 +
| Perforation Treatment Performed - Selective Bullet Perforations
 +
|-
 +
| 1977-08-15
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1977-10-10
 +
| Perforation Treatment Performed - Selective Bullet Perforations
 +
|-
 +
| 1977-11-05
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1977-11-08
 +
| Perforation Treatment Performed - Selective Bullet Perforations
 +
|-
 +
| 1977-11-11
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1978-10-10
 +
| Finished Drilling
 +
|-
 +
| 1978-10-10
 +
| Perforation Treatment Performed - Open-Hole Completion
 +
|-
 +
| 1978-10-10
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1978-12-13
 +
| Well Began Production
 +
|-
 +
| 1978-12-13
 +
| Well Fluid changed to Gas
 +
|-
 +
| 1978-12-13
 +
| Well Mode changed to Flowing
 +
|-
 +
| 1980-08-13
 +
| Well Fluid changed to Gas
 +
|-
 +
| 1980-08-13
 +
| Well Mode changed to Suspended
 +
|-
 +
| 1981-09-21
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1981-09-21
 +
| Well Fluid changed to Gas
 +
|-
 +
| 1981-09-21
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
  
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 1977-08-10
 +
| Selective Bullet Perforations
 +
| style="text-align: right;" | 607.50
 +
| style="text-align: right;" | 608.10
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1977-08-10
 +
| Selective Bullet Perforations
 +
| style="text-align: right;" | 610.20
 +
| style="text-align: right;" | 610.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1977-08-10
 +
| Selective Bullet Perforations
 +
| style="text-align: right;" | 611.40
 +
| style="text-align: right;" | 612.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1977-08-10
 +
| Selective Bullet Perforations
 +
| style="text-align: right;" | 612.60
 +
| style="text-align: right;" | 613.30
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1977-08-10
 +
| Selective Bullet Perforations
 +
| style="text-align: right;" | 613.90
 +
| style="text-align: right;" | 614.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1977-08-10
 +
| Selective Bullet Perforations
 +
| style="text-align: right;" | 616.90
 +
| style="text-align: right;" | 617.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1977-08-10
 +
| Selective Bullet Perforations
 +
| style="text-align: right;" | 618.10
 +
| style="text-align: right;" | 619.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1977-08-10
 +
| Selective Bullet Perforations
 +
| style="text-align: right;" | 620.00
 +
| style="text-align: right;" | 621.60
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1977-08-10
 +
| Selective Bullet Perforations
 +
| style="text-align: right;" | 621.20
 +
| style="text-align: right;" | 625.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1977-08-10
 +
| Selective Bullet Perforations
 +
| style="text-align: right;" | 628.50
 +
| style="text-align: right;" | 628.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1977-08-15
 +
| Fracture
 +
| style="text-align: right;" | 607.50
 +
| style="text-align: right;" | 628.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1977-10-10
 +
| Selective Bullet Perforations
 +
| style="text-align: right;" | 471.20
 +
| style="text-align: right;" | 471.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1977-10-10
 +
| Selective Bullet Perforations
 +
| style="text-align: right;" | 473.00
 +
| style="text-align: right;" | 473.70
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1977-10-10
 +
| Selective Bullet Perforations
 +
| style="text-align: right;" | 474.30
 +
| style="text-align: right;" | 474.90
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1977-10-10
 +
| Selective Bullet Perforations
 +
| style="text-align: right;" | 476.70
 +
| style="text-align: right;" | 477.30
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1977-10-10
 +
| Selective Bullet Perforations
 +
| style="text-align: right;" | 478.50
 +
| style="text-align: right;" | 479.10
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1977-10-10
 +
| Selective Bullet Perforations
 +
| style="text-align: right;" | 479.80
 +
| style="text-align: right;" | 480.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1977-10-10
 +
| Selective Bullet Perforations
 +
| style="text-align: right;" | 481.00
 +
| style="text-align: right;" | 484.30
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1977-10-10
 +
| Selective Bullet Perforations
 +
| style="text-align: right;" | 487.10
 +
| style="text-align: right;" | 491.30
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1977-10-10
 +
| Selective Bullet Perforations
 +
| style="text-align: right;" | 494.40
 +
| style="text-align: right;" | 499.90
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1977-10-10
 +
| Selective Bullet Perforations
 +
| style="text-align: right;" | 509.60
 +
| style="text-align: right;" | 509.60
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1977-11-05
 +
| Fracture
 +
| style="text-align: right;" | 471.20
 +
| style="text-align: right;" | 509.60
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1977-11-08
 +
| Selective Bullet Perforations
 +
| style="text-align: right;" | 446.20
 +
| style="text-align: right;" | 446.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1977-11-08
 +
| Selective Bullet Perforations
 +
| style="text-align: right;" | 447.40
 +
| style="text-align: right;" | 448.10
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1977-11-08
 +
| Selective Bullet Perforations
 +
| style="text-align: right;" | 448.70
 +
| style="text-align: right;" | 449.30
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1977-11-08
 +
| Selective Bullet Perforations
 +
| style="text-align: right;" | 449.90
 +
| style="text-align: right;" | 450.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1977-11-08
 +
| Selective Bullet Perforations
 +
| style="text-align: right;" | 451.70
 +
| style="text-align: right;" | 452.90
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1977-11-08
 +
| Selective Bullet Perforations
 +
| style="text-align: right;" | 453.50
 +
| style="text-align: right;" | 454.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1977-11-08
 +
| Selective Bullet Perforations
 +
| style="text-align: right;" | 455.40
 +
| style="text-align: right;" | 457.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1977-11-08
 +
| Selective Bullet Perforations
 +
| style="text-align: right;" | 459.00
 +
| style="text-align: right;" | 465.10
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1977-11-11
 +
| Fracture
 +
| style="text-align: right;" | 446.20
 +
| style="text-align: right;" | 465.10
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1978-10-10
 +
| Open Hole/Barefoot Completion
 +
| style="text-align: right;" | 670.90
 +
| style="text-align: right;" | 733.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1981-09-21
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 642.00
 +
| style="text-align: right;" | 650.00
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 1978
 +
| style="text-align: right;" | 476
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1979
 +
| style="text-align: right;" | 3482
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = ST37: List of Wells in Alberta
+
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2015-07-02
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2015-07-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
 
==References==
 
==References==
 
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta]][[Category:Wells]]

Revision as of 00:26, 10 July 2020

Well Details

Well ID: 0134042506003
Loading map...
Location: 00/06-25-013-04W4/3
Location Alias: 00/06-25-13-04 W4M
Location Alias 2: 00/06-25-013-04 W4/03
Country: Canada
Province: Alberta
Township: 013
Meridian: 4
Range: 04
Section: 25
County/Municipality: Cypress County
Well Name: PINE CLIFF MEDHAT 6-25-13-4
Operator Name: Pine Cliff Energy Ltd.
License Number: 0064474
License Date: 1977-06-24
License Status: Issued
Spud Date: 1977-06-25
Final Drill Date: 1978-10-10
Well Total Depth: 733.00 m
Surface Hole Latitude: 50.110609
Surface Hole Longitude: -110.429953

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-06-24 Obtained License
1977-08-10 Perforation Treatment Performed - Selective Bullet Perforations
1977-08-15 Perforation Treatment Performed - Fractured
1977-10-10 Perforation Treatment Performed - Selective Bullet Perforations
1977-11-05 Perforation Treatment Performed - Fractured
1977-11-08 Perforation Treatment Performed - Selective Bullet Perforations
1977-11-11 Perforation Treatment Performed - Fractured
1978-10-10 Finished Drilling
1978-10-10 Perforation Treatment Performed - Open-Hole Completion
1978-10-10 Well Mode changed to Drilled and Cased
1978-12-13 Well Began Production
1978-12-13 Well Fluid changed to Gas
1978-12-13 Well Mode changed to Flowing
1980-08-13 Well Fluid changed to Gas
1980-08-13 Well Mode changed to Suspended
1981-09-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-09-21 Well Fluid changed to Gas
1981-09-21 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-08-10 Selective Bullet Perforations 607.50 608.10 0
1977-08-10 Selective Bullet Perforations 610.20 610.80 0
1977-08-10 Selective Bullet Perforations 611.40 612.00 0
1977-08-10 Selective Bullet Perforations 612.60 613.30 0
1977-08-10 Selective Bullet Perforations 613.90 614.50 0
1977-08-10 Selective Bullet Perforations 616.90 617.50 0
1977-08-10 Selective Bullet Perforations 618.10 619.40 0
1977-08-10 Selective Bullet Perforations 620.00 621.60 0
1977-08-10 Selective Bullet Perforations 621.20 625.80 0
1977-08-10 Selective Bullet Perforations 628.50 628.50 0
1977-08-15 Fracture 607.50 628.50 0
1977-10-10 Selective Bullet Perforations 471.20 471.80 0
1977-10-10 Selective Bullet Perforations 473.00 473.70 0
1977-10-10 Selective Bullet Perforations 474.30 474.90 0
1977-10-10 Selective Bullet Perforations 476.70 477.30 0
1977-10-10 Selective Bullet Perforations 478.50 479.10 0
1977-10-10 Selective Bullet Perforations 479.80 480.40 0
1977-10-10 Selective Bullet Perforations 481.00 484.30 0
1977-10-10 Selective Bullet Perforations 487.10 491.30 0
1977-10-10 Selective Bullet Perforations 494.40 499.90 0
1977-10-10 Selective Bullet Perforations 509.60 509.60 0
1977-11-05 Fracture 471.20 509.60 0
1977-11-08 Selective Bullet Perforations 446.20 446.80 0
1977-11-08 Selective Bullet Perforations 447.40 448.10 0
1977-11-08 Selective Bullet Perforations 448.70 449.30 0
1977-11-08 Selective Bullet Perforations 449.90 450.50 0
1977-11-08 Selective Bullet Perforations 451.70 452.90 0
1977-11-08 Selective Bullet Perforations 453.50 454.20 0
1977-11-08 Selective Bullet Perforations 455.40 457.20 0
1977-11-08 Selective Bullet Perforations 459.00 465.10 0
1977-11-11 Fracture 446.20 465.10 0
1978-10-10 Open Hole/Barefoot Completion 670.90 733.00 0
1981-09-21 Packing Device Capped w/Cement 642.00 650.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 476 0.0 0.0 0.0
1979 3482 0.0 0.0 0.0

For data sources see[5]

References